Appeal 3345910

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the demolition/dismantling of existing shed; erection of single storey side extension at 2 [name], The Willows, [address], Knockholt [postcode] in accordance with the terms of the application reference 23/03541/HOUSE subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 3081 (20) 002, 3081 (20) 003 [name], 3081 (20) 004, 3081 (02) 1250 [name], 3081 (20) 1250 [name] and outbuilding removal plan (REP-01).

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    No development above the damp proof course shall be carried out to the extension hereby approved, until the existing buildings (half of shed to rear of the site and tool sheds 1 and 2), have been demolished and all resulting materials removed from the site, in accordance with the outbuilding removal plan (REP-01) and proposed ground and first floor plan (3081 (20) 002).

  2. Section 03

    [name]

    My attention has been drawn to the extensive planning history of the site, including planning permission reference 23/02284/HOUSE, approved in October

    Also a previous appeal on the site was dismissed in September 2021 (Planning Inspectorate reference APP/G2245/D/21/3271754). I shall have regard to this background when considering the merits of this proposal. _________________________________________________________________________________ __________________________________________________________________________________________

  3. Section 04

    [name]

    The main issues are: • whether the proposal constitutes inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; ⚫ the effect of the proposal on the openness of the Green Belt; and • whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  4. Section 05

    Whether inappropriate development

    The appeal site comprises a two-storey, detached house with off-street parking on the driveway to the front. It is situated on the peripherals of the village of Knockholt, with the wider area being countryside of fields and woodland.

    The Framework states that a local planning authority should regard the construction of new buildings as inappropriate in the Green Belt. This is subject to certain exceptions, which include at paragraph 154 (c) ‘the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.'

    The Framework defines the date of an ‘original building’ as 1 July 1948, or as originally built if constructed after that date. Policy GB1 of the [name] and Development Management Plan 2015 (‘the ADMP’) is broadly consistent with the Framework in this respect.

    The Framework does not define what constitutes a disproportionate addition. Policy GB1 states, amongst other things, that the total floor space of the proposal, together with any previous extensions, alterations and outbuildings should not result in an increase of more than 50% above the floor space of the original dwelling (measured externally) including outbuildings within 5m of the dwelling.

    The Council puts forward a figure of some 141% uplift for the cumulative external floor space increase when one adds the appeal scheme to previous works to the original home. This figure is not disputed by the appellant. With a change from an original home of around 107 m2 to the proposal now leading to about 258 m3, I find it impossible to reach a view other than there would be a failure of the ‘disproportionate additions’ test.

    Judging the scheme in accordance with Policy GB1, I consider that the proposed extension, together with the previous additions to the dwelling, would amount to a disproportionate addition over and above the size of the original building. This would represent inappropriate development within the Green Belt and would not benefit from the exception in paragraph 154 (c) of the Framework. Consequently, there would be conflict with Policy GB1 of the ADMP. _________________________________________________________________________________ ___________________________________________________________________________________________

  5. Section 06

    Openness

    The Framework makes it clear that an essential characteristic of Green Belts is their openness. Open can mean the absence of development irrespective of the degree of visibility of the site from public vantage points; development which would harm openness could be acceptable visually. In other words, openness of the Green Belt has a spatial aspect as well as a visual aspect and the absence of visual intrusion does not in itself mean that there is no impact on the openness of the Green Belt as a result of development.

    In this case, the proposal would involve the addition of considerable built form. By occupying an area that is currently undeveloped, the addition would inevitably reduce the spatial openness of the site. Overall, I find the element would have a modest, but nonetheless clearly discernible effect on the openness of the Green Belt.

  6. Section 07

    Other considerations

    The scheme approved under application 23/02284/HOUSE is, to all intents and purposes, the same scale and height as that now proposed by this appeal. The only differences are that the extension would comprise matching materials to the main dwelling, and the inclusion of an internal doorway allowing for access into the host property. Taking a pragmatic approach, I am satisfied that there would be no adverse impacts in Green Belt terms above and beyond that which has already been permitted, with the use of matching materials being an improvement having regard to the character and appearance of the dwelling.

  7. Section 08

    Green Belt Balance

    I am required by the Framework to give substantial weight to the harm the extension causes to the Green Belt by virtue of its inappropriateness and to openness. However, I consider that the other considerations in this case clearly outweigh this harm. Looking at matters as a whole, I am of the view that very special circumstances exist which justify the proposal.

  8. Section 09

    Conditions

    I have considered the imposition of conditions in light of advice in Planning Policy Guidance and the National Planning Policy Framework. In addition to the standard implementation condition, the approved plans are listed for certainty. A condition requiring external materials to match those on the existing dwelling would provide for a satisfactory appearance, and one requiring removal of the existing sheds would accord with the 23/02284/HOUSE in ensuring the protection of the openness of the Green Belt.

  9. Section 10

    Conclusion

    Having regard to all issues put forward and my reasoning above, I allow the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 212No official casework-database value to compare
    Extracted decision date · page 1
    11 October 2024Matches the official casework database
    Extracted site visit dates
    24 September 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3345910
Application reference
23/03541/HOUSE
Lead case reference
Not recorded
Planning authority
Sevenoaks District Council
Planning authority code
E07000111

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
7 June 2024
Valid date
7 June 2024
Start date
25 July 2024
Planning authority decision date
26 April 2024
Appeal decision date
11 October 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
58338
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21