Appeal 3347211
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
removal of part of the existing boundary wall to allow improved access to the property.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have adopted the description of development as set out in the Application Form.
The Council’s Delegated Report (CDR) refers to substantial changes that are shown to take place to the ground levels within the site to accommodate the improved pedestrian access to the appeal property. They consider these works amount to development and proceeded to determine the application on the basis that the proposal related to the removal of part of the stone wall and the associated groundworks. Even so, that is not the proposal that is before me, which is described as removal of part of the existing boundary wall. Whether the associated groundworks require planning permission is also not a matter that is before me and not a matter that I can comment on.
The Appellants Appeal Statement (AAS) contends that the groundworks are minor, which does not appear to be supported by the submitted section of the new path leading up to the appeal property. Even so, the AAS clearly states that the application only sought planning permission to remove part of the stone boundary wall and did not seek permission for any groundworks or any alterations to the existing front garden to the appeal site. In view of this, I have proceeded to determine the appeal on the basis that planning permission is only sought for the removal of part of the existing boundary wall.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area with particular regard to the appeal sites location within the Upton Conservation Area.
Section 05
Reasons
The appeal site lies within the Upton Conservation Area (UCA). Section 72(1) of the Planning (Listed Buildings and Conservation Area) Act 1990 requires, therefore, that special attention be paid to the desirability of preserving or enhancing the character or appearance of that area. Similar advice is to be found in the National Planning Policy Framework (December 2023) (NPPF) and in policies DE1 (Design) and SS10 (Conservation and the historic environment) of the Torbay Local Plan 2012 to 2030 (December 2015) (TLP) and policies TH8 (Established architecture) and TH10 (Protection of the historic built environment) of the Torquay Neighbourhood Plan (June 2019) (TNP).
The Council’s reason for refusal also refers to policy HE1 (Listed buildings) of the TLP. As its name implies, this policy relates to the impact of development on Listed Buildings. However, my attention has not been drawn to any nearby Listed Buildings and as such this policy is not, in my view, relevant.
The Council’s Upton Conservation Area [name] (CACA) is dated July 2005. The purpose of this document is to define and analyse the special interest which constitutes the character and appearance of the area, and the qualities that warrant its designation as a conservation area. The document provides a basis for decision making and assists in interpreting and applying the relevant heritage policies of the development plan and NPPF.
The CACA sates that the UCA is located at the heart of Torquay and includes a number of areas that are defined by their function, ranging from the Civic complex of Edwardian properties to Victorian and Edwardian residential villas. The latter comprise detached, semi detached and terraced properties in an informal arrangement, within an area that exhibits pronounced changes in its topography. The historic built environment is largely, therefore, a product of the 19th Century. The CACA continues by identifying ‘character areas’ with the appeal site falling within ‘No.2 [name], Thurlow & [name].’ The latter is described as having an informal layout with early to mid-19th Century detached villas in large gardens mostly on higher ground. It also refers to subsequent infilling in the character area from the late 19th Century, the 1920’s and 1930’s as well as later 20th Century developments of flats.
Paragraph 7.3 of the CACA identifies the key features of special importance to the UCA, which it seeks to protect and enhance. These key features include, amongst others, the “high survival of extensive boundary walls and gate piers using local limestone rubble.” The CACA also includes a number of ‘[name] including ‘[name] which identifies the character areas, Listed Buildings and other key buildings or groups of buildings. The key buildings include 5 – [address] (No’s 5 & 7) located to the south east of the appeal site. ‘[name] identifies ‘[name] which includes ‘Prominent walls’. The whole of the wall to the front boundary of the appeal site is defined as a ‘Prominent wall’. This map also shows that No's 5 & 7 have largely unspoilt frontages retaining significant period detail, as do the properties to their south.
All of the above factors contribute, in my judgement, to the special interest and significance of the UCA as a whole.
[name] confirmed earlier, the appeal proposal would involve the demolition of part of the existing stone wall to create an improved pedestrian access to the appeal property. The proposal would involve the removal of some 2.6 metres of the existing boundary wall.
