Appeal 3349345
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
an outbuilding – garden studio.
Section 02
Decision
The appeal is allowed and planning permission is granted for an outbuilding – garden studio at [site address] in accordance with the terms of the application, Ref 24/00980/HOU, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans and document: DPL.01, DPL.02a, DPL.03a, DPL.04a, DPL.05, Flood Risk Assessment, April 2024.
The materials to be used in the external surfaces of the development hereby permitted shall be as specified on the approved plans.
Section 04
Application for costs
An application for costs was made by [name] against the Council of the London Borough of Enfield and this is the subject of a separate Decision.
Section 05
Main Issue
There is one main issue which is the effect of the outbuilding on flood risk in the surrounding area and the effect of the risk of flooding on the safety of future occupiers of the building.
Section 06
Reasons
The appeal dwelling is a modest, two storey dwelling of traditional design. It is located in a street of mostly similar dwellings arranged as short terraces or in semi-detached pairs. It lies within the Enfield Town Conservation Area (CA). The garden at the appeal dwelling is narrow but long. It and its neighbours are separated by fences. To the rear of the site are the gardens of properties in [address].
The proposed outbuilding which would be located at the end of the garden is classed as minor development under the National Planning Policy Framework (NPPF) and its accompanying guidance. As such it is not subject to the sequential or exception tests but should still meet the requirements of a site-specific Flood Risk Assessment (FRA). The submitted FRA identifies that the site is located in [name] 1, areas with the lowest risk of flooding, according to the Environment Agency Flood Zones Maps. The current and proposed development site use is classified as a ‘[name] land use according to the NPPF. The site is located in an area with medium risk from surface water flooding and low risk from all other sources including fluvial/tidal risk, groundwater, sewer and reservoir.
The proposed outbuilding which would replace a smaller shed has been designed to be raised some 0.2m above ground levels on a series of pins, as set out in the FRA and shown on the submitted plans, in order to protect it from flooding (the finished floor level is proposed to be 30.12mAOD which is at least 150mm above the estimated surface water flood depth for a 1 in 100 year (+17% climate change) event. The area under the base that is currently unpaved would be paved using a permeable material. Both these measures would assist in maintaining the free flow of water and retention of flood capacity beneath the building. As set out in Section 4.4 of the submitted FRA, it is also proposed to excavate within the rear garden at the site to replace the circa 3.0m3 of flood capacity lost to the development.
Nevertheless, the Council’s Sustainable Urban Drainage Systems (SuDs) officer considers that the FRA fails to demonstrate that the development would be safe from flooding and would not increase flood risk elsewhere. In particular, it is identified that a flood management/evacuation plan should be provided demonstrating that the evacuation route is in the “[name]”.
The appellant argues that the submitted FRA demonstrates that the proposal has been designed such that it would not increase the risk of flooding to others. Moreover, an evacuation strategy, based on the severe weather warning service, including evacuation advice from the Environment Agency (EA) and local agencies, informed by their early warning systems, is set out in the FRA. In addition, the building is a residential outbuilding, meaning that occupiers could evacuate to the safety of the main dwelling well before any flood event. Taken together it is suggested these measures would reduce the likelihood of danger to life should severe flooding occur and indicate that flood risk at the site could be suitably managed.
The appellant also points out that a very similar building but without the proposed flood risk measures, such as the elevated floor level, stilted foundation and permeable paving, could be built at the site under permitted development rights set out under Class E of part 1 of the Town and Country Planning (General Permitted Development) Order 1995, as amended. I noticed that there is a similar large outbuilding to the one proposed in the next door garden which appeared to be of recent construction, and that this did not appear to have a non-standard stilted foundation. In addition, other garden outbuildings could be seen in the vicinity. The Council has not suggested any reason why PD rights would not apply at the appeal site. This therefore amounts to a fallback position which I consider to be very likely to be carried out if planning permission is refused.
I have given this case very careful consideration because flood risk is an important issue and I take the view that national guidance contained in the NPPF together with local policy should not be set aside other than in those circumstances where other material considerations clearly outweigh the risk. In this case a very similar building but without the same flood risk protections proposed could be built at the site and probably would be if planning permission for the appeal building is refused. It is therefore the case that some flood protection would be better than none. Moreover, flood risk in the area is limited to a moderate risk of surface water flooding.
On balance, I therefore conclude on the main issue that, notwithstanding the flood risk to the building and future occupiers and the limited risk of increased flooding in the surrounding area, to the extent that the proposed development conflicts with the tests set out in the NPPF, the further guidance set out in the Planning Practice Guidance and the requirements of Policy SI 13 of the London Plan, 2021, Policies CP21 and CP28 of the [name], 2010, Policies DMD59, DMD60 and DMD61 of the Enfield Development Management Document, 2014, and the [name] 1 Strategic Flood Risk Assessment, 2021, these, are outweighed by the particular circumstances of the case and the appeal should be allowed.
Turning to conditions the Council suggests two conditions in addition to the statutory commencement condition. I agree that the development should be carried out in accordance with the approved plans and the submitted Flood Risk Assessment, April 2024, to provide certainty and to ensure that the proposed measures to manage flood risk are incorporated into the development. In addition, the materials to be used in the construction of the external surfaces of the development hereby permitted should be as specified on the approved plans. This is necessary to protect the character and appearance of the appeal site and the surrounding area, including the Enfield Town CA.
For the reasons set out above and having regard to all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2972No official casework-database value to compare
- Extracted decision date · page 1
- 26 November 2024Matches the official casework database
- Extracted site visit dates
- 11 November 2024 (page 1)
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 2972No official casework-database value to compare
- Extracted decision date · page 1
- 26 November 2024Matches the official casework database
- Extracted site visit dates
- 11 November 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3349345
- Application reference
- 24/00980/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 2 August 2024
- Valid date
- 2 August 2024
- Start date
- 27 August 2024
- Planning authority decision date
- 11 June 2024
- Appeal decision date
- 26 November 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 60642
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21