Skip to main content
Official casework recordDismissedCurrent release

Appeal 3351240

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the phased conversion and extension to existing single storey former public toilet building to provide single dwelling with ground floor workshop and storage.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Background and Main Issue

    The planning permission that is the subject of this appeal, is for the phasing of a previously permitted development, and includes the same conditions. Condition 8 was imposed in accordance with the advice of the Highway Authority due to highway safety concerns relating to vehicles blocking the carriageway and inadequate pedestrian visibility. The appellant seeks the removal of the condition stating that such highway safety concerns could be addressed.

    Having regard to the appeal submissions, the main issue is whether or not the disputed condition is reasonable and necessary in the interests of highway safety.

  3. Section 04

    Reasons

    The front elevation of the appeal building, where the vehicular entrance would be located, is set back a short distance from the front elevation of a three-storey property, the Masala restaurant, to which it is attached. The side elevation of the Masala would closely flank the access point on one side and extend up to the carriageway of [name]. In such a position it would significantly restrict the visibility of drivers on exit from the appeal building.

    My observations on the site visit suggests that [name] is a busy pedestrianised route and that pedestrians moving along it in a southerly direction, before turning right towards [name] car park and Greyfriars bridge, walk very close to the Masala. In such a position the pedestrians are unlikely to see a vehicle exiting the building in advance of it joining the carriageway, and any driver exiting the building would have limited forewarning of such pedestrians, even when travelling in a forward gear. This would make it extremely challenging for the driver and pedestrians to anticipate each other’s movements and stop as appropriate. Consequently, whilst vehicles emerging from the building would occur infrequently and would be moving at a slow speed, the impediment to visibility is likely to result in conflict between such vehicles and other users of [name], in particular pedestrians, to the detriment of highway safety.

    In my experience, bankspeople are utilised in the interests of highway safety as a temporary measure in situations where there are many employees on a site, such as during construction. In this case, the floorspace would limit the number of people that could be employed within the proposed building and, as such, it is reasonable to anticipate that there would not always be someone available to act in such a role. Therefore, I do not consider that it would be reasonable or practicable to require, through a condition, that a banksperson oversees vehicle movements out of the building as suggested.

    I do not doubt that the installation of a convex mirror would assist visibility to some extent. Nonetheless, I am not convinced that it is appropriate to rely on what is in effect a demountable aid which can be adversely impacted, and become less effective, due to frost, glare from sunlight and vehicle headlights, and if dirty. Furthermore, as I have found movements from the building in a forward gear would be unsafe, controls imposed through a planning condition that would prevent reversing manoeuvres during specified hours would not resolve the identified highway safety issues.

    My attention has been drawn to the parking arrangements of other buildings on [name]. On my visit I noted that the parking spaces for [address] and [name] are highly visible and, therefore, do not raise similar highway safety issues. [address] Hotel is set back from the carriageway, pedestrians walking along [name] in a southerly direction would have advance warning of a vehicle leaving the parking space. In addition, I observed that pedestrians walk along the centre of the road when travelling in a northerly direction and, as such, the effect of the Masala on the forward visibility at [address] Hotel is less pronounced. Accordingly, such parking and servicing arrangements do not support a conclusion that the proposal is acceptable in respect of highway safety.

    I acknowledge that the area in front of the building, which is accessed from [address], has been used as a parking space and that there is no evidence before me to suggest that its use is unsafe. However, that does not demonstrate that access from the building onto [name] would not give rise to the highway safety concerns I have identified. Furthermore, the building being historically used as a store for vehicles, at a time when the nature of pedestrian and vehicular movements would have been materially different, does not alter my findings.

    There is insufficient space in front of the appeal building to enable a vehicle to stand clear of the carriageway, which could result in part of the public highway being blocked whilst the door is opened. I am, however, satisfied that a remotely operated electric door, which could be secured through a suitably worded condition, would enable it to be opened in advance so that a vehicle could drive straight in. Nevertheless, it remains that the use of the building as a garage would be unsafe for the reasons set out above.

    I therefore conclude that condition 8 is necessary and reasonable in the interests of highway safety.

  4. Section 05

    Other Matters

    I acknowledge the public car park charges, the costs that would be incurred in undertaking major foundation works, and the payment of the [name] affect the viability of the proposed development. I further acknowledge that the use of the ground floor as a garage would increase the likelihood the building would be brought back into use. Such factors do not, however, outweigh the harm I have identified.

    The appellant has drawn my attention to the Council’s stance regarding pre-application advice and the fees for obtaining such advice. Nonetheless, these matters do not affect my consideration of the planning merits of the proposal.

    The absence of objections from the public does not weigh in favour of the proposal.

  5. Section 06

    Conclusion

    For the reasons given, and taking into account all other matters raised, I conclude that the appeal should be dismissed and the condition retained.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3473No official casework-database value to compare
    Extracted decision date · page 1
    17 January 2025Matches the official casework database
    Extracted site visit dates
    7 January 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3351240
Application reference
24/01723/FUL
Lead case reference
Not recorded
Planning authority
Shropshire County Council
Planning authority code
E06000051

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.01 hectares
Floor space
102 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
4 September 2024
Valid date
4 September 2024
Start date
11 October 2024
Planning authority decision date
14 June 2024
Appeal decision date
17 January 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
63062
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21