Appeal 3350975
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a two-storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are (i) the effect of the proposed extension on the character and appearance of the host dwelling and the street scene of [address], and (ii) the effect on the living conditions as regards outlook and light for the occupiers of No. [address].
Section 04
Reasons
On the first issue, I saw on my visit that the appeal property is one half of a semi-detached pair with No. 56 and with the pair being the middle building in a row of three of the same design. The symmetry of the largely unaltered front elevations of each pair and the resultant rhythm of the row is a particularly pleasing feature of the street scene.
Although the proposed full length side extension would have a slight set back from the front wall and set down from the roof ridge to comply with the Council’s design guidance, it would extend to within a short distance to the property’s boundary with No. 52. The effect of this would be to harmfully affect both the symmetry of the pair and the rhythm of the row.
In order to avoid this harm and having particular regard to the site-specific circumstances of this application, the side extension would have had to be significantly recessed from the front elevation instead of the slight set back currently proposed (albeit in line with the Council’s design guidance), together with the extension also having a slightly narrower width.
However, with the scheme as presented in the appeal application I agree with the Council’s view that the proposal would have a terracing effect, even recognising that a two-storey side extension to No. 52 would not appear feasible. Moreover, the relocation of the dwelling’s entrance to the front would further affect the symmetry of the pair with No. 56, although this feature on its own would not warrant refusal of the application.
On the second issue, the two-storey extension in its position close to the boundary with No. 52 would inevitably result in a significant degree of enclosure to the windows and entrance door of this property and thereby have an unacceptable impact on the living conditions for existing and future occupiers of that property as regards light and outlook.
I have carefully considered the submissions of the appellant, both in the written appeal statement and her letter dated 13 June 2024. In both documents my attention has been drawn to other examples of side extensions in the locality. However, none of these sufficiently replicate the setting, siting and resultant combination of symmetry and rhythm in this case that would justify my overturning the Council’s decision to refuse permission on the main issues of the development’s harmful effect the character and appearance of the area and the neighbour’s living conditions.
Accordingly, I find that there would be an unacceptably harmful conflict with Policy CP17 of the Exeter City Council LDF Core Strategy 2012; Saved Policy DG1 of the Exeter Local Plan First Review 1996-2011 and with Government policy in Section 12: ‘[name] of the National Planning Policy Framework, revised December 2024.
For these reasons and having had regard to all other matters raised, the appeal fails.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 204No official casework-database value to compare
- Extracted decision date · page 1
- 17 February 2025Matches the official casework database
- Extracted site visit dates
- 21 January 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3350975
- Application reference
- 24/0466/FUL
- Lead case reference
- Not recorded
- Planning authority
- Exeter City Council
- Planning authority code
- E07000041
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 16 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 29 August 2024
- Valid date
- 6 September 2024
- Start date
- 25 September 2024
- Planning authority decision date
- 1 July 2024
- Appeal decision date
- 17 February 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 64711
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21