Skip to main content
Official casework recordAllowedCurrent release

Appeal 3345357

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

retention of single storey rear orangery extension.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for the retention of single storey rear orangery extension at [site address] in accordance with the terms of the application, [name]/2023/02463/MINFHO and the plans submitted with it.

  2. Section 03

    Procedural Matters

    The application form made clear that development had commenced however was not complete. At the time of my site visit the external works appeared complete. The application had been submitted retrospectively and I have dealt with the appeal on that basis.

    On 30 July 2024, the Government published a consultation on proposed reforms to the National Planning Policy Framework (2023) (the Framework). The consultation and draft Framework do not constitute Government policy or guidance. However, they are capable of being material considerations in appeals. Notwithstanding this, in relation to this appeal the aims of both sets of policies are similar. No party would be prejudiced or caused any injustice by me proceeding with the appeal in light of the consultation.

  3. Section 04

    Main Issue

    The main issue in this appeal is the effect of the proposed development on the living conditions of the occupiers of the neighbouring property.

  4. Section 05

    Reasons

    [address] Extension Guidelines Supplementary Planning Document (2010) (the SPD)) highlights that the Council will apply the 45-degree guide to ascertain what is likely to be acceptable. The development encroaches on the 45-degree sight line. Nevertheless, the SPD recognises that there will be greater flexibility to extend at single storey to the rear of properties and that the 45-degree guide would not always be appropriate depending on site specific factors including orientation.

    The development extends 6.1m from the rear of the appeal property along the shared boundary with the neighbouring property, No. [address]. The height of the development 3.1m to the eaves and 3.6m to the top of the lantern roof. Whilst a high boundary fence exists between the properties the extension is significantly higher.

    The extension extends along the shared boundary which is set at an obtuse angle to the rear of the neighbouring property (No. 9). The extension infills the area between the fence and the previously approved rear extension1. I understand a smaller conservatory was approved in this location; however, the appeal development exceeds this by approximately 2m.

    No. [address] has a rear part two storey and single storey extension off set from the boundary with the appeal property, which has secondary windows facing the development. A large ground floor bay window with glazed door exists on the original rear elevation of No. 9 closer to the shared boundary.

    There is an increase in scale of the development compared to the approved conservatory. However, due to the angled built form of the extension combined with the space between the extension at No. 9 and the development I find that the appeal development is not visually overbearing and does not create a sense of enclosure to the occupiers of the neighbouring property.

    I conclude that the proposed development would not be harmful to the living conditions of the occupiers of the neighbouring property.

    There is no conflict with Policy P14 of the Solihull Local Plan, Shaping a [name] (2013) which amongst other things seeks to ensure developments respect the amenity of existing and proposed occupiers and would be a good neighbour.

    There is also no conflict with the Framework which seeks to ensure developments have high standards of amenity for existing and future users.

  5. Section 06

    Conclusion

    For the above reasons I conclude that this appeal should be allowed.

    Conditions relating to standard time limit for commencement of development, plans to be adhered to and materials to be used are not relevant or necessary as the development appears externally complete.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 126No official casework-database value to compare
    Extracted decision date · page 1
    10 October 2024Matches the official casework database
    Extracted site visit dates
    2 September 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3345357
Application reference
PL/2023/02463/MINFHO
Lead case reference
Not recorded
Planning authority
Solihull Metropolitan Borough Council
Planning authority code
E08000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
30 May 2024
Valid date
30 May 2024
Start date
4 July 2024
Planning authority decision date
8 March 2024
Appeal decision date
10 October 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
58270
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21