Appeal 3344309
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
conversion of existing five bedroom dwelling to create 4 x flats; partial roof extension; addition of terrace and demolition of existing garage.
Section 02
Decision
The appeal is allowed and the planning permission [name]/23/00523/FUL for conversion of existing five bedroom dwelling to create 4 x flats; partial roof extension; addition of terrace and demolition of existing garage at [site address] granted on 20 February 2024 by North Northamptonshire Council, is varied by deleting conditions 6 and 7.
Section 03
Preliminary Matters
On 12 December 2024 the Government published a revised version of the National Planning Policy Framework (the Framework). The guidance on matters which are in dispute within this appeal has not materially changed. Therefore, I have not consulted the parties on the changes to the Framework.
Section 04
Main Issue
The main issue is whether conditions 6 and 7 are necessary and reasonable to ensure that the proposal does not have a harmful effect on protected species.
Section 05
Reasons
On 17 August 2023 the Council’s ecologist noted that [name] (GCN) survey and licence returns were found near the site. They asked for the appellant’s ecologist to review these findings to assess any potential impacts on GCNs near the site. The appellant responded on 10 November 2023 indicating that the nearest pond where GCNs were recorded was approximately 1km away and that a licence application was issued in 2013 for an area approximately 700m from the appeal property. The appellant’s ecologist advised that these distances were well beyond consideration for GCNs regardless of the size of development, unless GCNs had been recorded on site. Also, the appellant’s ecologist advised that there is no habitat within the appeal site that would be suitable for GCNs, and that the area is an extremely inhospitable environment for GCNs for various reasons.
The Council’s ecologist was consulted on these comments but did not provide a response. The application was determined over three months after the comments were provided. No evidence or extenuating circumstances have been provided to explain why the Council’s ecologist could not respond within that timeframe.
The information was provided by a suitably qualified ecologist who works for a CIEEM1 registered practice. It addressed the Council’s concerns in full. Without evidence to the contrary, I cannot conclude that further information would be required to ensure that the proposal would not have a harmful effect on GCNs. It would also not be reasonable to attach a condition requesting information that has already been submitted, consulted upon, and where the consultee has had a significant amount of time to respond.
For these reasons, I conclude that Condition 6 is neither necessary nor reasonable and therefore, should be removed from the planning permission. Condition 7
On 19 June 2023 the Council’s ecologist commented that a Preliminary Bat Roost Assessment should be carried out to ensure that there are no material concerns regarding bats and their roosts. Subsequently the appellant submitted a [name] Report2 ([name]). The Bat Report concluded that the structure has low suitability for roosting bats and the habitat present within the site has negligible suitability for foraging and commuting bats. The Bat Report concluded that no further surveys would be required and did not recommend any mitigation measures.
The Council’s ecologist was reconsulted on the planning application following the submission of the [name]. On 17 August they provided comments in relation to GCNs but did not make any comments on the [name]. 6 months passed between the ecologist’s final comments and the determination of the application. No reason or extenuating circumstances have been put forward to explain why the Council’s ecologist did not comment on the [name] prior to the determination of the planning application. 1 Chartered Institute of Ecology and Environmental Management 2 [site address] , [name] to [name], [name], EcoLine Environmental, August 2023
The Bat Report was produced by a suitably qualified ecologist who works for a CIEEM registered practice, and the survey was undertaken within the optimum period. The results are not yet two years old and were very recent when submitted to the Council. Without evidence to the contrary, I cannot come to a different conclusion to that stated within the [name]. Therefore, the submission of further evidence would not be necessary to ensure that the proposal would not have a harmful effect on bats.
The Council has indicated that they would be willing to change the wording of Condition 7 so that it would require the submission of a [name] rather than a Preliminary Bat Roost Assessment. As above, it would not be reasonable to attach a condition requesting information that has already been submitted, consulted upon, and where the consultee has had a significant time to respond.
For these reasons, I conclude that Condition 7 is neither necessary nor reasonable and therefore, should be removed from the planning permission.
