Skip to main content
Official casework recordAllowedCurrent release

Appeal 3348313

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a loft conversion with L shaped dormer and rear 2 storey infill extension at basement and ground floor level.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for a loft conversion with L shaped dormer and rear 2 storey infill extension at basement and ground floor level at [site address] in accordance with the terms of the application, Ref 23/04695/H, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: (3)001; (3)002; (3)003; (3)004A; (3)005A; (3)006B & (3)007C.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those of the existing dwelling.

  2. Section 03

    Main Issue

    This is whether the proposed development would preserve or enhance the character or appearance of the Bedminster Conservation Area (CA).

  3. Section 04

    Reasons

    The application property is an end of terrace dwelling at the northern limit of the CA. It is comprised within Character Area 7 of the CA as identified in the Council’s CA Appraisal. The property is shown on a map within the Appraisal as a ‘character’ building, along with many other buildings or terraces in the character area. There are but a few listed buildings in the character area, but other buildings and terraces are identified as ‘unlisted buildings of merit’ or ‘grouped buildings of merit’, that is, of a seemingly higher local designation than the appeal property.

    The officer report says that ‘the dwelling forms part of a terrace of four which are generally uniform and architecturally balanced from the principle (sic) elevations.’ I noted that the original ground floor bay on the appeal property had been lost, and replaced with a picture window, and the same has occurred on the adjoining, next door property.

    Moreover, a new dwelling has been added, virtually as an extension, to the former end of terrace property, No 28, a short distance to the west. The new dwelling’s contrasting design and non-matching materials are such that the previous unity and symmetry of the small terrace has been materially affected. Indeed, the new dwelling is characterised as a negative building in the Appraisal.

    The Council considers the proposal to reinstate the bay at the front to be appropriate and acceptable. Regarding the proposed rear infill extension, the officer report says that it: ‘..is considered to respect the general architectural character of both the application dwelling and wider area as well as maintain subservience to the host dwelling. Given its siting to the rear of the property, it would not be visible from the public realm and as such would not detrimentally impact the streetscape or wider CA.’

    I share the Council’s view on both aspect of the proposals, for the same reasons.

    Thus, of the 3 elements of change proposed, it is the alterations to the roof which concerns the Council. Most of the proposed structure as it affects the roof’s profile would be sited to the rear of the existing roof light or lantern, which despite its protrusive form is hardly apparent from the street outside.

    The designer’s attempts to marry the proposed structure with the existing roof profile, especially to the side, have succeeded and would ensure that the alterations would barely be noticeable from the street outside given that the most prominent front part of the sloping side roof would be unaffected. The roof form would be altered at the rear and could be seen by neighbours, none of whom have objected. However, the rear alterations would not be apparent in the public realm and, in applying a test similar to that adopted by the Council for the lower rear extension, would not detrimentally impact the streetscape or wider CA.

    Whilst sharing the Council’s assessment of two aspects of the appellant’s proposals, I disagree with its assessment in respect of the third the third. At worse, the alterations to the roof would have a neutral effect on the CA as a whole, and its character and appearance would thus be preserved.

    In conclusion, I find the development to be acceptable and compliant with those aspects of [name] BCS21 & BCS22, Local Plan Policies DM26, DM27, DM30 & DM31 directed to achieving good quality urban design contributing positively to local character and distinctiveness and ensuring that the City’s heritage assets are appropriately conserved.

  4. Section 05

    Conditions

    The Council’s suggested condition that the development shall be carried out in accordance with the approved plans is imposed in the interests of certainty, as will its suggested condition relating to materials, in the interests of visual amenity.

  5. Section 06

    Other matters

    The Council’s comments on the appellant’s initial heritage statement have been noted. However, the significance of the CA, the heritage asset, is well rehearsed in the Appraisal and I have been considerably assisted in this regard by its content.

    All other matters raised have been taken into account, including the various references to the National Planning Policy Framework and the Council’s Supplementary Planning Document directed to designing house extensions and alterations, but no other matter is of such significance as to outweigh those considerations that led to my conclusions.

    Accordingly, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2949No official casework-database value to compare
    Extracted decision date · page 1
    24 January 2025Matches the official casework database
    Extracted site visit dates
    9 January 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3348313
Application reference
23/04695/H
Lead case reference
Not recorded
Planning authority
Bristol City Council
Planning authority code
E06000023

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
17 July 2024
Valid date
19 July 2024
Start date
2 September 2024
Planning authority decision date
16 May 2024
Appeal decision date
24 January 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
63444
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21