Appeal 3346055
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
“Two storey side extension and single storey rear extension, upgrading of existing garden room. (Amended description)”.
Section 02
Decision
The appeal is allowed and the planning permission Ref 23369/003 for a two storey side extension and single storey rear extension, and upgrading of existing garden room at [site address] , [site address] , Ropley, Alresford, Hampshire [postcode] granted on 12 December 2023 by East Hampshire District Council, is varied by deleting condition No 4, and is otherwise subject to the conditions listed below:
The development hereby permitted shall be constructed in accordance with the materials specified within the approved details, unless details of other suitable materials are otherwise agreed in writing by the Local Planning Authority.
Within two months of the date of substantial completion, a minimum of one integrated bat box or swift nest box shall be installed within the site. The bird units shall be installed as per the manufacturer's instructions and shall be retained and maintained thereafter.
The development hereby permitted shall be carried out in accordance with the following approved plans and particulars: Application form Location & block plan Existing floor plans Existing elevations Proposed floor plans Proposed elevations
Section 03
Background and Main Issue
Planning permission for the development permitted was granted in December 2023 (the approved scheme), as set out in the banner heading above. The current proposal is to remove the requirement of condition 4 for the “first floor window in the principle south east elevation” of the approved development to be permanently: (i) glazed with obscure glass with a glass panel which has been rendered obscure as part of its manufacturing process to Pilkington glass classification 5 (or equivalent of glass supplied by an alternative manufacturer), and (ii) non-opening below 1.7 metres from the finished floor level of the room in which the window is installed.
Although this condition does not explicitly specify which first floor south east elevation window it applies to, the officer report refers to an ensuite bathroom that was considered appropriate to secure obscure-glazing and opening restriction below 1.7m through a condition, to safeguard neighbouring privacy. Therefore, my assessment of this appeal will relate to that window.
The appellant has stated that they may wish to use the bathroom subject of this appeal as a dressing room or office space. The LPA has indicated that this is acceptable in principle, and any application to amend the approved drawings and / or planning conditions would be determined on its merits. Such amendments however cannot be considered under this appeal, as it relates solely to the plans and conditions of the approved scheme.
During my site visit, I noted that the approved scheme was under construction, although the first-floor window glazing subject of this appeal had not been installed. This room was therefore not habitable at the time of my visit, and the overall approved scheme was not substantially complete. As the trigger point for the condition in dispute is the occupation of the approved scheme, it appears that this condition has not been breached despite works having already commenced. I have determined the appeal on this basis.
Therefore, the main issue is the effect that removing condition 4 would have on the living conditions of nearby occupiers, with particular regard to privacy.
Section 04
Reasons
The appeal site ( [site address] ) comprises a two-storey detached dwelling within open and spacious grounds, with access via a long private driveway off a cul-de-sac laneway towards the end of [site address] . There are a number of mature trees and shrubs within and surrounding the site, which is also surrounded by other dwellings of varying size and layout.
The long front garden grounds of [site address] decline significantly towards [site address] . This allows for intervisibility between the host dwelling and [address] sited to the southwest. [site address] and the approved scheme benefits from an existing first floor clear glazed bathroom window on its southeast elevation. This clear glazing was present at the time of my visit, and the submitted plans indicate that it can be retained as such to serve a bathroom irrespective of the outcome of this appeal. This window is closer to [address] and its garden than the new window subject to the appeal. Views to and from [address] to the proposed clear glazed window would be of a significant distance and at an oblique angle. The window proposed is also not particularly wide, which would restrict expansive views beyond its point of orientation. The resultant impact on the respective privacy between these neighbours would be no greater than the existing situation.
The proposed clear glazed bathroom window would be closer to the dwelling and garden of [address]. The angle of views available would however be very oblique. This juxtaposition between these dwellings and garden areas would be sufficient to avoid adverse loss of privacy, even though the existing tree and shrub screening is deciduous and somewhat sporadic in density, and would be even more so throughout the winter months. Views would remain oblique and of sufficient distance to avoid harm to future occupiers
The dwelling of Fairways is sited at further distance away from the proposed window, on the opposite side of [site address] and in close proximity to the laneway. The Council’s concerns stem from the decrease in land levels from north to south towards this neighbour and the highway. At the time of my visit, existing views were largely restricted by mature trees within the front garden and along the driveway of [site address] . Although these trees are deciduous, the distances from this neighbour and along [site address] up to the proposed window are nonetheless considerable, despite the change in land levels and even when the trees would be not in leaf. The proposed clear glazed window would therefore not lead to any harm in terms of privacy.
The use of a window in an ensuite bathroom would be more sensitive than use as a habitable room, and the plans indicate a bathtub adjacent to the window. I also accept that the photos submitted by the appellant appear to have been taken during spring or summer, when trees were in full leaf. The LPA has also highlighted the possibility that the shrubbery within [site address] and surrounding plots could be entirely removed due to the lack of statutory protection such as a Tree Preservation Order. Even if this were to happen, I am satisfied that the separation distances and oblique angles between [site address] and all surrounding neighbours are sufficient to avoid adverse impacts on the privacy of all occupiers. It is therefore also not necessary to restrict any opening height of the window in question.
The Council suggests that it would never be considered appropriate for any bathroom window to be clear glazed. There is no planning policy requirement before me that sets out such a specific blanket approach for all dwellings. I have assessed the proposal on its own merits and following a site visit. Although no neighbouring objections have been received, I have borne in mind the importance of protecting the living conditions and well-being of future occupiers of [site address] and the surrounding dwellings.
I have found that the removal of condition 4 would not have an adverse impact on living conditions of nearby occupiers, with particular regard to privacy. Accordingly, there is no conflict with Policy CP27 of the East Hampshire District Local Plan: [name] (2014) and Policy RNP11 of the Ropley Neighbourhood Plan (2019). Collectively, these policies seek, amongst other things, development to avoid an unacceptable or significant effect on the amenity of neighbouring occupiers through loss of privacy. I also find no conflict with Paragraph 135 f) of the National Planning Policy Framework, which seeks to create places that promote health and well-being, with a high standard of amenity for existing and future users.
Section 05
Conditions
I have considered those conditions imposed on the approved scheme in accordance with the Planning Practice Guidance (PPG). As the approved scheme has now commenced, the condition governing the implementation period is no longer necessary.
The compliance condition governing the materials to be used for the development is still necessary in the interests of the character and appearance of the host dwelling and surrounding area, and is therefore reimposed as condition No 1. The condition requiring installation of bat box(es) or swift nest box(es) within the site within two months of the date of substantial completion, and subsequent retention and maintenance, is still necessary in the interests of biodiversity, so will also be reimposed as condition No 2. I have corrected a typographic error relating to the word “integrated”. The plans condition is necessary as the development has commenced and must be completed in accordance with the listed drawings in the decision, and is thus reimposed as condition No 3.
Section 06
Conclusion
For the reasons given above, I conclude that the appeal should be allowed and I vary the planning permission by deleting the disputed condition No 4. I have also deleted the condition governing the implementation period. I have also reinstated the other conditions that are still subsisting and capable of taking effect.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4438No official casework-database value to compare
- Extracted decision date · page 1
- 6 December 2024Matches the official casework database
- Extracted site visit dates
- 29 October 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3346055
- Application reference
- 23369/003
- Lead case reference
- Not recorded
- Planning authority
- East Hampshire District Council
- Planning authority code
- E07000085
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 10 June 2024
- Valid date
- 10 June 2024
- Start date
- 17 July 2024
- Planning authority decision date
- 12 December 2023
- Appeal decision date
- 6 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61264
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21