Skip to main content
Official casework recordAllowedCurrent release

Appeal 3345131

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘Resubmission of Application No. 22/01201/FUL - Erection of a part two storey and part single storey side and rear extension to the northern elevation, single storey side and rear extension to the southern elevation and provision of first floor Juliet balconies (following demolition of existing side conservatory and existing detached outbuilding)’.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of a part two storey and part single storey side and rear extension to the northern elevation, single storey side and rear extension to the southern elevation, and provision of first floor Juliet balconies (following demolition of existing side conservatory and existing detached outbuilding) at [site address] , [site address] , Pilling, Lancashire, [postcode] , in accordance with the terms of the application, Ref 23/00877/FUL, and the plans submitted with it, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with approved plans 22011_LOC, 22011_11S [name], 22011_110 [name], 22011_111 [name], 22011_310 [name].

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be undertaken in accordance with the mitigation measures specified within the site-specific Flood Risk Assessment, prepared by [name], dated January 2024. https://www.gov.uk/planning-inspectorate - APP/U2370/D/24/3345131

  2. Section 03

    Preliminary Matters

    In my decision at paragraph 1, I have removed the reference within the proposal’s description to it being a ‘Re-submission of Application No. 22/01201/FUL’, as this does not describe an act of development.

    Since the appeal was lodged, the government has published “Proposed reforms to the NPPF and other changes to the planning system”, the “National Planning Policy Framework: draft text for consultation”, and the Secretary of State’s written ministerial statement entitled “Building the homes we need”. These documents have not raised any new matters which are determinative to the outcome of this appeal.

    During the course of the appeal, the [name] 1 Strategic Flood Risk Assessment, [name] 2024, (SFRA), has been published. This is a material consideration in the determination of the appeal, which I will return to below.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the property itself, and the surrounding area.

  4. Section 05

    Reasons

    The proposed development relates to a generously sized, detached, two-storey dwelling, set within a large plot in the countryside. Other houses extend along the eastern side of [site address] to the north and south. These houses vary in age, size and style, albeit they are generally set back from the road and benefit from large plots, which results in a pleasant sense of openness that contributes positively to the rural setting.

    The dispute between the main parties relates only to the two-storey side extension proposed to the north. The Council has raised no concerns with the other aspects of the proposal. Having considered the proposed plans and following my own observations, I have no reason to disagree.

    The proposed two storey side extension would be large in scale, extending to 8.8m in width, which would substantially increase the width and size of the property overall. I note the concerns of the Parish Council also in relation to the increased footprint of the property. However, the existing ridge height would not be exceeded, and a second gable feature would have a staggered arrangement in relation to other frontage features, which would provide articulation to the front elevation. Further, three windows at first floor level and two garage doors would serve to break up the massing of this second gable feature. While the proposed extension would be large, and it would not necessarily be sub-ordinate in scale to the original dwelling, it would be set back from the existing front gable and so it would not appear overly dominant or obtrusive. The resulting design and appearance of the dwelling itself would be cohesive.

    Additionally, given the varying scale and style of other dwellings within the locality, many of which are substantially sized, the resulting scale and design of the proposed dwelling would not appear out of character in the wider context. The plot of the host dwelling is of a sufficient size to accommodate https://www.gov.uk/planning-inspectorate - APP/U2370/D/24/3345131 the proposed extensions without appearing cramped. As a result, the sense of space that presently exists to this and neighbouring plots, which adds positively to the open and rural character of the countryside at this location, would not be adversely impacted.

    For these reasons, the proposal would not harm the character and appearance of the property itself, or the surrounding area. The proposal would comply with policies SP4 and CDMP3 of the Wyre Local Plan (2011- 2031)(incorporating partial update of 2022), adopted January 2023, which collectively and amongst other matters, require that all development is designed to a high standard that respects or enhances the character of the area, including the open and rural character of the countryside. While the proposed extension would not be sub-ordinate in scale to the host dwelling, given that I have found the proposal would not be overly dominant and that there would not be harm to the appearance of the original property as a result, the guiding design principles of the Council’s Extending Your Home Supplementary Planning Document, November 2007, would be suitably addressed.

  5. Section 06

    Other Matters

    The recently published SFRA places the appeal site partially within indicative [name] 3b. In respect to [name] 3b, the SFRA states that for areas outside of the detailed model coverage, [name] 3a has been used as a conservative indication, and that further work should be undertaken as part of detailed site-specific Flood Risk Assessment (FRA) to define and refine the extent of [name] 3b where no detailed modelling exists. It goes on, that caution should be applied where the conservative [name] 3b extent encompasses existing urban areas which would not otherwise be "designed to flood"’. While a site-specific FRA is provided for the appeal scheme, it pre-dates publication of the SFRA.

    Both parties have had the opportunity to comment on the recently published SFRA. The Council raises no further objection to the proposed development as it does not consider that the developed property would be at risk throughout it’s expected lifetime, nor would it increase the flood risk to neighbouring properties. From the information before me I have no reason to disagree. However, the Council’s Officer Report (OR) does suggest that the mitigation measures contained within the FRA should be secured by the imposition of a condition. Such a condition would be necessary to minimise flood risk to the appeal scheme.

  6. Section 07

    Conditions

    In addition to the condition to secure flood risk mitigation measures, I have imposed conditions for the standard time limit and specifying the approved plans, which provides certainty. I have also imposed a condition requiring matching materials to safeguard the character and appearance of the appeal property and surrounding area.

    The Council’s OR discusses the potential for the loss of privacy for the occupiers of nearby properties, from use of the flat roof extensions to the rear and south. To address this concern, the report suggests that a condition is required to secure details of the proposed ‘Juliet’ balconies. However, the https://www.gov.uk/planning-inspectorate - APP/U2370/D/24/3345131 plans and elevations indicate fixed obscured glass balustrades to those openings leading onto these roof areas, which would restrict access. As such, it does not appear necessary to secure further details by condition.

    Reference is also made within the Council’s OR to a requirement to condition reasonable avoidance measures for newts, on the basis that there is a garden pond on the appeal site and a further pond to the east. However, I have been provided with no evidence to suggest that newts are present in the locality and so it has not been demonstrated that a condition to this effect is necessary.

  7. Section 08

    Conclusion

    For the reasons set out above, having had regard to the development plan as a whole and all other material considerations, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4077No official casework-database value to compare
    Extracted decision date · page 1
    17 October 2024Matches the official casework database
    Extracted site visit dates
    4 September 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3345131
Application reference
23/00877/FUL
Lead case reference
Not recorded
Planning authority
Wyre Borough Council
Planning authority code
E07000128

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
28 May 2024
Valid date
28 May 2024
Start date
17 July 2024
Planning authority decision date
11 March 2024
Appeal decision date
17 October 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
58599
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21