Appeal 3350973

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the formation of an extension to rear with other external alterations.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the formation of an extension to rear with other external alterations at [site address] in accordance with the terms of the application, [name]/2023/0687, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the following approved plans: WCSBWE230725; DCSFDE230725; WCSFDTFE230725; DCSKDE230725; WCSKWE230725; WCSLFFWE230725; WCSLFFNOWE230725; WCSRDWE230725; WCSRSBWGFFE230725; DFR230801; EP230727; FPPFF230803; FPPSF230628; P-2023-0687-3; WDEE230703; WDEER230703; WDEPF230727; WDEPR230727; BP230910; P-2023-0687-6; DS217; and P-2023-0687-5.

  2. Section 03

    Costs

    An application for costs has been made by the Appellant against the Council. This application is the subject of a separate decision.

  3. Section 04

    Preliminary Matters

    The appeal scheme, when more fully described than above, in summary includes: replacement of the front elevation windows with white uPVC wood grain effect frames; replacement of front railings; change to the front door colour and design; painting of the front aspect of the house; adding an extension to the rear; changing the rear dormer window to two windows; and replacement of one rear window with a uPVC wood grain effect window.

    The Council’s Refusal of Planning Permission only refers to the proposed uPVC fenestration; this is what I consider below.

  4. Section 05

    [name]

    The main issues are the effect of the proposal on a) the character and appearance of the host property and the locality and b) energy consumption and carbon emissions.

  5. Section 06

    Character and appearance

    The appeal property is double-storey terraced home in a long row. It dates from the mid-19th Century and with its raised location on a relatively open side of a hill it is part of the scene from many of the lower parts of Brixham. It sits on a steep slope and fronts the narrow lane of [address] and has a rear elevation to the higher [name].

    The area is of established residential character with a palate of homes coming together in a relatively unified scene. The dwelling is almost built into a cliff and forms a small part of one of the contour lines of steeply rising terraces which create part of the pleasing and characteristic scene from the harbour and other lower environs. The appeal proposal is as described above.

    The site lies within the Brixham Town Conservation Area. There is a duty imposed by Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 requiring decision makers to have special regard to the desirability of preserving or enhancing the character or appearance of a Conservation Area. Policy SS10 of the Torbay Local Plan (LP) and Policy BE1 of the Brixham Peninsula Neighbourhood Plan (NP) reflect the importance placed on Conservation Areas.

    The CA is characterised by its C17 to C19 buildings and terraces of plain and simple design amongst more detailed and elaborate larger houses. The part of the CA the appeal site sits within contains varied inharmonious groups of flat roof front and rear dormer extensions and window alterations and the use of uPVC is a ubiquitous feature of these terraces. The appeal property has a form of widened uPVC fenestration.

    I can entirely see the reasoning of the Council, through its interpretation of policy protection and practice in development control, seeking to secure that replacement windows in Conservation Areas will be constructed in traditional materials. I understand and acknowledge the planning officer’s report’s criticism of the detail relating to uPVC windows. In the vast majority of cases, in my experience, a negative stance in a Conservation Area, including in parts of this one, would be the appropriate approach.

    However, as an exception I differ in this case. There are three reasons why I am not minded to align with the Council on this particular case. 2

    Firstly, uPVC windows and doors are presently in place on the appeal property and the scheme would in reality present very little difference to the existing scene; it would effectively be preserved. Secondly, most of the immediate and close-by homes have this form and style of glazing providing a context. Thirdly, the largest part of the aesthetic and historic interest of this extensive section of the Conservation Area is, to my mind, the steeply rising pattern of increasingly elevated terraces which, through height, proportion, colour and roof line, and notwithstanding some questionable fine detail, are key components in the character of Brixham.

    As a final point I would concur with the Appellants that a number of the other planned alterations and changes would be aesthetically positive and make the property sit more comfortably in its surrounds.

    Having regard to the foregoing I conclude that there would not be conflict with S72(1) of the Act and LP Policy SS10 along with NP Policy BE1 as cited above; there would be preservation of the character and appearance of the Conservation Area. Additionally, LP Policy DE1 and [name] BH5 and BH6 have relevance to the case. Taken together, and amongst other matters, they seek to ensure that development is well designed, recognises townscape character, and incorporates appropriate fenestration. I conclude that the appeal scheme would not run contrary to these policies.

  6. Section 07

    Energy consumption and carbon emissions

    The Planning Officer Report alleges there is a renewable nature and long-life span of timber fenestration, heat loss benefits, lower use of energy in construction, ease of recycling and a relative lack of oil use all compared to uPVC. I can appreciate that there may be a degree of soundness in some of these sentiments. However, in this specific case I do not have enough evidence before me to deem that there would be such a marked difference between timber and uPVC frames in overall and full-life-term energy consumption and carbon emissions such that I should use the matter in the planning balance as an over-riding factor to dismiss the proposal. This is also in the context of my findings above and the benefits to the quality of life of the Appellants.

    LP Policy ES1 is concerned with seeking to limited carbon emissions and energy use and I conclude that the appeal proposals would not conflict with the specifics or objectives of this policy.

  7. Section 08

    Conditions

    The Council suggests the standard commencement condition along with the requirement for materials to match the existing building. I would agree with the latter in the interests of visual amenity. I also agree that there should be a condition that works are to be carried out in accordance with listed, approved, plans; to provide certainty.

  8. Section 09

    Overall conclusion

    For the reasons given above I conclude that the appeal proposal would not have unacceptable adverse effects on the character or appearance of the host property and the locality or on energy consumption and carbon emissions. Accordingly, the appeal is allowed. 3

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 352No official casework-database value to compare
    Extracted decision date · page 1
    26 November 2024Matches the official casework database
    Extracted site visit dates
    12 November 2024 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 352No official casework-database value to compare
    Extracted decision date · page 1
    26 November 2024Matches the official casework database

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3350973
Application reference
P/2023/0687
Lead case reference
Not recorded
Planning authority
Torbay Council
Planning authority code
E06000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 August 2024
Valid date
29 August 2024
Start date
23 September 2024
Planning authority decision date
7 June 2024
Appeal decision date
26 November 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
60644
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21