Appeal 3346875
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a two-storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matter
Although not shown on the submitted plans or mentioned in the representations, a large box dormer has recently been inserted in the rear roof of the appeal dwelling. I have not been informed whether this was built as a result of a planning permission or as permitted development.
Notwithstanding the out-of-date plans, the existence of the new roof structure stands as a material consideration to be taken into account in my assessment of the appeal proposal.
Section 04
Main issues
The main issues are the effect of the proposed development: (a) on the character and appearance of the host property and its surroundings; (b) on the living conditions of the occupants of the neighbouring dwelling at [address] with reference to sunlight, daylight and visual impact.
Section 05
Reasons
The appeal property is a semi-detached brick-built dwelling with a ground floor bay at the front. Its adjoined partner is virtually identical at the front. A stone tablet inserted in the front elevation indicates that the pair were known as ‘[name] when first built. To the rear the pair has a pitched roof two-storey protrusion. A single-storey lean-to structure has been added to the rear of the appeal property.
The proposed extension would be the same depth as the existing two-storey protrusion and lean-to. The ground floor element would be wider than the existing, with the eastern wall of the extension acting as a continuation of the dwelling’s main flank wall. The first floor extension would be inset, presumably so as to allow light into the only window serving a bedroom in one of the dwelling’s rear bedrooms. The first floor extension would have a flat roof meeting the main structure of the house at its eaves.
Combined with the large, prominent box dormer, I find the proposal to be of a mundane and unattractive design which would completely transform the rear of the attractive Victorian house to its detriment both in terms of its appearance and character. I note the appellant’s references to other examples of similar development and the tight knit compact character of local development, but none that I saw has the same detrimental visual effect as the appeal proposal, were it built.
As the appellant rightly says, the extensions at the rear would hardly be apparent in the public realm. I regard this as the only advantage of the scheme in planning terms. However, several neighbours would see the complete poorly-designed development clearly from their gardens, and some from within their houses. The Government attaches considerable importance to design, and the National Planning Policy Framework advises that development that is not well designed should be refused. I propose to follow that guidance here.
I therefore conclude that the proposal, in combination with the roof extension recently carried out, would harm the character and appearance of the host property and the surrounding area. Accordingly, a material conflict arises with the main objectives of policy SWDP21 of the South Worcestershire Development Plan (SWDP), requiring development to be of a high quality design, integrating effectively with its surroundings, and in keeping with the architectural characteristics of the original property and its surroundings.
Section 06
Living conditions
Although not specifically mentioned in the reasons for refusal the property most at risk from any ill-effects of the development is next-door, No 10. This has two sets of windows at ground floor level nearest to the proposed extension, one facing towards the rear garden and the other towards the appeal property.
The proposed ground floor extension would have little or no effect on the residents of No 10, in view of the fence that separates their respective curtilages. However, the upward extension would bring a vertical wall at first floor level relatively close to the windows concerned. I have not been provided with calculations or illustrative material in relation to the 450 degree ‘rule’ mentioned in the representations, but it seems to me judging from what I saw, that the development would inevitably reduce the level of daylight and sunlight entering those windows of concern. Additionally, the extension combined with the large box dormer sitting above it would be perceived as an oppressive and overbearing structure when viewed from next door.
Taking all these factors into account, the proposal could rightly be considered as an unneighbourly development resulting in harmful consequences to the immediately neighbouring residents. Thus the development would conflict with those provisions of SWDP policy SWDP21 designed to protect neighbouring amenity. 2
Section 07
Other matters
I have taken account of all other matters raised in the representations including the appellant’s point that no neighbour raised an objection to the proposal. I do not consider this to be decisive since the development would endure for a substantial period of time and, as I have found, is unacceptable from a planning standpoint.
No other matter raised is of such strength or significance as to outweigh those factors which led me to conclusions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 11 September 2024Matches the official casework database
- Extracted site visit dates
- 29 August 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3346875
- Application reference
- 24/00127/HP
- Lead case reference
- Not recorded
- Planning authority
- Worcester City Council
- Planning authority code
- E07000237
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 24 June 2024
- Valid date
- 24 June 2024
- Start date
- 10 July 2024
- Planning authority decision date
- 18 April 2024
- Appeal decision date
- 11 September 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 56934
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21