Appeal 3351674
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The revised National Planning Policy Framework (the Framework) was published in December 2024. The parties have been provided with the opportunity to comment on the implications of the revisions to their cases. I have taken account of the revised Framework, and any comments made, in my determination of the appeal as necessary.
Section 04
[name]
The main issues are: • whether the proposed development would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • the effect of the proposed development on the openness of the Green Belt; • the effect of the proposed development on the character and appearance of the area; and • whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.
Section 05
Whether Inappropriate Development
The appeal dwelling is a detached bungalow located within the Green Belt. The bungalow has a dual pitched roof design, is set back from the highway and screened by a mature hedge. The dwelling is constructed as an L-shape and the appeal scheme would result in a single storey extension adjoining the existing side elevation.
The Framework identifies that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open and therefore the essential characteristics of Green Belts are their openness and their permanence. It further establishes that the construction of new buildings is inappropriate unless it is an exception as outlined in paragraph 154.
The exception outlined in Paragraph 154(c) relates to additions. It establishes that as long as the extension or alteration of a building does not result in a disproportionate addition over and above the size of the original building, it would be deemed as not inappropriate. In the explanation text of Policy DM21 of the [name] and Chester Council Local Plan Part Two (the LP) it states that subordinate and small-scale extensions should not increase the size of the original dwelling by more than 30%.
The proposed single storey side extension would result in approximately 71.4m2 of additional living space. The appeal scheme alone would result in an increase in the floor space of approximately 88%. Given the large increase, the appeal scheme would be inappropriate development in the Green Belt. It would therefore conflict with Policies STRAT9 and DM21 of the LP insofar as they seek to ensure development in the Green Belt is not inappropriate.
Section 06
Openness
Planning Practice Guidance (PPG) sets out factors that can be taken into account when considering the openness of the Green Belt. It outlines that the openness of the Green Belt includes but is not limited to both spatial and visual aspects, duration and remediability and degree of activity1.
The proposed single storey side extension would infill the existing ‘L’ shape of the appeal dwelling and given that I have identified above that it would result in an increase of approximately 88%, it would have more of an impact on openness of the Green Belt in spatial terms than the existing circumstances.
The appeal site is set back from the road and is screened by mature hedgerow and vegetation along the boundary, this results in a generally secluded character. Consequently, the appeal scheme would not result in a significant effect on the visual aspect of openness of the Green Belt.
Nevertheless, it remains that the appeal scheme would result in substantial harm to the spatial aspect of the openness of the Green Belt.
Section 07
Character and Appearance
The Council has referred in its reason for refusal to the effect of the proposed development on the character of the countryside. However, in its [name] it states that the proposed development would not have a harmful effect on the visual amenity of the appeal site, surrounding properties or wider area.
Nevertheless, given the nearby built form adjacent to the appeal site, the screening provided by the hedgerow and vegetation as well as the single storey character of the proposed development, I do not consider the appeal scheme to result in significant harm to the character of the countryside. 1 Planning Practice Guidance Paragraph: 013 [name]: 64-[phone]
Therefore, the appeal scheme would comply with Policy DM21 of the LP insofar as it seeks to ensure extensions and alterations to existing dwellings assimilate with the character and appearance of the wider setting.
Section 08
[name] and Very Special Circumstances
The appeal dwelling benefits from a lawful development certificate for two extensions which would result in approximately 48.5m2 of additional space. It also benefits from an extant permission for a single storey extension to the rear which was secured through the prior approval process 2 which would provide an additional 71.5m2. Therefore, the appellant highlights that they could implement extensions totalling an approximate 120m2. Whereas the extension subject of this appeal would add 71.4m2.
The consideration of a fallback position, including what can be erected under permitted development, is a well-established principle. Given that the appellant has sought prior approval for additions to the dwelling, there is a greater than theoretical possibility that, if the appeal is dismissed, the appellants might pursue the fallback scheme. Consequently, it is a material consideration in my determination of the appeal.
Given the above, the appeal scheme would result in less built form than the aforementioned extant permissions. As such, the appeal scheme would be less harmful than the fallback scheme. The possibility of the implementation of the fallback scheme, rather than the appeal scheme, would amount to the very special circumstances necessary to outweigh the harm to the Green Belt by reason of inappropriateness and harm to the openness of the Green Belt.
However, I cannot be confident that elements of the fallback scheme would not be built prior to the development of the appeal scheme. I note the appellant’s comments that the extension to the North would be unlikely to be implemented due to the adjacent farmer’s field and hedge. Nevertheless, there remains the possibility that elements of the fallback scheme could be undertaken in addition to the appeal scheme before me.
[name], Part 3 of the [name] and [address] Extensions and Domestic Outbuilding Supplementary Planning Document 2021 (the SPD) states that where a fallback position is relied upon consideration will be given to removing permitted development rights. The removal of permitted development rights would result in the inability for the aforementioned fallback scheme to be implemented. However, were I to condition the removal of permitted development rights this would only apply upon the commencement of the development of the appeal scheme. Consequently, elements of the fallback scheme could theoretically already be implemented before the condition would come into force.
There is no signed legal agreement or mechanism before me to prevent the appellant from constructing parts of the fallback scheme before implementing the appeal proposal. This would result in a greater cumulative harm to Green Belt openness than the proposal alone.
A planning condition cannot be imposed to achieve the same result because the condition would only come into force upon the commencement of the new 2 Planning Application Ref: 24/00541/HHE permission. Therefore, it would not be able to prevent the prior implementation of the fallback scheme. As a result, due to this potential outcome I must therefore attach limited weight to the fallback position.
Given all of the above, there is no suitable mechanism for my consideration and no means available within the scope of the present appeal to prevent elements of the fallback scheme being implemented in the event of the appeal being successful. Consequently, harm to the openness of the Green Belt from inappropriate development has not been overcome.
Section 09
Green Belt Balance and Conclusion
Paragraph 153 of the Framework advises that substantial weight is given to any harm to the Green Belt, including harm to its openness. It also indicates that inappropriate development is by definition harmful and should not be approved except in ‘very special circumstances’. These will not exist unless potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal is clearly outweighed by other considerations.
The appeal scheme would be inappropriate development in the Green Belt and harm the openness of the Green Belt.
Weighed against that are the other considerations set out above. However, I find that the other considerations in this case do not clearly outweigh the harm that I have identified. Due to the absence of a suitable mechanism to prevent elements of the fallback scheme being implemented prior to the commencement of the appeal scheme, the very special circumstances necessary to justify the appeal scheme do not exist.
The proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4725No official casework-database value to compare
- Extracted decision date · page 1
- 22 May 2025Matches the official casework database
- Extracted site visit dates
- 8 April 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3351674
- Application reference
- 24/01614/FUL
- Lead case reference
- Not recorded
- Planning authority
- Cheshire West and Chester
- Planning authority code
- E06000050
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 714 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 September 2024
- Valid date
- 11 September 2024
- Start date
- 7 October 2024
- Planning authority decision date
- 6 September 2024
- Appeal decision date
- 22 May 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 69835
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21