Appeal 3347969
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘first floor side/rear extension (previously approved #22/03482/FULL6) and for a [name] conversion’.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area.
Section 05
Reasons for the Recommendation
The appeal property is a semi-detached dwelling in an area made up of other semi-detached properties. Development to the front and side of these properties is common and this has resulted in variation on the street in the scale of dwellings. Whilst there are also different roof styles present, these overwhelmingly have either a hip or gable end. In some cases, scale and roof form differ between semi-detached pairings, contributing to some level of asymmetry.
Historic development to the front and side of the appeal property has produced differences in appearance with its semi-detached partner. The two dwellings are asymmetrical in their scale and roof form, with the stepped down hip of the appeal property contrasting the full hip of its partner. The appeal property and its semi-detached partner therefore fit into the varied appearance of the area.
Although there is difference in their roof forms, the appeal property and its partner nevertheless share the pitch of their hipped roofs. This is a consistent characteristic throughout the area for semi-detached pairings that both have a hipped roof, including the properties put forward by the appellant. This means that despite some asymmetry, the hipped roof designs of paired properties Appeal Planning Officer APP/G5180/D/24/3347969 remain sympathetic to one another and it brings a sense of coherence to pairings in the street scene. Therefore, although there is variety in appearance to be found in the area, there is nevertheless a sense of place that the matched pitch of the existing hipped roofs contributes towards.
The proposed development would extend the roof of the appeal dwelling by raising the existing stepped ridge to the height of the main ridge and by increasing the pitch of the hip to provide room for a rear dormer. The resulting scale of development would not be significantly more than other examples of roof extensions already found in the area, so would not represent an overly dominant addition to the host dwelling.
However, by increasing the pitch of the hip, the proposed roof design would no longer be sympathetic to the neighbouring dwelling or the area. It would create an unbalanced roof form for the semi-detached pair, which would diminish the existing sense of coherence for the pairing. Furthermore, the roof pitch proposed would be distinctly and noticeably different to other examples of enlarged roofs in the area, including those referred to by the appellant. Consequently, those examples carry limited weight in my decision making and do not justify this proposal.
Although the materials used would be similar in appearance to those of the existing dwelling, the roof form of the proposal would not be compatible with development in the surrounding area and would not positively contribute to the existing street scene. [name] appreciate that this is a revised scheme aiming to improve on a previously rejected application, my assessment and recommendation are based only on the proposal in front of me.
Accordingly, for the reasons above, the proposed development would cause significant harm to the character and appearance of the area and would conflict with Policies 6 and 37 of the Bromley Local Plan (2019) which, respectively, require extensions to be compatible with development in the surrounding area and expect a high standard of design.
Section 06
Other Matters
The appellant has raised that the extension volume falls within fifty cubic metres and is not in a conservation area. In some circumstances, roof extensions are permitted development under planning legislation. However, in this case, as extensions have been made to the roof in the past, there is no substantiative evidence before me that similar extensions could be undertaken without planning permission, such that there would be a viable fallback position. For this reason, the weight I can give to this matter in my decision making is limited and it does not outweigh the harm I have identified above.
Section 07
Conclusion and Recommendation
The proposal conflicts with the development plan read as a whole, and there are no material considerations that justify granting permission. Therefore, for the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and agree with the reasoning and recommendation. On that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 133No official casework-database value to compare
- Extracted decision date · page 1
- 28 November 2024Matches the official casework database
- Extracted site visit dates
- 29 October 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3347969
- Application reference
- DC/24/00770/FULL6
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 July 2024
- Valid date
- 12 July 2024
- Start date
- 22 August 2024
- Planning authority decision date
- 26 April 2024
- Appeal decision date
- 28 November 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 60798
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21