Appeal 3345357
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
retention of single storey rear orangery extension.
Section 02
Decision
The appeal is allowed, and planning permission is granted for the retention of single storey rear orangery extension at [site address] in accordance with the terms of the application, [name]/2023/02463/MINFHO and the plans submitted with it.
Section 03
Procedural Matters
The application form made clear that development had commenced however was not complete. At the time of my site visit the external works appeared complete. The application had been submitted retrospectively and I have dealt with the appeal on that basis.
On 30 July 2024, the Government published a consultation on proposed reforms to the National Planning Policy Framework (2023) (the Framework). The consultation and draft Framework do not constitute Government policy or guidance. However, they are capable of being material considerations in appeals. Notwithstanding this, in relation to this appeal the aims of both sets of policies are similar. No party would be prejudiced or caused any injustice by me proceeding with the appeal in light of the consultation.
Section 04
Main Issue
The main issue in this appeal is the effect of the proposed development on the living conditions of the occupiers of the neighbouring property.
Section 05
Reasons
[address] Extension Guidelines Supplementary Planning Document (2010) (the SPD)) highlights that the Council will apply the 45-degree guide to ascertain what is likely to be acceptable. The development encroaches on the 45-degree sight line. Nevertheless, the SPD recognises that there will be greater flexibility to extend at single storey to the rear of properties and that the 45-degree guide would not always be appropriate depending on site specific factors including orientation.
The development extends 6.1m from the rear of the appeal property along the shared boundary with the neighbouring property, No. [address]. The height of the development 3.1m to the eaves and 3.6m to the top of the lantern roof. Whilst a high boundary fence exists between the properties the extension is significantly higher.
The extension extends along the shared boundary which is set at an obtuse angle to the rear of the neighbouring property (No. 9). The extension infills the area between the fence and the previously approved rear extension1. I understand a smaller conservatory was approved in this location; however, the appeal development exceeds this by approximately 2m.
No. [address] has a rear part two storey and single storey extension off set from the boundary with the appeal property, which has secondary windows facing the development. A large ground floor bay window with glazed door exists on the original rear elevation of No. 9 closer to the shared boundary.
There is an increase in scale of the development compared to the approved conservatory. However, due to the angled built form of the extension combined with the space between the extension at No. 9 and the development I find that the appeal development is not visually overbearing and does not create a sense of enclosure to the occupiers of the neighbouring property.
I conclude that the proposed development would not be harmful to the living conditions of the occupiers of the neighbouring property.
There is no conflict with Policy P14 of the Solihull Local Plan, Shaping a [name] (2013) which amongst other things seeks to ensure developments respect the amenity of existing and proposed occupiers and would be a good neighbour.
There is also no conflict with the Framework which seeks to ensure developments have high standards of amenity for existing and future users.
Section 06
Conclusion
For the above reasons I conclude that this appeal should be allowed.
Conditions relating to standard time limit for commencement of development, plans to be adhered to and materials to be used are not relevant or necessary as the development appears externally complete.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 126No official casework-database value to compare
- Extracted decision date · page 1
- 10 October 2024Matches the official casework database
- Extracted site visit dates
- 2 September 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3345357
- Application reference
- PL/2023/02463/MINFHO
- Lead case reference
- Not recorded
- Planning authority
- Solihull Metropolitan Borough Council
- Planning authority code
- E08000029
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 30 May 2024
- Valid date
- 30 May 2024
- Start date
- 4 July 2024
- Planning authority decision date
- 8 March 2024
- Appeal decision date
- 10 October 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 58270
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21