Appeal 3352166
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for the erection of a part one, part two storey side and rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a part one, part two storey side and rear extension at [site address] in accordance with the terms of the application, Ref DM2024/01213, and the plans submitted with it, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved document and plans: [name], [name]: 0-1, 1, 2, 4, 5, 6, 7, 8 [name], 9, 10, 11, 12, 13, 14 and 15
The materials and finishes to be used in the construction of the external surfaces of the extension to the existing dwelling hereby permitted shall match those used in the existing dwelling.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling, the pair of dwellings and the street scene.
Section 05
Reasons
This part of [address] is characterised by uniformly designed pairs of two storey houses and short terraces from a range of designs and palette of materials. The appeal dwelling occupies a particularly large and prominent plot adjacent to the junction of [address] and [address].
The appeal dwelling comprises one of a pair of symmetrically designed semi-detached houses with a fully hipped roof. They have two storey gable fronted adjoining projections, with modest sized projecting porches to the side of them. Whilst the front and side elevations of the appeal dwelling are fully rendered with exposed timber detailing above ground floor level, the ground floor front elevation of the adjoining dwelling (No.115), is brick faced with render and exposed timber work above. To the side of the appeal dwelling is a wide single storey extension that projects close to the side boundary of the property, where there is a tall timber fence.
There is a uniformly designed pair of semi-detached houses alongside the appeal dwelling and No.115, although their design and detailing is different. Diagonally opposite the appeal dwelling, fronting [address], is terrace of three houses with very similar detailing to the appeal dwelling, although their roofs are gabled to the sides. On the opposite side of [address] is a pair of semi-detached houses which have attached gable fronted projections, although their detailing is materially different to that of the appeal dwelling.
Regarding corner properties, the majority of dwellings in the local area are set back from the side boundary which fronts onto a highway. Notwithstanding this there are a number of dwellings and extensions in the local area that project up to or very close to the adjacent roads and they have typically blended in appropriately with the street scene.
Amongst other things policy 28 of the Sutton Local Plan 2018 (SLP), requires new development to be attractive and designed to the highest standard. It should respect local context; respond to local character; and make a positive contribution to the street frontage and street scene. The Council’s Supplementary Planning Document – Design of [name] (SPD) is consistent with this. SPD section A.2 advises that as a general rule of thumb side extensions should be no more than one third to one half the width of the existing front elevation. Side extensions should be set back from the front elevation and down from the ridge line of the host dwelling. However, SPD paragraph 3.1.5 advises that an integrated design approach, where an extension is read as part of the original dwelling can work well on some dwellings.
The proposed extension would follow an integrated approach. The front elevation of the proposed side extension would be almost a mirror image of the host dwelling, other than the absence of a front porch. It would also reflect the size and proportions of some of the short terraces along [address], including the terrace opposite. The proposed outer side elevation would project a short distance beyond the rear wall of the original dwelling and would be the same depth as the existing single storey wrap around extension. The proposed single storey rear extension would infill the gap between the retained rear extension and the proposed two storey extension. The roof form, fenestration and external materials and finishes of the proposed extensions would all reflect those of the existing dwelling.
As stated in the SPD, achieving a good materials match can be difficult. In this instance, the outer walls of the dwelling are finished with painted render and timber work. Accordingly, it should not be difficult to achieve a good match. As stated by the Council the use of matching materials is a matter that could be secured by condition. The council has also suggested conditions which require the proposal to be carried out in accordance with the submitted plans and fire safety strategy. These conditions would be necessary to ensure the development respected the host dwelling and the street scene and in the interests of fire safety.
For these reasons the resultant dwelling would appear well balanced. Whilst the extension would be the same width of the existing dwelling, it would respect the uniform appearance of the host dwelling and the pair of dwellings. Also, together with the attached dwelling at No.116 it would have the appearance of a traditionally and uniformly designed short terrace. In this respect it would be consistent with the integrated approach described in [name] 3.1.5 and Figure 3.
The proposed two storey extension would occupy a prominent position within the street scene, close to the junction of [address] and [address], where it would project up to the back edge of the pavement. As stated above the proposed extensions would respect the host dwelling and other dwellings in the immediate area. Most of the nearby pairs of dwellings project close to their side boundaries and there is a terrace of six dwellings a short distance to the southeast of the appeal site. This visually results in an almost continuous line of dwellings with occasional wider gaps.
As stated above, there are some dwellings that project up to or close to adjacent roads off [address], including the front corner of the dwelling located diagonally opposite. The section of St. [address] adjacent to the appeal property is already flanked by tall fences with the existing side extension on the appeal site located close to the highway boundary. Whilst the proposed two storey side extension would add to the sense of enclosure, it would not look out of place and would benefit from the street trees and planting provided by the grass verges on both sides of this part of [address]. For these reasons the proposed dwelling would respect and relate appropriately to the street scene.
Finally, it is acknowledged that the proposed two storey extension would exceed some of the rule of thumb guidelines set out in the SPD. However, as stated in SPD paragraphs 1.1 and 3.02 each case must be assessed on its merits. The advice set out in the SPD provides an overview of the points that need to be taken into consideration when seeking to accommodate and address principles of good design.
I conclude that the proposal would respect the character and appearance of the host dwelling, the pair of dwellings and the street scene. Accordingly, it would comply with SLP Policy 28 and the objectives of the SPD.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1220No official casework-database value to compare
- Extracted decision date · page 1
- 18 November 2024Matches the official casework database
- Extracted site visit dates
- 1 November 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3352166
- Application reference
- DM2024/00622
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Sutton
- Planning authority code
- E09000029
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 64 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 18 September 2024
- Valid date
- 18 September 2024
- Start date
- 10 October 2024
- Planning authority decision date
- 26 June 2024
- Appeal decision date
- 18 November 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 60187
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21