Appeal 3352118
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
loft conversion with dormers and hip to gable works.
Section 02
Decision
The appeal is allowed and planning permission is granted for loft conversion with dormers and hip to gable works at [site address] , in accordance with the terms of the application Ref 24/00790/HOU, dated 15 May 2024 and subject to the conditions listed below.
The development hereby permitted shall begin before the expiration of three years from the date of this permission.
The development hereby permitted shall be carried out in accordance with the following approved plans: S1; PL3; PL4.
The external surfaces of the development hereby permitted shall be constructed in materials to match those on the existing building or otherwise be as shown on the approved plans.
Section 03
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host property and surrounding area.
Section 04
Reasons
The Council have referred to policies S1 (Sustainable Development Criteria), S2 (Quality Development) and WE8 ([name], [name] & [name]) of the Teignbridge Local Plan 2013 – 2033 (May 2014) (TLP). These policies seek, amongst other requirements, to ensure that new development is of a high quality design, demonstrates its compatibility with local character, that the design and materials are complementary to the existing building, that the scale is appropriate and does not overdevelop the site or have a dominant and overbearing impact on the streetscene.
[name] policies pre-date those in the National Planning Policy Framework (December 2023) (NPPF). However, a broadly similar approach is set out in paragraph 135 of the NPPF but it differs in that it also states that being sympathetic to local character should not prevent or discourage appropriate innovation or change. The National Design Guide (NDG) (January 2021) reinforces the Framework, for example, at paragraph 44 by emphasising that well designed places do not need to copy their surroundings and that it is appropriate for new development to include innovation and change to reflect how we live today.
Paragraph 139 of the NPPF also states that development that is not well designed should be refused especially where it fails to reflect local design policies and government guidance on design (including the NDG) taking into account any local design guidance and supplementary planning documents (SPD), such as design guides. My attention has not been drawn to any local design guide or similar SPD’s.
Dealing firstly with the proposed rear hip to gable extension, the Council’s reason for refusal does not refer to these works or suggest that they would result in any harm. That appears to be consistent with their [name] which states that as this element is located at the rear of the host property it would not be visible from public view. Hip to gable extensions are a common and accepted way of providing additional headroom within loft conversions. In this particular case, whilst the extension would result in an increase in the bulk and massing of the rear roof, this increase would, in my view, be acceptable and would not be harmful to the host property or to the streetscene.
Turning to the proposed dormers, these would be positioned on either side of the main roof to the host (as extended). They would be set well back from the frontage of the host and its two storey gabled bay window. Whilst you would normally expect the ridge height to the new dormers to be set below that of the existing roof, the proposal shows the ridge heights to match existing. This appears to be due to the need to achieve the appropriate headroom within the loft accommodation. Even so, the proposed dormers would be sited centrally within the roof and well in from its sides (as extended). The dormers would sit well above the eaves, constructed from a pallet of materials to match existing and with a good quality pitched roof gable design. Each dormer would also have a central window that would broadly align with those below.
For the above reasons and notwithstanding the alignment of the ridge, I am satisfied that the proposed dormers would be sympathetic to the design of the host property (as extended). They would integrate well with the proposed hip to gable extension and the existing two storey front gable design, without being visually intrusive. I accept that there would be a material change to the appearance of the front elevation to the main roof, but, even so, the proposed dormers would, in my view, be proportional to and in keeping with the design of the host property.
The surrounding area includes a mixture of property styles, including single storey bungalows and two storey properties. These properties roof forms also vary and whilst there are a number of hipped roofs there are also examples of more traditional pitched roofs as well as gable ends. There is, therefore, no uniform roofscape with the roof form of the host already different to that of its immediate neighbours. In view of this, the proposed dormers would not, in my view, introduce a discordant feature and they would not visually dominate the host or the streetscene. Overall, I am satisfied that the impact of the proposed dormers on the streetscene would be modest, that they would sit reasonably comfortably on the appeal site, be visually well designed and contained within the roofscape (as extended).
Accordingly, I find that the appeal proposal would not result in any harm to the character and appearance of the host property or the surrounding area and would thus accord with policies S1, S2 and WE8 of the TLP, as well as the corresponding policies of the NPPF.
Section 05
Conditions
I have considered the Council’s suggested conditions against the advice in the NPPF and the Planning Practice Guidance chapter on the ‘Use of planning conditions’. The conditions are all standard in requiring compliance with the submitted plans and for materials to match existing or be as shown on the approved plans, which are both necessary and reasonable in order to secure a high quality development.
Section 06
Conclusion
For the reasons given above and having taken all the matters raised into account, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 248No official casework-database value to compare
- Extracted decision date · page 1
- 11 December 2024Matches the official casework database
- Extracted site visit dates
- 9 December 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3352118
- Application reference
- 24/00790/HOU
- Lead case reference
- Not recorded
- Planning authority
- Teignbridge District Council
- Planning authority code
- E07000045
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 18 September 2024
- Valid date
- 18 September 2024
- Start date
- 9 October 2024
- Planning authority decision date
- 19 July 2024
- Appeal decision date
- 11 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61701
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21