Appeal 3348572
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the application form as “prior approval for a ground floor rear extension measuring 5m deep by 2.9m high and 2.6m at the eaves”.
Section 02
Decision
The appeal is allowed and prior approval is not required under the provisions of Article 3(1) and Schedule 2, Part 1, Class A, paragraph A.4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for a ground floor rear extension measuring 5m deep by 2.9m high and 2.6m at the eaves at [site address] , Merton, [postcode] , in accordance with the application Ref 24/P1611, and the details submitted with it, pursuant to Article 3(1) and Schedule 2, Part 1, Class A.
Section 03
Preliminary Matters
Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions. The provisions of Class A and limitation A.1(g) are subject to paragraph A.4, which requires a prior approval procedure to be undertaken, including consultation with adjoining property occupiers. Development must not begin until the conditions of paragraph A.4(10) have been met.
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposal does not comply, or that the developer has provided insufficient information to enable the authority to establish whether the proposal complies with the conditions, limitations or restrictions applicable to such permitted development.
[name].4(2) (a) sets out that the developer must provide the local planning authority with a written description of the proposal including how far the enlarged part extends from the rear wall of the original dwellinghouse, the height of the eaves and the maximum height of the enlarged part.
Section 04
Main Issue
The Council refused the application based on the absence of accurate dimensions of the height of the proposed extension. Therefore, the main issue is whether the proposal would comply with the conditions, limitations and restrictions applicable to development permitted under Schedule 2, Part 1, Class A of the GPDO, having particular regard to the height of the extension.
Section 05
Reasons
The appeal site is a two storey terraced property which is located on the western side of [address]. The proposal relates to a single storey extension with a flat roof, which would project 5m from the rear of the building and span the full width of the rear elevation. The plans show that the extension would have a flat roof, the maximum height of which would be 2.9 metres.
Development is not permitted under paragraph A.1(g) (ii) to Part 1 of the GPDO if the enlarged part of the dwellinghouse exceeds 4 metres in height, or under paragraph A.1(i) if it would be within 2 metres of the boundary of the curtilage of the dwellinghouse, and the eaves height of the enlarged part would exceed 3 metres.
The Technical Guidance: Permitted Development for Householders (2019) (the Guidance) sets out how the eaves height of a flat roof extension should be measured from the ground level at the base of the outside wall to the point where that wall would meet the upper surface of the flat roof, and the overhang and the parapet wall should be ignored for this measurement. Taking this into account, the drawings show that the eaves height of the proposal would be 2.9 metres.
The application form states that the eaves height would be 2.6 metres. Notwithstanding the discrepancy between the application form and the plans, it is clear that the eaves height and overall height of the proposal would fall within the parameters of paragraph A.1(g) and (i). Therefore, the information provided by the appellant satisfies the requirements applicable to development permitted by Class A, which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g). There is no dispute between the parties that the proposal would meet the other criteria relating to rear extensions, and I agree that these criteria would be met.
For these reasons, I conclude that the appellant has provided sufficient information to demonstrate that the proposed development would comply with paragraph A.1 of Schedule 2, Part 1, Class A of the GPDO.
Section 06
Conclusion
Planning permission granted under Article 3(1) and Schedule 2, Part 1, Class A is subject to the conditions in A.3 and A.4. This includes the requirement for the exterior materials to be similar to those used in the exterior of the existing dwellinghouse and that the development is carried out in accordance with the details and plans submitted as part of the application.
For the reasons given, I conclude that the appeal should be allowed and that prior approval is not required.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 144No official casework-database value to compare
- Extracted decision date · page 1
- 10 March 2025Matches the official casework database
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3348572
- Application reference
- 24/P1611
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Merton
- Planning authority code
- E09000024
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 22 July 2024
- Valid date
- 26 July 2024
- Start date
- 10 September 2024
- Planning authority decision date
- 9 July 2024
- Appeal decision date
- 10 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 65924
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21