Within the above context and as I observed on site, the existing boundary wall to the appeal site is visually prominent and forms an integral part of a larger stone wall that dominates this part of the streetscene. It creates a strong sense of enclosure and forms part of an expanse of aged stone wall that wraps itself around the appeal site and then extends up the hill in front of 9A to 13A (odd) [address]. All of this wall is identified as ‘Prominent walls’. As with similar walls within the UCA it is an important feature of architectural and historic interest. That importance is accentuated by the fact that the appeal site is located adjacent to key buildings that include unspoilt frontages that retain significant period features.
The removal of even part of this historic wall would, in my view, have a negative impact on the character and appearance of the UCA. The proposal would replace the wall with a large gap leading to a wider access path which would represent a discordant and visually dominant feature that would harm the important contribution that this part of the stone wall plays within the streetscene and this part of the UCA.
For the reasons set out above, I find that the appeal proposal would result in harm to the character and appearance of the UCA and as such it would not preserve or enhance the character or appearance of the UCA. As is required, particularly by the NPPF, considerable importance and weight must be attached to the harm to this heritage asset. The appeal proposal would lead to less than substantial harm to the significance of this heritage asset which must be weighed against any public benefits of the development.
The Appellant states that the proposal would improve pedestrian access for the existing elderly occupier and at the same time secure improvements for future occupiers. [name] sympathise with the personal circumstances of the Appellant, these improvements are to the private access that serves the appeal property and would thus only benefit existing and future occupiers and owners. They are not public benefits and would not deliver, in my view, either economic or social or environmental objectives.
Reference has been made to the work that the proposal would generate for a local builder, but that is a common factor where most new built development is proposed and it is not, therefore, a benefit to which any weight can be accorded. The Appellant also refers to the use of high quality materials, but that is a standard requirement for all new development, in particular where that development is permitted within a conservation area. Consequently, the latter is again not a benefit to which any weight can be accorded.
Based on all the above factors, none of the considerations referred to nor any other public benefits, delivering either economic or social or environmental objectives, would, in my view, be sufficient to outweigh the harm I have identified to the significance of the heritage asset.
The Appellant has referred to examples of where the wall appears to have been removed to provide improved access to other properties on [address]. I have not been provided with any planning background to these examples or any evidence as to if and when they were approved, what policy guidance was in place at the time or whether they were undertaken under permitted development or prior to the designation of the conservation area. Even so, in relation to [address] I note that this does not fall within the area defined as ‘Prominent walls’ in the CACA. Whilst [address] does fall within this definition, as I observed on site the works to that property have had a harmful impact on the character and appearance of this part of the UCA. It is not, therefore, an example of the type of work that should be replicated. As the CACA also states, it is these types of losses or damage that the designation of the conservation area seeks to protect so that the special interest of the area is preserved or enhanced. The existence of these examples does not, therefore, provide any justification for the appeal proposal or affect the findings I have reached on this issue.
I accept that there were no objections from local residents but that is not an indication that the proposal is otherwise acceptable and neither does it negate the need for the proposal to be assessed against local and national policies that seek to preserve or enhance designated heritage assets.
Accordingly, I find that the proposed development would be contrary to policies DE1 and SS10 of the TLP, policies TH8 and TH10 of the TNP and paragraphs 195, 203, 205 – 206 and 208 of the NPPF.
Section 06
Conclusion
For the reasons given above and having taken all the matters raised into account, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 248No official casework-database value to compare
- Extracted decision date · page 1
- 13 December 2024Matches the official casework database
- Extracted site visit dates
- 9 December 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3347211
- Application reference
- P/2024/0150
- Lead case reference
- Not recorded
- Planning authority
- Torbay Council
- Planning authority code
- E06000027
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 400 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 June 2024
- Valid date
- 28 July 2024
- Start date
- 11 July 2024
- Planning authority decision date
- 19 April 2024
- Appeal decision date
- 13 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61779
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21