Appeal 3347561
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘alterations to roof of dwelling.’
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The Council advises that the appeal site was most recently in use as a Class C4 house in multiple occupation and that planning permission would be required to change the use to a Class C3 dwellinghouse1. The description of development in the banner heading above is taken from the planning application form, as there is no evidence before me that the appellant agreed to that included on the Council’s decision notice. The description does not indicate a material change of use and this was not considered by the Council during the determination of the application. No evidence has been presented by the appellant to indicate that I should consider the proposal as being anything other than the alteration of the existing building. I have therefore determined the appeal on this basis.
[name] 2024 the Government published a revised National Planning Policy Framework (the Framework). Although some sections and paragraph numbers have changed, the revisions do not relate to anything that is fundamental to the main issues in this appeal. The parties would not therefore be prejudiced by reference to the revised Framework.
Section 04
[name]
The main issues in relation to this appeal are; • Whether the proposal would be inappropriate development in the Green Belt having regard to the Framework and any relevant development plan policies; • The effect of the proposal on the openness of the Green Belt; and • Whether any harm by reason of inappropriateness, and any other harm is clearly outweighed by other considerations, so as to amount to the very special circumstances necessary to justify the development. 1 The Town and Country Planning ([name]) Order 1987 (as amended).
Section 05
Inappropriate Development
Policy SP4 of the [site address] Local Plan (CBLP) 2021, advises that there is a general presumption against inappropriate development within the Green Belt. It specifies that development proposals within the Green Belt will be assessed in accordance with the guidance contained in the Framework and the Planning Practice Guide. It goes on to advise that the redevelopment of brownfield sites within the Green Belt will be acceptable as long as the redevelopment would not have a greater impact on the openness of the Green Belt or the purposes for including land within the Green Belt than the existing development.
Paragraph 154 of the Framework indicates that, other than in connection with a small number of exceptions, the construction of new buildings should be regarded as inappropriate within the Green Belt. The appellant considers that the proposal meets the exception for the limited infilling or the partial or complete redevelopment of previously developed land under paragraph 154(g). The Framework does not seek to define ‘redevelopment.’ However, taken in its ordinary meaning as explained in the [name], redevelopment is the process of replacing buildings in an area with new ones.
The description of development and the nature of the proposed works shown on the proposed plans indicate that the proposal amounts to the extension and alteration of the existing property. It would not result in the replacement of a building with a new one. For this reason, the proposal would not fall for consideration under paragraph 154(g) of the Framework, a view I note is shared by the Council 2. Neither would it fall under the section of Policy SP4 that relates to the redevelopment of brownfield land.
Instead, the Framework makes provision for the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building, under the exception set out at paragraph 154(c). The appellant agrees that the proposal could be considered as an alteration sufficient to meet this exception3. The Framework defines the term ‘original building’ as being a building as it existed on 1 July 1948 or, if constructed after this date, as it was built originally. The Framework does not however, provide a definition of ‘disproportionate additions.’ It is therefore a matter of planning judgement.
The [site address] [name] (CBDG) 2023, advises that as a guiding principle, to be considered as proportionate, the original building should not be added to by more than 60% of footprint, floorspace and volume. Both parties agree that the appeal property has been previously extended and this was clear to see during my visit.
The Council has calculated that the proposal when considered in combination with the existing extensions would lead to a 48.2% increase in footprint, 166.5% increase in floorspace and 88% increase in volume. The appellant has not sought to dispute these figures in his statement of case. It seems from the evidence before me that notwithstanding that there would be no increase to the footprint of 2 As set out in the Council’s letter to the Planning Inspectorate dated 4 February 2024. 3 Appellant’s email to the Planning Inspectorate dated 6 February 2025. the property, the proposal would fail to comply with the CBDG guidance in terms of floorspace and volume. The departure from the guidance in these respects would be significant.
In addition, I observed that the existing rear extensions have already added significant bulk to the property and whilst they result in a complicated appearance, the use of 3 projecting rear gables does break down the mass of the extensions, allowing the original rear roof slope to remain visible.