Section 06
Other Matters
An interested party has indicated that the rights of neighbouring occupiers under Article 1 of the first protocol and Article 8 of the Human Rights Act 1998 would be violated if the appeal were allowed. The proposed roof terrace would be on the other side of the road from the neighbouring garden on [address]. The separation and intervening boundary treatment would ensure that the neighbouring garden would not be overlooked such that neighbouring occupiers would suffer unacceptable harm to their living conditions. I am satisfied that a grant of planning permission would not unacceptably interfere with the neighbouring occupiers’ rights to the peaceful enjoyment of their possessions and to a private and family life and home. It is proportionate in these circumstances to allow the appeal.
The Grade II listed 61 Little Street3 neighbours the appeal property. It dates to the late 18th Century/early 19th Century and contains several historical features including squared coursed limestone walls and a wooden columned porch. In accordance with Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (the 1990 Act) I shall have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses. The appeal proposal would not alter the listed building and would maintain the relationship between the two properties. The appeal property would continue to be in residential use and the modest external alterations would be on the far side of the property from the listed building. Therefore, the appeal proposal would preserve the setting of [address].
Part of the appeal property is within Rushden Conservation Area (CA). In accordance with Section 72(1) of the 1990 Act, I shall pay special attention to the desirability of preserving or enhancing the character or appearance of the area. The significance of the CA partly derives from the historic pattern of development surrounding Rushden Town Centre. The appeal proposal would include sympathetically designed alterations to the appeal property which would maintain the prevailing pattern of development and design of nearby buildings. As such, the proposal would preserve both the character and appearance of the CA. 3 [name]: 1266102
The appeal property is in proximity to Upper Nene Valley Gravel Pits Special Protection Area (SPA) which is designated as a protected site due to its international importance as wetland habitat for non-breeding waterbirds.
Recreational disturbance is one of the principal threats to the habitat and to the waterbirds themselves. The Upper Nene Gravel Pits Special Protection Area Supplementary Planning Document 2015 and the Upper Nene Gravel Pits Special Protection Area Supplementary Planning Document Addendum to the [name]: [name] 2016 ([name]) identifies that a net increase in dwellings within 3km radius of the SPA would result in a likely significant effect on it, unless avoidance and mitigation measures are implemented.
As the appeal property is within 3km of the SPA, I conclude that by itself, and in combination with other development in the area, it would have a likely significant effect on the SPA due to increased recreational disturbance. As the competent authority, it is necessary for me to conduct an Appropriate Assessment in relation to the effect of the development on the integrity of the SPA.
Given the modest scale of the proposed development and site constraints, there is no scope for on-site mitigation. In this instance, it is appropriate to secure a financial contribution toward [name] and Monitoring. This approach is advocated for within the [name].
The Council has confirmed that a per dwelling contribution has been received from the appellant. I am satisfied that the Council as a responsible public body will transfer the funds to the organisation responsible for administering the mitigation. Moreover, the [name] has been endorsed by Natural England. I am therefore satisfied that a contribution toward mitigation has been secured and will be used for its intended purposes. In turn, I am satisfied that the mitigation measures would overcome the proposal’s harmful effect on the SPA. Consequently, there is no clear reason to refuse planning permission on this basis.
Section 07
Conclusion
For the reasons given above the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5389No official casework-database value to compare
- Extracted decision date · page 1
- 5 February 2025Matches the official casework database
- Extracted site visit dates
- 15 January 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3344309
- Application reference
- NE/23/00523/FUL
- Lead case reference
- Not recorded
- Planning authority
- North Northamptonshire
- Planning authority code
- Not recorded
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.02 hectares
- Floor space
- Not recorded
- Number of residences
- 3
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- No
- Relates to a conservation area
- Yes
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- Yes
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 14 May 2024
- Valid date
- 15 May 2024
- Start date
- 4 July 2024
- Planning authority decision date
- 20 February 2024
- Appeal decision date
- 5 February 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 64037
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21