Skip to main content
Official casework recordDismissedCurrent release

Appeal 3349377

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

1.8m high black iron sliding gate and railings to front boundary.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are: • the effect of the proposed development on the character and appearance of the Chislehurst Conservation Area; and • the effect of the proposed development on highway safety.

  3. Section 04

    Character and appearance

    The appeal site lies within the Chislehurst Conservation Area (CA). Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 states that special attention shall be paid to the desirability of preserving or enhancing the character or appearance of that area.

    The CA covers an extensive area, with the appeal site falling within sub-unit 2 – Around and close to the Commons. Its significance in part derives from its wooded, village-like character whilst the generosity of trees, hedges and gardens associated with dwellings strongly reinforces the sense that a wooded environment with scattered housing lies beyond the commons. Residential development in the CA is predominantly characterised by its spacious, well landscaped setting.

    The appeal property is a detached, two-storey dwelling located on a prominent corner plot at the junction of [address] and [address]. It sits within a row of mainly large detached houses in generous plots, with woodland associated with the commons opposite. The wide, open frontage of the site with trees and other vegetation on or adjacent to its side boundaries ensures that the site makes a positive contribution to the character and appearance of the CA.

    The appeal proposal is for a 1.8m high black iron sliding gate and railings to the front of the dwelling. The appellant has referred to examples of different front boundary treatments in [address], including walls, black metal railings and gates, some of which are recessed. These include the white painted piers and low walls with metal railings on top at [address] which, in my opinion, has not positively contributed to the CA. However, from my observations on site, the front boundary treatment of the closest row of houses to the appeal site mainly comprise of picket fencing and hedges which are low in height. This results in this section of [address] having a particularly spacious, informal character and appearance which contributes positively to the significance of the CA.

    [name] acknowledge the variety of front boundary treatments in the wider CA, including the examples highlighted by the appellant further to the west in [address], along [address] and in areas further afield, the appeal proposal would not be viewed in context with these examples. Instead, I find that the proposal would, due to its overall composition, size and height, black colour and metal material, be a highly urbanising, unduly formal form of enclosure which would be significantly at odds with the more informal, simple and lower scale boundary treatments along the adjacent section of [address].

    Furthermore, the proposed railings would be highly conspicuous in the street scene having regard to the prominent corner location of the site at the crossroads junction with [address] and would significantly detract from the spaciousness of the corner derived from the open frontage.

    Accordingly, the proposal would have a negative effect on the significance of a designated heritage asset. However, given the relatively small scale of the proposal, this would be less than substantial harm to the significance of the CA as a whole. Paragraph 208 of the National Planning Policy Framework (the Framework) indicates that in such circumstances the harm should be weighed against the public benefits of the scheme. [name] acknowledge the personal benefits to the appellant in terms of improved security, this matter would not amount to a public benefit and consequently, would not outweigh the great weight that should be given to the asset’s conservation.

    I therefore conclude that the proposal would have a harmful effect on the character and appearance of the CA. In addition to the conflict with national policy and legislation identified above, the proposal would also be contrary to Policies 37 and 41 of Bromley Local Plan 2019 (BLP) and Policies D4 and HC1 of the London Plan 2019 (LP). Together these policies seek to protect the district’s heritage assets and require development proposals to enhance local context and to ensure that the character and local distinctiveness of a street or area is respected, maintained or enhanced.

  4. Section 05

    [name]

    At the time of my site visit I observed that [address] is a busy road with a steady flow of traffic in each direction, together with vehicles turning into and out of [address]. The road is subject to a 30mph speed limit in the vicinity of the appeal site.

    The railings and sliding gate would be set back from the 53.6m x 2.[address] and I acknowledge that the Council’s highway engineers are satisfied that the gates and boundary enclosure would not impede visibility at the junction. I have no substantive evidence before me to dispute these findings.

    There would not be sufficient space to the front of the gates to allow a vehicle to clear the highway whilst the gates are opened or closed. Accordingly, waiting vehicles would obstruct the pavement and overhang the carriageway resulting in danger and inconvenience to pedestrians and users of [address].

    The appellant has confirmed that the gates would have a high mechanical efficiency allowing a quick opening time and a long range remote control via mobile phone. I note that consideration of the details of the mechanical operation of the gates has led the Council’s highway engineers to withdraw their objection to the proposal.

    However, I concur with the Council’s planning officer’s assessment and that of the previous appeal Inspector1 that an electronic mechanism which guarantees gates would always be open to allow a vehicle to pull freely into the property on arrival would be difficult for the Council to monitor and enforce. Whilst the electronic mechanism would be likely to be effectively used by the occupiers of the appeal property, I can foresee that the effective operation of the gates would be particularly problematic in respect of deliveries and unexpected visitors to the property. I therefore conclude that gates in this position would, on occasions, be likely to result in vehicles waiting on the highway and this would cause danger and inconvenience for pedestrians and other road users.

    Thus, I find that the proposal development would be likely to have an adverse effect on highway safety. Accordingly, the proposal would conflict with Policy T4 of the London Plan 2021 and Policy 32 of the BLP insofar as these policies seek to ensure that road safety is not significantly adversely affected by development proposals.

  5. Section 06

    Conclusion

    I have concluded that the proposal would not preserve the character and appearance of the CA. In addition, I have found that the proposed development would have a harmful impact on highway safety. The proposal therefore conflicts with the development plan taken as a whole.

    For the above reasons, having regard to the development plan and all other relevant material considerations, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 334No official casework-database value to compare
    Extracted decision date · page 1
    8 November 2024Matches the official casework database
    Extracted site visit dates
    29 October 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3349377
Application reference
DC/24/01654/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
2 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
25 July 2024
Valid date
20 August 2024
Start date
23 September 2024
Planning authority decision date
26 June 2024
Appeal decision date
8 November 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
59737
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21