Skip to main content
Official casework recordDismissedCurrent release

Appeal 3344959

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a loft conversion and alterations.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The description of development in the heading above has been taken from the planning application form. [name] of the appeal form it is stated that the description of development has not changed but, nevertheless, a different wording has been entered. Neither of the main parties has provided written confirmation that a revised description of development has been agreed. Accordingly, I have used the one given on the original application form.

  3. Section 04

    [name]

    The main issues are: • whether the proposal would be inappropriate development in the Green Belt for the purposes of development plan policy and the National Planning Policy Framework (the Framework); • the effect of the proposal on the openness of the Green Belt; and • if it is inappropriate, whether the harm to the Green Belt by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the development.

  4. Section 05

    Whether the proposal is inappropriate development

    The Framework explains that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open and that the essential characteristics of Green Belts are their openness and their permanence.

    The appeal site comprises a detached dwelling set back from [address]. The dwelling is in a raised position with land levels decreasing significantly down towards the access and [address]. The dwelling has a hipped roof over part of the building, with the remainder finished with a flat roof. The proposal includes the extension of the dwelling through the addition of a first floor with a half-hipped roof.

    Policy CP3 of the Tonbridge and Malling Borough Council Local Development Framework Core Strategy 2007 (CS) establishes the extent of the Green Belt and states that National Green Belt policy will be applied. Paragraph 154 of the Framework regards the construction of new buildings as inappropriate in the Green Belt. An exception to this is the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. The Framework defines “original building” as being a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally.

    Neither the Framework nor the development plan provide a definition of ‘disproportionate additions’ and therefore an assessment of whether a proposal would amount to a disproportionate addition over and above the size of the original building is a matter of planning judgement.

    Planning permission was granted under reference 86/11395/FUL for a single storey extension to the dwelling. The subsequent construction of this, considerably extended the original building. The significant scale and massing of the appeal proposal would, therefore, make it a disproportionate addition to the original building when considered with this previous addition.

    I find that the proposal would result in a disproportionate addition over and above the size of the original building. Therefore, the proposal would be inappropriate development which is, by definition, harmful to the Green Belt. Consequently, the proposal would conflict with Policy CP3 of the CS and with the Framework, which seeks to protect the Green Belt from harm.

  5. Section 06

    Openness

    The Framework identifies the essential characteristics of Green Belts as being their openness and their permanence. The dwelling is set back from [address] and is partially enclosed by trees and hedges limiting the potential for views of the development. However, the substantial additional bulk at first floor level would considerably increase the visual effect of the dwelling on the surrounding area. Moreover, whilst the footprint is unaltered, the increased scale and massing of the proposed development would result in a harmful reduction in the spatial openness of the Green Belt.

    For these reasons, the proposal would harm the openness of the Green Belt. The development would therefore conflict with Policy CP3 of the CS and the Framework.

  6. Section 07

    Other considerations

    Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Substantial weight should be given to harm to the Green Belt and ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reasons of inappropriateness, and any other harm resulting from the appeal development, is clearly outweighed by other considerations.

    I have already identified the proposal would be inappropriate development and would harm the spatial openness of the Green Belt. Consequently, I do not accept the appellant's assertion of an absence of ‘actual harm’ and so this consideration carries minimal weight.

    The flat roof of the existing dwelling is unsympathetic and is uncommon within the area. While the proposal would provide a more appropriate roof form to the dwelling, the lower height and discreet position of the existing dwelling limits its visual effect within the surroundings. Consequently, while the proposal would result in a visual enhancement of the property, the benefits would be restricted by the low impact that the dwelling has on the character and appearance of the area. Accordingly, I attribute moderate weight to this consideration.

    The appellant has drawn my attention to an appeal decision in [name] where the Inspector considered that the improvement of the appearance of an appeal property amounts to very special circumstances to outweigh any harm from the proposal by reason of being inappropriate. However, I have not been presented with sufficient information, including the characteristics of that site and the surrounding area, from which to draw suitable comparisons with the appeal scheme. In any case, each proposal should be considered on its individual merits and with appropriate regard to the development plan and any material considerations, which is what I have done in this case. Accordingly, this consideration carries limited weight.

    Planning permission has previously been granted under reference TM/14/02014/FL for a pitched roof over the bungalow. The approved scheme comprised a smaller addition at first floor level, which would have a lesser effect on the openness of the Green Belt than the appeal proposal. Nonetheless, given that this permission is no longer extant, the weight I can afford it is limited.

    The appellant has referred me to development, which has been carried out at North Downs and [address]. However, I have not been presented with the full details of these proposals to make a suitable comparison, including in respect of the size of the original dwellings and the precise details of the very special circumstances. Therefore, I cannot be certain that the circumstances are similar to that at the appeal site. Consequently, this consideration carries minimal weight.

    The appellant has referred to the provision of permitted development rights to allow for the enlargement and alteration of dwellinghouses. There is no substantive evidence before me to demonstrate how permitted development rights would be utilised to extend the dwelling. Furthermore, the proposal should be considered on its individual merits with appropriate regard to the development plan and any material considerations, which is what I have done in this case. Consequently, this consideration carries minimal weight.

    The appellant states that due to a lack of affordable housing in the area, the proposal would allow for the provision of accommodation for the appellant’s family. While the Council may not be able to demonstrate a five year supply of deliverable housing sites and is failing to deliver its housing requirement for the purposes of the [name], the proposal for an extension to an existing dwelling would not assist in the boosting the supply and delivery of housing in the Borough. Moreover, the evidence before me does not demonstrate whether there is a shortfall of affordable housing and that the Council is not meeting its requirements in this regard. Accordingly, the weight I can attribute to this consideration is limited.

    For these reasons I find that the other considerations in this case, as set out above, do not clearly outweigh the harm to the Green Belt that I have identified. Consequently, the very special circumstances necessary to justify the development do not exist. The proposal therefore conflicts with Policy CP3 of the CS and with Paragraph 154 c) of the Framework.

  7. Section 08

    Conclusion

    The proposal would not accord with the development plan as a whole. The other considerations in this case do not indicate that a decision should be made otherwise than in accordance with the development plan. For the reasons given above I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 20880No official casework-database value to compare
    Extracted decision date · page 1
    20 November 2024Matches the official casework database
    Extracted site visit dates
    14 October 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3344959
Application reference
TM/23/03532
Lead case reference
Not recorded
Planning authority
Tonbridge and Malling Borough Council
Planning authority code
E07000115

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
23 May 2024
Valid date
23 May 2024
Start date
15 July 2024
Planning authority decision date
1 March 2024
Appeal decision date
20 November 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
60330
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21