Appeal 3344766
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
first floor extension (above existing ground floor extension), re-build gable end, dormer windows to rear and rooflights to front.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have used the description of development that is common to the Council’s decision notice and the appeal form as this is more concise than the description provided on the application form.
The Council has highlighted a discrepancy between the submitted floor plans and elevations. However, as the appeal is being dismissed, it has not been necessary to seek further clarification on this matter.
Section 04
[name]
The main issues are the effect of the development on: i) the character and appearance of the host building and surrounding area; ii) the living conditions of the occupiers of 1 [name], with particular regard to outlook and overshadowing.
Section 05
Character and appearance
The appeal property is one half of a pair of hipped-roof, semi-detached houses located in an established residential area.
The appellant claims that the building is already unbalanced as a result of the existing side extension. However, the existing extension has not altered the original hipped roof design of the building. Thus, whilst there has been some effect on the symmetry in the pair, the overall sense of balance and core shape of the building is retained.
In contrast, the proposed hip-to-gable alteration and first floor side extension would fundamentally alter the core shape of the building and cause it to appear far more unbalanced when viewed from the street. The set back from the front elevation and lower ridge line of the extension would do little to assist in this regard. Consequently, this element of the proposal would seriously harm the character and appearance of the host building and the street scene in which it is situated.
The proposal also includes two flat roof dormer windows at the rear. These would be set in from the edges of the roof and apart from each other. Despite this, they would be wide and bulky features, and taken together, would occupy a large proportion of the extended rear roofslope. Their presence would be further heightened by the use of a contrasting cladding material. As a result, the dormers would be unduly dominant and unsympathetic additions to the building. That said, public views of the dormers would only be glimpsed and in a context of other dormers of various shapes and sizes. The effect on the wider surrounding area would therefore be more limited in this regard.
Considering the scheme as a whole, I find that the proposal would not constitute well-designed and sympathetic additions to the host building and street scene. As such, there is conflict with Policies DS1 and DS3 of Bradford’s Core Strategy Development Plan Document (2017) (the CS), which among other things, require that development is well designed and should make a positive contribution to the streetscape and the character of the area in which it is situated. In addition, despite compliance with the Council’s Householder Supplementary Planning Document (SPD) in some respects, there is conflict with the overarching aim of [name] 1, which states that the size, position and form of extensions and dormer windows should maintain or improve the character and quality of the original house and wider area.
Section 06
Living conditions
The side of the appeal property faces the rear of 1 [name], which lies to the north and at a lower level. The rear elevation of 1 [name] contains a number of habitable windows at ground and first floor level, while the rear garden is short in length and contains a small prefabricated garage and driveway along the common boundary.
The appellant refers to the impact of the existing side extension. However, the existing extension has a relatively modest eaves height and the roof slopes away from the boundary. Clearly, the intention of the design was to reduce its scale and massing along the boundary, taking account of the difference in ground levels and close physical relationship of the properties.
The proposed first floor side extension would be appreciably taller, with its gable wall now extending well above the upper floor rear windows of 1 [name]. This would cause the extension to appear inescapably dominant and overbearing from the rear windows and garden of 1 [name].
Furthermore, as the proposed first floor side extension would lie directly to the south of 1 [name], it would likely cause additional overshadowing of this neighbour’s rear garden at certain times, to the further detriment of the enjoyment of this outdoor space.
I therefore find that the proposed first floor side extension would unacceptably harm the living conditions of the occupiers of 1 [name] in terms of outlook and overshadowing. As such, there is conflict with Policy DS5 of the CS where it seeks to protect the amenity of existing residents. There is also conflict with [name] 3 of the SPD, which states that extensions should not over dominate, seriously damage outlook or unacceptably reduce natural daylight reaching any neighbour’s property.
Section 07
Other Matters
Any benefits the proposal may bring in terms of improved internal living accommodation at the appeal property would not justify or outweigh the harm that would be caused and the resultant conflict that arises with the development plan as a whole.
Section 08
Conclusion
For the reasons given above, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 597No official casework-database value to compare
- Extracted decision date · page 1
- 8 July 2024Matches the official casework database
- Extracted site visit dates
- 2 July 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3344766
- Application reference
- 24/00495/HOU
- Lead case reference
- Not recorded
- Planning authority
- City of Bradford Metropolitan District Council
- Planning authority code
- E08000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 May 2024
- Valid date
- 21 May 2024
- Start date
- 28 May 2024
- Planning authority decision date
- 2 April 2024
- Appeal decision date
- 8 July 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 53679
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21