Appeal 3353288
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Single storey detached garden outbuilding for use as storage/ office, ancillary to main building (retrospective).
Section 02
Decision
The appeal is allowed and planning permission is granted for Single storey detached garden outbuilding for use as storage/ office, ancillary to main building at [site address] in accordance with the terms of the application, [name]-13094376 and the plans submitted with it, subject to the following conditions:
The building hereby permitted shall be retained as shown on the following drawings: 16-041-P1; 16-041-P4A; 16-041-P5A.
The building hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling known as [site address]
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no development permitted by virtue of Class E of Part 1 of Schedule 2 to the Order shall be undertaken.
Section 03
[name]
The matter appealed seeks the retention of an existing building has been the subject of and [name] (EN)1. It is noted that the related appeal (the enforcement appeal) was not successful on the substantive issues and, further, that the Council indicate requirements in that regard may not have all been completed. The appellant has ceased the use of the building as an office and has since altered the building in a material respect and submitted amended drawings which are intended to more accurately reflect the works found on site at the date of my site visit. I do not consider the acceptance of this additional information, because it more accurately reflects what I found on site, is 1 APP/A5270/C/18/3203661 - Appeal against enforcement notice No. EN180008CUOB - issued on 23.04.2018 prejudicial to the rights of any party, and it is on that basis that I have determined this appeal.
Section 04
[name]
The main issue is the effect of the development on the character and appearance of the area and the host dwelling, and upon living conditions of occupiers of [address].
Section 05
Reasons
The appeal seeks permission to retain an outbuilding (the building) in a use ancillary to the host dwelling, [site address] (No.348) which is a semi-detached two-storey dwelling within a row of similar dwellings fronting a busy main road. The building has been altered from its former condition by a 1m reduction in its length and by the removal of a linking roof and connecting wall by which it was attached it to the rear of the host dwelling. The cumulative effect of the building added to the already-extended dwelling had resulted in an unbroken flat-roof profile of around 16.8m length2 along the shared boundary from the main rear wall of the original house and described as ’significant back-land development’ and an ‘overdevelopment’ of the rear garden.
Whilst the submissions of that time are not before me to consider, I have been provided with the decision of the EN appeal3 which points to the linking of the building to the immediate rear extension of No.348 as ‘exacerbat(ing) the perception of the overall development being obtrusive and visually discordant’. My observations are that the subsequent minor changes which have the effect of separating the building from the main body of the house and reducing its length have made a physically small but materially significant difference to the circumstances to be considered. Whilst these changes are not visible from the street, the result of the alterations to what was originally constructed is that the building appears as an individual building of around 6.8m in depth4 when viewed from other locations.
The appellant has introduced a fallback argument which merits consideration. It is stated that if the appellant were to take steps in compliance with the EN an ‘almost identical’ outbuilding could be immediately erected under as development permitted under Class E of Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order (GPDO). I consider this to be a realistic prospect in the event that the EN requirements were to be implemented in full and therefore have regard to that as a potential consequence of this appeal being dismissed. Whilst a building of the same height as currently found in proximity to the boundary would conflict with the provisions set out in the GPDO at E1 (e)5 it is suggested that the extra height found is not material in this specific setting.
The height of the building at the shared boundary with No.350 is higher than that permitted under the GPDO and therefore more prominent than would be the case in the fallback position. However, there is little impact on the outlook from habitable rooms of No.350 due to intervening garage structure. Also, the part of 2 According to the Council 3 APP/A5270/C/18/3203661 dated 1 April 2019 4 Calculated from the dimensions given in the Council’s officer report. 5 which limits height to 2.5m within 2m of a boundary that neighbouring garden directly affected by the building is not in close proximity to those parts which appear to be in frequent use. It is my conclusion that what has been built is unlikely to significantly impair the use of that amenity area or the living conditions of neighbouring occupiers. In any event it is likely that a replacement outbuilding or outbuildings permitted by the provisions of the GPDO such as suggested by the appellant would have an impact that might not be materially different.
Turning to the effect of the building on the host dwelling and the wider area, the building is not apparent in the street scene and the changes have had no impact in that respect, however the separation of the outbuilding from the host dwelling has created a visual separation such that the building is no longer perceived as an excessively and disproportionate extension to the host dwelling but as an ancillary structure within its rear amenity space.
Overall, although it is asserted that the building is not consistent with the development pattern of the surrounding area, my observations direct that there are a number of examples where single storey extensions or freestanding outbuildings project similarly into the gardens of nearby dwellings. Further, the pattern of development in the immediate locality does not, in my consideration, closely follow the conventional suburban layout or exhibit a strong or high-value visual character upon which previous observations seem to depend6. Whilst the building falls short of high quality design, it is also material that the grant of permission could remove, by condition, the potential for further outbuildings to be erected within the curtilage of No.348 and this tips the planning balance in favour of granting permission.
I therefore conclude the building does not conflict with Policy 7B of the Ealing Development Management DPD (2013) ([name]) which seeks high quality design and a high standard of amenity for users, nor with the development plan as a whole. Taking all matters raised into account I allow the appeal subject to conditions which, as my reasoning explains, prevent further change to what has been built or further outbuildings to be erected within the curtilage of No.348. A condition to prevent any independent use of the building is appropriate having regard to the EN but no timing condition is required as what is permitted has been completed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2574No official casework-database value to compare
- Extracted decision date · page 1
- 10 December 2024Matches the official casework database
- Extracted site visit dates
- 22 November 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3353288
- Application reference
- PP-13094376
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Ealing
- Planning authority code
- E09000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 32 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 October 2024
- Valid date
- 10 October 2024
- Start date
- 22 October 2024
- Planning authority decision date
- 17 July 2024
- Appeal decision date
- 10 December 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 61570
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21