Appeal 3349592
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as replacement boundary wall, fence and gate (retrospective).
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matter
Since the appeal application was refused the National Planning Policy Framework 2023 has been replaced. Within the current National Planning Policy Framework December 2024 (the Framework) paragraphs 9, 10, 47, 131 & 135 of the Framework 2023 remain unchanged and so have not affected the consideration of this appeal. The changes to paragraphs 11d), 86 & 96 do not affect my consideration of the appeal proposal and paragraphs 38 & 47 of the 2023 Framework have been renumbered 39 & 48 respectively in the 2024 version. I confirm that in this decision I refer to the 2024 Framework.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the street scene and the wider locality.
Section 05
Reasons
The appeal site is located in the countryside, within a row of individually designed dwellings on the outskirts of Aldington and which front onto [site address] . The dwellings have varied building lines and gaps between them and they occupy varied sized plots. The front boundaries to these dwellings include a combination of hedges; fences and low Ragstone walls of varied heights. Typically, the boundary walls, fences and hedges are set back from the carriageway behind grass verges and there are views of soft planting within the domestic gardens.
The opposite side of the road is less developed and includes pasture land and sporadic properties that are set back from and screened from the road by mature hedges and trees. The surrounding undulating countryside is characterised by clusters of woodland and a diverse range of pasture and arable land that is primarily enclosed by hedges and trees.
Collectively these features contribute to the informal rural character of the street scene. They also contribute to the gentle transition between the countryside and the main built-up area of Aldington.
The appeal property comprises a detached family house which occupies a generous sized plot with a wide frontage. The proposed boundary wall, fence and gates have already been constructed/erected. However, the appellant has submitted a photograph which shows that previously the front boundary to the appeal property comprised a low Ragstone wall with a vertical boarded fence just behind it. The Ragstone wall projected up to the back edge of the pavement and there was a small area of grass above the wall and to the front of the fence.
The front boundary of the dwelling immediately to the northeast of the appeal site comprises a vertical close boarded fence with a mature evergreen hedge immediately behind it. The fence is set back from the pavement behind a raised grass verge. The Front boundary of the property to the southwest comprises a low post and rail fence which is sited immediately behind the pavement. This fence facilitates views of soft planting and a lawn within the front garden. Closer to the village and on the opposite side of the road is a red brick building with a brick wall along its front boundary, with low metal railings above it. This building sits close to the road and the wall encloses a pedestrian access ramp.
Collectively and amongst other things policies SP1, SP6 and ENV3a of the Ashford Borough Local Plan 2030 (LP), require proposals to be of a high quality design which is sustainable, safe and promotes a positive sense of place. It should respect and enhance local character and contribute positively to the public realm, landscape, townscape and local distinctiveness. LP Policy HOU15 seeks to ensure that dwellings benefit from the provision of private usable external open space.
Together and amongst other things paragraphs 8 b) & c), 39, 96, 131 and 135 of the Framework, promote a positive approach to decision making and sustainable forms of development, of which good design is a key aspect. They seek to protect and enhance the built and natural environment and provide safe environments where the quality of life is not undermined by crime and the fear of crime. Proposals should be sympathetic of local character and history, including the surrounding built environment and landscape setting, whilst not preventing appropriate innovation or change.
Together the proposed brick wall, brick piers and fence project up to the back edge of the pavement and as confirmed by the appellant the top of the fence is some 1.94 metres above ground level. The proposed gate comprises a wide sliding vertical boarded solid timber gate which is set behind two tall brick piers. These piers are taller than and are repeated at regular intervals between the fence panels.
The proposed timber fencing is reflective of the vertical timber boarding found elsewhere along this stretch of [site address] . Whilst it is comparable in height to the fence at the front of [name], it is more prominent due to its colour and siting immediately alongside the pavement. As stated by the appellant the fencing could be stained, which would soften its appearance in the street scene. However, due to their combined use of red brick, design, uniformity, height and number, the proposed brick piers are highly prominent and imposing within the street scene. They appear harsh and totally out of keeping with their informal edge of village setting and the prevailing use of Ragstone, which is visually soft.
Due to its modest height, on its own the proposed low brick wall would cause minimal harm to the street scene. It none-the-less exacerbates the harsh and uncharacteristic appearance of the brick piers and the overall prominence of the proposed boundary treatment. The proposed gate is less prominent due to its siting to the rear of the wall and piers. However, due to its height, design and light colour it adds to the harm caused by the proposed boundary treatment.
Reference has been made to the original boundary treatment and the availability of permitted development rights. I note that the original boundary fence was lower; set back slightly from the pavement behind a Ragstone wall; and did not include brick piers. As such it was visually softer and consistent with other front boundary walls and fences along [site address] .
The original wall and fence could have been altered under Class A.1, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015. However, this does not extend to a degree of change that amounts to a new structure. In this instance the proposed new boundary treatment is very different to the original in terms of height; the position of the fence and gate; materials; and inclusion of tall piers. Thus, even taking in to account what changes could reasonably have been made to the original fence and wall, and the availability of permitted development rights relating to the construction of a new wall or fence up to one metre in height, it does not outweigh the harm that has been caused by the proposal.
I understand and appreciate the appellants objective to make the property private, secure and safe. However, I find that the appeal scheme is visually insensitive and unacceptably harms the character and appearance of the street scene and the wider locality. This harm materially outweighs the benefits for the appellant and their family that would result from this particular boundary treatment. Further it is not something that could be satisfactorily dealt with by the imposition of conditions.
Finally, I note that the appellant has referred to paragraph 86 d) of the Framework. However, as that paragraph relates to the economy it is not directly applicable to the proposal.
I conclude on the main issue that the proposal would unacceptably harm the character of the street scene and the wider area. It would conflict with [name] SP1, SP6 & ENV3a and paragraphs 131 & 135 of the Framework. [planning inspector] ISNPECTOR
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1220No official casework-database value to compare
- Extracted decision date · page 1
- 18 December 2024Matches the official casework database
- Extracted site visit dates
- 9 December 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3349592
- Application reference
- PA/2024/0758
- Lead case reference
- Not recorded
- Planning authority
- Ashford Borough Council
- Planning authority code
- E07000105
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 August 2024
- Valid date
- 6 August 2024
- Start date
- 6 September 2024
- Planning authority decision date
- 20 May 2024
- Appeal decision date
- 18 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61934
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21