Appeal 3345285
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the construction of a new vehicular access to crossover the existing highway verge and pedestrian footway with the installation of dropped kerb.
Section 02
Decision
The appeal is allowed and planning permission is granted for the construction of a new vehicular access to crossover the existing highway verge and pedestrian footway with the installation of dropped kerb at [site address] in accordance with the terms of the application, [name]/2024/0000543/HHA, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan, Site Plan Ref: TQRQM24080125811347.
The hedge shown on the Site Plan shall be reduced in height to 0.9 metres before the dropped kerb is brought into use. The hedge or any subsequent boundary treatment shall be retained at a height of no more than 0.9 metres thereafter.
Section 03
Main Issue
The main issue in this case is the effect of the proposed development on highway safety along [name].
Section 04
Reasons
No 123 is an end-terrace house located on [name]. The property currently has a hard landscaped driveway. There is a soft surface shared side access between Nos 123 and 125 to which a dropped kerb already exists. The front garden has a side-boundary hedge with No 121 to the south-east. The area to the front of the houses on this part of the Highway consists of a pedestrian pavement immediately outside of the property, followed by a grassed strip and then a hard-surfaced area beside the highway. The hard-surfaced area is currently used extensively for vehicle parking and this situation would appear to be accepted by the Council.
Policy AC2 of the Coventry City Council Local Plan, adopted in December 2017, indicates that new development proposals which could have a negative impact on the safety of the highway network should mitigate and manage any traffic growth to ensure that they do not cause unacceptable levels of highway safety problems. Paragraph 115 of the National Planning Policy Framework (NPPF) indicates that development should only be refused on highways grounds if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe. I consider that Policy AC2 is consistent with policy in the NPPF.
In this case, the Highway Authority has expressed concern regarding the impact of existing parking along the road on visibility; the effect of the boundary hedge on pedestrian visibility splays; the impact of a tree close to the shared side access; and potential increased run-off across the pavement into the road.
There are very few dropped kerbs along this section of [name]. In those that were apparent, cars appeared to have been reversed into the parking space at the property. There would be no difference with the proposed situation at the appeal site. However, parallel parking on the hard-surfaced area beside the highway is prevalent and already requires vehicles to manoeuvre off the road into available space. I do not consider that the proposed drop-kerb would result in any additional manoeuvring or render visibility at the highway edge any worse than is currently the case.
The application form notes that the hedge boundary would be restricted to a height of 0.9 metres, and this can be controlled by condition, as noted by the Council. The application form also shows a drainage channel at the front boundary of the property which would ease run-off issues. Finally, the nearby tree is situated within the grassed strip outside No 125, in the middle of the pavement area, and it would not interfere with visibility along that part of the pavement used by pedestrians, nor would it affect visibility along the road for any vehicle approaching the highway across the pavement area.
The Council has expressed concern that the proposed dropped-kerb access would be close to a roundabout on [name]. However, it would appear to be around 50 metres from the exit of the roundabout and is unlikely to be harmful to the traffic flow at that distance. The Highway Authority has not identified this issue as a concern.
Finally, the appellant has noted other examples of dropped-kerb proposals that have been approved by the Council, including proposals at No 115, which is closer to the roundabout, in 2021; No 139 in 2017; Nos 163 and 165 in 2021; and No 236 in 2022. In each case, it would appear that the Council has consistently considered there to be no significant harm to highway safety. Whilst each proposal must be considered on its own individual merits, I find that there is very little difference in practice between these earlier cases and that of the current proposal, and that there would be little, if any, harm to highway safety caused by the scheme at No 123.
Section 05
Conditions
I have attached a condition relating to plans because it is necessary that the development shall be carried out in accordance with the approved plans for the avoidance of doubt and in the interests of proper planning. I have attached a further condition relating to boundary treatment in the interests of clarity and to protect the safety of pedestrians using the pavement along this part of [name].
Section 06
Conclusion
I find that the proposed dropped kerb and access would not be harmful to highway safety along [name] and would not conflict with Policy AC2 of the LP or with national policy contained in the NPPF. Accordingly, I allow the appeal, subject to the conditions above.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 239No official casework-database value to compare
- Extracted decision date · page 1
- 30 August 2024Matches the official casework database
- Extracted site visit dates
- 16 August 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3345285
- Application reference
- PL/2024/0000543/HHA
- Lead case reference
- Not recorded
- Planning authority
- Coventry City Council
- Planning authority code
- E08000026
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 29 May 2024
- Valid date
- 31 May 2024
- Start date
- 4 July 2024
- Planning authority decision date
- 16 May 2024
- Appeal decision date
- 30 August 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 56410
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21