Skip to main content
Official casework recordDismissedCurrent release

Appeal 3351572

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

demolition of existing single storey side extension and erection of replacement with associated works.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are: • Whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies. • The effect of the proposal on the openness of the Green Belt. • Whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  3. Section 04

    Whether inappropriate development

    Paragraph 154 of the Framework states that development in the Green Belt is inappropriate unless one of the listed exceptions applies. One such exception being the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. This is also reflected in Policy PG3 of the Cheshire East Local Plan Strategy 2010 – 2030 (2017) (CELPS) and Policy RUR11 of the Cheshire East Local Plan: Site Allocations and Development Policies Document (2022) (SADPD).

    Policy RUR11 states that when considering whether a proposal represents disproportionate additions, matters including height, bulk, form, siting and design will be taken into account. In addition, proposals will usually be considered to represent disproportionate additions where they increase the size of the original building by more than 30% in the Green Belt. It goes on to state exceptions to these size thresholds may be acceptable (my emphasis) where the proposal ii. provides additional floorspace with no significant alterations to the building’s envelope or external appearance (such as basement extensions).

    The main parties disagree the extent to which the extension would increase the size of the original building by. Nonetheless, the appellant accepts that the 30% threshold has already been exceeded. The Council set out various calculations which demonstrate that the original building has already been significantly extended even if the conversions, detached garage and store were excluded from the calculations.

    The appellant has drawn my attention to an approved development in Nether Alderley1 to demonstrate that an exercise of planning judgement and discretion should be applied in considering the 30% threshold. Whilst this does show how the Council has applied the requirements of Policy RUR11 in other cases, factors such as the extent the dwellings have previously been extended and the extent the extensions increase the size of the dwellings cannot be directly compared.

    The proposed development would further increase the floorspace and volume of the dwelling which would add to the scale and massing of the already extensively extended dwelling. The building’s envelope has been significantly altered from the previous extensions. The proposal would further alter the building’s envelope, albeit to a limited degree. Having regard to the increase in volume, floorspace, scale and massing, the proposed development, when taken in combination with significant previous additions, would result in disproportionate additions over and above the size of the original building.

    Consequently, for the reasons given above, the proposal would not fall under any of the exceptions listed in the Framework or Policy PG3 of the CELPS or Policy RUR11 of the SADPD. The development would therefore be inappropriate development in the Green Belt having regard to chapter 13 of the Framework, Policy PG3 of the CELPS and Policy RUR11 of the SADPD.

  4. Section 05

    Openness

    Paragraph 142 of the Framework states that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence.

    The proposal would have a spatial impact because the extension would add to the cumulative bulk, scale and massing of the dwelling and would result in an increase in built development. In terms of visual impact, particularly in winter months, glimpsed views of the extension would be possible from [address].

    Consequently, for the reasons given above, the development would not preserve the openness of the Green Belt, albeit to a very limited degree having regard to its size and siting. As such, the proposal would conflict with the fundamental aim of Green Belt policy, as stated in the Framework, to keep land permanently open.

  5. Section 06

    Other considerations

    Planning permission was previously granted for a side extension2 of the same width to that proposed. However, from the evidence provided, it appears that the overall 1 24/1426M 2 18/2821M size of the approved extension was smaller than that proposed. Thus, I give very limited weight to this consideration.

    The extension would be more in keeping with the host building than the existing extension. It would also be superior to the existing extension in terms of energy efficiency and standard of construction. Given the scale of the development and the existing extension has a neutral impact on the host building, I give extremely limited weight to these considerations.

    The scheme would secure a better living environment for the occupants. Nonetheless, personal circumstances rarely outweigh general planning considerations. Having regard to the information provided, there is not an exceptional need for the extension. Thus, I give extremely limited weight to this consideration.

  6. Section 07

    Conclusion

    I have found that the proposal would be inappropriate development in the Green Belt which is, by definition, harmful to the Green Belt. It would also cause harm to the openness of the Green Belt, albeit that harm would be very limited. Paragraph 153 of the Framework is clear that substantial weight should be given to any harm to the Green Belt, including harm to its openness, and that ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.

    I give very limited weight to the previously approved side extension. In addition, I give extremely limited weight to the design, energy efficiency, standard of construction and improved living environment considerations. When drawing this together, the other considerations advanced in support of the appeal do not clearly outweigh the totality of the harm that I have found. Consequently, the very special circumstances necessary to justify the development do not exist. I therefore conclude that the scheme would conflict with Policy RUR11 of the SADPD, Policy PG3 of the CELPS and the Framework.

    The proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. Consequently, the appeal does not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 603No official casework-database value to compare
    Extracted decision date · page 1
    14 March 2025Matches the official casework database
    Extracted site visit dates
    3 March 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3351572
Application reference
24/2245M
Lead case reference
Not recorded
Planning authority
Cheshire East
Planning authority code
E06000049

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
9 September 2024
Valid date
9 September 2024
Start date
10 October 2024
Planning authority decision date
15 August 2024
Appeal decision date
14 March 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
66261
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21