Appeal 3347992
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first floor front extension, roof alteration, loft conversion and internal alterations.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host property, the semi-detached pair, and the area.
Section 04
Character and appearance
The streetscene in this part of [address] is dominated by semi-detached pairs. They typically have a dominant two storey central section with double height bay windows, and recessive long sloping roofs either side with first floor accommodation contained within the roof, leading to an eaves at ground floor level. The host and [address] (‘No 62’) comprise one such pair, which displays these locally distinctive ‘metroland’ characteristics. It sits in a fairly prominent position close to the junction with [address].
The fenestration of the proposed front extension would reflect existing features in this pair and it would be faced with matching materials. However, the introduction of a second two storey projection, with the consequential loss of the distinctive sloping roof and the increased ridge height to one side, would significantly disrupt the composition and relative symmetry of the building. The resultant property would have a domineering bulk, which would be exacerbated by the extension’s projection forward of the existing bay windows, and it would be markedly at odds with its neighbours either side.
To the rear, the proposed dormer would cover much of the extended roof, with only narrow gaps to the roof edges. As a result, this half of the building would have a broadly three storey form, thus further disrupting the cohesion and harmony of this pair. None of the photographs of dormers provided by the appellant are in the immediate locality, and although some nearby properties, including No 62, have rear dormers, none that I observed are as bulky compared to the one proposed here. The dormer’s discordant impact would be clearly apparent when approaching the site from [address].
The appellant has also drawn my attention to properties which have had two storey front or side extensions. Some are a distance away, but they include 50, 55 and [address] which are very close to the appeal site, and [address] which is further away in a different streetscene, but which also has a rear dormer. Although [address] is on the junction with [address], it is some distance from here, and I have no details of what originally stood on that site.
Whilst these examples serve to illustrate that the area is not totally cohesive, they are not typical of the locality. Moreover, I have very few details to know whether they were all granted planning permission, or what policies and guidance were in place at the time, and they do not serve to justify the harm that would be caused to this building and this streetscene, by this proposal’s poor design. For these reasons, the scheme would significantly harm the character and appearance of the host, this semi-detached pair, and the area.
It would thereby conflict with London Plan 2021 Policy D3 Parts D1) and D11), and Harrow Development Management Policies 2013 Policy DM 1. Amongst other things, these require a high standard of design which respects the host building, and responds positively to local character and distinctiveness, and to the context provided by neighbouring buildings, having regard to matters such as building types, form, proportions, massing, bulk, scale, height and appearance.
It would also conflict with the National Planning Policy Framework requirement for high quality design which is sympathetic to the surrounding built environment.
Finally, it would fail to accord with the advice in the [name] Planning Document 2010 that extensions should harmonise with the scale and architectural style of the original building and the character of the area, and that they should not dominate the original building or the streetscape; and that roof alterations should complement the original street character, and not dominate buildings or impair their proportions or character.
Having regard to all other matters raised, the appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 450No official casework-database value to compare
- Extracted decision date · page 1
- 22 October 2024Matches the official casework database
- Extracted site visit dates
- 7 October 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3347992
- Application reference
- PL/1003/24
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 July 2024
- Valid date
- 12 July 2024
- Start date
- 23 August 2024
- Planning authority decision date
- 4 June 2024
- Appeal decision date
- 22 October 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 58805
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21