No section drawing has been provided. However, the proposed roof plan and elevation drawings indicate that the addition of a crown roof would in effect create a first-floor flat roof extension with a very steeply pitched rear wall. This would effectively infill the current gaps between the rear gable projections. The proposed development would therefore in combination with the existing extensions, add considerable bulk to the existing property, simultaneously obscuring the entire original rear roof slope.
I find that the proposed development would fail to comply with the guidance contained within the CBDG and would be disproportionate to the size and scale of the original building when combined with the previous extensions, visually and volumetrically.
Consequently, for the reasons given, the proposal would not meet either of the exception tests of paragraph 154(c) or (g) of the Framework. It would therefore be inappropriate development in the Green Belt.
Section 06
Openness
Paragraph 142 of the Framework indicates that openness is an essential characteristic of the Green Belt, with a key objective being to keep land permanently open. Openness has both a visual and spatial dimension.
The proposed development whilst not extending the property further into the Green Belt at the rear, would nonetheless add bulk and mass to the property, eroding 3- dimensional space and obscuring the original rear elevation. Although located at the rear of the building the increased mass and scale would be visible from the nearby public footpath which crosses the adjacent field, albeit it at a medium distance. This would particularly be the case in winter when the trees on the intervening boundary would not be in leaf. When combined with the bulk and scale of the previous extensions, the proposal would impact on the spatial and visual dimensions of the appeal site, resulting in a moderate loss of openness.
Even if I were to find that the proposal would not affect the openness of the Green Belt, the absence of harm would be a neutral matter that weighs neither for, nor against, the proposal. It would not amount to very special circumstances.
Conflict is thus found with paragraph 142 of the Framework as set out above.
Section 07
[name]
Reference is made to the proposal resulting in a visual improvement to the existing property as well as an improved internal layout. I acknowledge that it would result in a less complicated appearance but nonetheless a flat crown roof would not reflect the traditional dual-pitched roof of the building or its later additions. Moreover, there is no suggestion in the evidence presented that the proposal is the only way of improving the appearance, nor that the layout of the existing property prevents it from being occupied and utilised in practical terms.
The appellant refers to the use of solar panels in their statement of case suggesting that they could be conditioned. The details of any such provision are not included on the proposed plans such that I am not clear of the appellants intentions in this regard. Even if solar panels are proposed as part of the development, there is no evidence that the use of such technology is inherently reliant on the scheme before me. Neither is there any substantive evidence that it would not be possible to insulate the existing roof configuration to today’s building regulation standards, without compromising on floorspace.
Taken together, these other considerations attract no more than limited weight.
Section 08
Other Matters
Reference is made to paragraph 73 of the Framework (previously paragraph 70) which advises that small to medium sites can make an important contribution to meeting the housing requirement of an area. However, there is no evidence before me that the proposal includes the change of use of the existing building, nor equates to the provision of a new house that would contribute to local housing land supply. This does not affect my findings.
Section 09
Green Belt Balance and Conclusion
The proposal would amount to inappropriate development in the Green Belt resulting in a moderate loss of openness. Referring to footnote 7 of paragraph 11 of the Framework, this is one such policy that, when applied, provides a clear reason for refusing the development proposed. The appeal scheme would not therefore benefit from the presumption in favour of sustainable development.
The Framework establishes that substantial weight should be given to any harm to the Green Belt. Very special circumstances will not exist unless the harm to the Green Belt and any other harm are outweighed by other considerations.
Whilst some factors have been highlighted in favour of the proposal, the considerations presented by the appellant relating to the visual improvement and energy efficiency of the existing building do not provide anything other than limited weight. Consequently, these considerations do not outweigh the substantial weight that I am directed to give to Green Belt harm. The very special circumstances necessary to justify the proposal do not exist. Accordingly, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2191No official casework-database value to compare
- Extracted decision date · page 1
- 13 February 2025Matches the official casework database
- Extracted site visit dates
- 28 January 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3347561
- Application reference
- CB/24/01177/FULL
- Lead case reference
- Not recorded
- Planning authority
- Central Bedfordshire
- Planning authority code
- E06000056
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 July 2024
- Valid date
- 2 July 2024
- Start date
- 6 August 2024
- Planning authority decision date
- 2 July 2024
- Appeal decision date
- 13 February 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 64519
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21