Appeal 3345101
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect on the character and appearance of the appeal dwelling and that of the local area, with reference to the Woodford Bridge Conservation Area (the CA).
Section 04
Reasons
The appeal dwelling is a two storey mid terrace Victorian house with small front area rear gardens. It is located in a part of the street predominantly fronted by similar properties. However, many of these, including the appeal dwelling have render or pebbledash front elevations, with a significant number of rear box dormer roof extensions evident. These interventions have weakened the common architectural characteristics and unaltered features that would have originally given strong architectural cohesion to the streetscape. The significance of the area as a heritage asset has been recognised by the Council through the designation of the CA in 2020.
The appeal dwelling falls within a character area of the CA that is recognised as an early phase of the area’s suburban development. The Woodford Bridge Conservation Area [name] (2014) identifies the terraced properties in [address], including the appeal dwelling, as of some historic interest and worthy of preserving. The CA is a heritage asset to which I have a statutory duty under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990. I must pay special attention to the desirability of preserving or enhancing the character or appearance of a Conservation Area.
The proposal is for a loft conversion that would involve the insertion of two roof lights to the front roof slope and the addition of a flat roofed rear box dormer extension to the rear roof slope, which would be clad in tiles to match the existing roof with two rear windows that generally reflect the scale and form of the existing rear windows to the property. The proposal would result in a larger house with additional living space, which is a significant private rather than public benefit.
The proposed extensions would align with the existing roof ridge and be set in approximately 0.3 metres in from the eaves and 0.6 metres from the party wall with [address] (No.6). This does not accord with the design guidance for such extensions set out in the Council’s Housing Design Supplementary Planning Document (2019) (the SPD). This sets out that such extensions should be symmetrically located, 0.5 metres below the roof ridge, 1 metre from the eaves and 1m in from shared boundaries.
[name] recognise that the appeal dwelling is small in scale, the proposal does not reflect this scale or respond in its box design and asymmetrical location to the architectural expression of the appeal dwelling. Consequently, the proposed dormer extension would appear to dominate the appeal dwelling and to not appear as a secondary or subordinate addition.
The appellant has drawn my attention to other properties in the immediate locality that I was able to see on my site visit. These are of varying age, and I have limited planning background on some, but the appellant has also provided me with examples of large and full width dormer extensions that accord with the permitted development allowances of the PPG. Whilst these do form part of the physical context to the proposal, the detrimental effect of these on the character and appearance of their host properties and the local area is evident.
The proposal would be readily evident in rear views of the property from [address] and in these views the scale, box like massing and asymmetrical positioning of the proposed extension would not reflect the pitched roofs to dwellings and outriggers to the rear of the dwellings in the terrace. As a result, the proposal would appear unduly prominent and dominating within the local streetscape. This would add to the existing detrimental effect I have identified that results from the existing box dormer extensions in the local area. Consequently, the proposal would fail to reflect the contribution that the appeal dwelling makes to the streetscape of this part of the CA and its significance as a
Section 05
heritage asset.
For the reasons given above, I find that the proposed development would be harmful to the character and appearance of the host dwelling and that of the local area, failing to preserve or enhance that of the CA. This would be contrary to Policies LP26, LP30 and LP33 of the Redbridge Local Plan 2015-2030 (2018), Policies D3 and HC1 of the London Plan (2021) and sections 12 and 16 of the National Planning Policy Framework (2023). Collectively these seek to ensure that development is of high design quality, responds to local character and context and is compatible with the existing area character and patterns of development and preserves or enhances the appearance or character of conservation areas.
Section 06
Planning Balance and Conclusion
Whilst the proposed dormer extension would provide additional living space, benefiting existing and future occupiers, this is not a substantial public benefit. In general, planning decisions should be made in the wider public interest. In this context, the harm I have identified, including the less than substantial harm to the significance of the CA outweighs these benefits. Dismissing the appeal is a proportionate response in this instance.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 209No official casework-database value to compare
- Extracted decision date · page 1
- 29 October 2024Matches the official casework database
- Extracted site visit dates
- 9 October 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3345101
- Application reference
- 0278/24
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Redbridge
- Planning authority code
- E09000026
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- Yes
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 May 2024
- Valid date
- 10 June 2024
- Start date
- 25 June 2024
- Planning authority decision date
- 19 April 2024
- Appeal decision date
- 29 October 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 59172
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21