Skip to main content
Official casework recordAllowedCurrent release

Appeal 3347522

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a proposed two storey front extension to provide first floor accessible shower room, alterations to existing single storey side extension and general refurbishment of the existing dwelling.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a proposed two storey front extension to provide first floor accessible shower room, alterations to existing single storey side extension and general refurbishment of the existing dwelling at [site address] , Essex [postcode] in accordance with the terms of the application reference 24/00110/FUL subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: PL 001, PL 002, PL 003, PL 004, PL 005, PL 006 (side elevation), PL 006 (site plan and location plan).

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

  2. Section 03

    [name]

    The main issues are: • whether the proposal constitutes inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • if the development does represent inappropriate development, the effect of the proposal on the openness of the Green Belt; and • if the development does amount to inappropriate development in the Green Belt, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal. _________________________________________________________________________________ __________________________________________________________________________________________

  3. Section 04

    Whether inappropriate development

    The appeal site comprises a two-storey, detached house with off-street parking on the driveway to the front. It is set in wider countryside of fields and woodland between the settlements of Rochford and Hockley.

    The Framework states that a local planning authority should regard the construction of new buildings as inappropriate in the Green Belt. This is subject to certain exceptions, which include at paragraph 154 (c) ‘the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.'

    The Framework does not define what constitutes a disproportionate addition. Policy DM17 of the Rochford District Council Development Management Plan December 2014 (DMP) states that applications for extensions to dwellings in the Green Belt will be considered favourably provided that the proposal would result in no more than a 25% increase in internal floorspace of the original dwelling. The Framework defines the date of an ‘original building’ as 1 July 1948, or as originally built if constructed after that date. Consequently, extensions that have occurred since this time are relevant to this appeal.

    The Council puts forward a figure of some 51.3% uplift for the cumulative internal floorspace increase of previous works to the original home when one adds the appeal scheme. This figure has been disputed by the appellant having regard to a two-storey extension that was added to the property following approval of a scheme in 1987, and the extra floorspace created by the new extension. I have sought further clarification from the parties in this respect; although a precise calculation has not be agreed the Council has indicated the extent of the original dwelling on the existing floor plans.

    It is clear that the ground floor of the property has doubled in size and the first floor increased by approximately a third. Even allowing for the fact that one could measure volume or use other comparisons, given the degree of change over and above the original home, I find it impossible to reach a view other than there would be a failure of the ‘disproportionate additions’ test.

    Judging the scheme in accordance with Policy DM17, I consider that the proposed extension, together with the previous additions to the dwelling, would amount to a disproportionate addition over and above the size of the original building. This would represent inappropriate development within the Green Belt and would not benefit from the exception in paragraph 154 (c) of the Framework. Consequently, there would be conflict with Policy DM17 of the DMP.

  4. Section 05

    Openness

    The Framework makes it clear that an essential characteristic of Green Belts is their openness. As a disproportionate extension of the building, the proposal would inevitably result in some loss of openness. Nevertheless, spatially the extension would be broadly confined to the existing footprint of the building, and the maximum height of the house would not change as a result of the scheme. Most of the scale of the addition would be positioned tight against the property, and thus would not significantly encroach beyond the developed core.

    Visually, the new two-storey gable would be almost identical to that which is _________________________________________________________________________________ ___________________________________________________________________________________________ already present on the front elevation. To my mind, the resulting uniformity would form a sense of balance and reduce the perception of bulk and massing, such that the erosion of openness would not be noteworthy. Overall, I find the scheme would have a very limited effect on the openness of the Green Belt.

  5. Section 06

    Other Matters

    I have had due regard to the Human Rights Act 1998 (HRA) and the Public Sector Equality Duty under the Equality Act 2010. Article 8 of the HRA requires that decisions ensure respect for private and family life and the home. In reaching my decision, I have kept these interests at the forefront of my mind. However, these are qualified rights and interference may be justified where in the public interest. The concept of proportionality is key.

    I understand that the dwelling is held in trust for a child with serious health issues who requires intensive care and supervision. I have considered the evidence around the need for the additional shower room, and a lift to provide immediate access to the existing adjoining bedroom. The appellant submits that the proposal is required to make [address] more accessible to the child, whilst also ensuring the accommodation is suitable for their needs.

    I accept that the proposal would enable the child to remain in the home and benefit from the essential care provided, and I attach substantial weight in favour of the appeal scheme to the matters raised.

  6. Section 07

    Conditions

    I have considered the imposition of conditions in light of advice in Planning Policy Guidance and the National Planning Policy Framework. In addition to the standard implementation condition, the approved plans are listed for certainty. A condition requiring external materials to match those on the existing dwelling would provide for a satisfactory appearance.

  7. Section 08

    Conclusion

    The proposal would be inappropriate development, which by definition is harmful to the Green Belt and should not be approved except in very special circumstances. There would be only a minimal impact upon openness. Very special circumstances will not exist unless the harm to the Green Belt and any other harm is clearly outweighed by other considerations.

    I consider that the other considerations do clearly outweigh the harm, and the very special circumstances necessary to justify the development do exist. I conclude that the proposal would accord with the development plan as a whole and there are no other considerations, including the Framework, that indicate that I should take a decision other than in accordance with this.

    Having regard to the above and all other matters, the appeal is successful.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 212No official casework-database value to compare
    Extracted decision date · page 1
    17 March 2025Matches the official casework database
    Extracted site visit dates
    18 December 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3347522
Application reference
24/00110/FUL
Lead case reference
Not recorded
Planning authority
Rochford District Council
Planning authority code
E07000075

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
4 July 2024
Valid date
4 July 2024
Start date
24 July 2024
Planning authority decision date
27 May 2024
Appeal decision date
17 March 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
66332
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21