Skip to main content
Official casework recordDismissedCurrent release

Appeal 3353300

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

gablet extension to rear of existing garage (permitted as ancillary accommodation: PP ref. 20/03598/FUL) together with alterations to the facade materials via the addition of cedar cladding to each gable inset.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The appeal site is within Broseley Conservation Area (CA) wherein I have a statutory duty under Section 72 (1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (PLBCAA) to pay special attention to the desirability of preserving or enhancing the character or appearance of the area.

  3. Section 04

    Main Issue

    The main issue in this appeal is whether the proposed development would preserve or enhance the character or appearance of the CA.

  4. Section 05

    The Significance of the CA

    The significance of the CA stems from its historic importance, the survival of its historic pattern of settlement and buildings that reflect Broseley’s evolution. The Broseley Conservation Area Appraisal (March 2008) (BCCA) highlights the diverse but traditional styles and architectural detailing which epitomises the buildings in the CA. It is noted that Broseley is a predominantly brick and tile town, reflecting the local tradition of brick construction in the area. The BCCA notes that the use of non-traditional materials and inappropriate detailing risks eroding the character of the CA.

  5. Section 06

    The Effect of the Proposed Development on the Significance of the CA

    The appeal site relates to a relatively modern detached two storey house which is set back from [address] behind a stone wall, rising garden land and driveway. A brick built double garage with a dual pitched roof sits to the front of the house. The site’s position on elevated ground makes the house and garage highly visible from the road. Planning permission1 has been granted to convert the garage into ancillary accommodation, including installation of an external staircase to the upper floor of the garage. The surrounding area is predominantly residential in character, containing houses of various ages, size and design.

    The proposal seeks to add a single gablet extension to the northern roof slope of the garage and cedar cladding to each of the three gables (including the proposed new gablet). The submitted Planning and [name] contends that the proposed architectural style and materials palette would reflect the main house, neighbouring properties and those in the wider area.

    The main house is largely of brick construction with a tiled roof and dormer gables. There is no cedar cladding to the exterior of the main house and the dormer gablets are lead clad. Within this context, the proposal would introduce a material which would be discordant with the materials palette of the main house.

    While there are examples of timber cladding on buildings in the area, the cladding remains subservient in coverage to their host building. In contrast, the proposed timber cladding would fill the gables of the garage from their apex to the eaves line of the building, covering a large proportion of those elevations and creating a dominant feature on the building. The proposed cladding would be visually intrusive by virtue of its coverage, elevated position and anomalous material, drawing attention to its incongruity.

    While the garage is not of particular architectural merit, the proposal to introduce a relatively large gablet to the building would create an unbalanced and visually awkward addition that would undermine its cohesive and proportional design. Despite the mature vegetation on the east side of [address], the proposed alterations to the garage would be highly visible from the street due to the site’s elevated position.

    The appellant has pointed to a variety of gables in the immediate and wider area. However, the majority of these relate to houses which are materially different in size, massing and design to the garage. Of the limited examples provided relating to garages, I do not have the full details of these schemes so I cannot be certain that the circumstances of those cases or the polices that applied at the time of their consideration are the same. In any event, I have considered the appeal proposal on its own merits.

    Given the above, the proposal would fail to preserve or enhance the character or appearance of the CA, thereby harming the significance of the CA. Accordingly, the proposal would fail to accord with section 72(1) of the PLBCAA.

    The degree of harm to the CA would be less than substantial in the terms of the National Planning Policy Framework (Framework) given the scale and nature of the proposal. In such circumstances, paragraph 215 of Framework establishes that where a proposal would lead to less than substantial harm to the significance of a designated heritage asset (in this case the CA), this harm should be weighed against the public benefits of the proposal. 1 Ref. 20/03598/FUL.

  6. Section 07

    Public Benefits

    The proposal would enhance ancillary accommodation and provide benefit to its occupiers in terms of increased space. However, this would amount to a private benefit to occupiers, so I am only able to give this very limited weight.

    The appellant contends that the proposal would make a positive contribution to the CA. However, for the reasons given above, I find that the scheme, on the contrary, would neither preserve or enhance the character or appearance of the CA.

    Paragraph 212 of the Framework advises that great weight should be given to the asset’s conservation, irrespective of whether any potential harm amounts to substantial harm, total loss or less than substantial harm to its significance. Furthermore paragraph 213 of the Framework indicates that any harm to the significance of a designated heritage asset should require clear and convincing justification.

    The very limited public benefits would not be sufficient to outweigh the less than substantial harm the appeal scheme would cause to the significance of the CA, which carries great weight.

    Consequently, I conclude that the proposed development would neither preserve nor enhance the character or appearance of the CA. Hence it would conflict with Policies CS6 and CS17 of the Shropshire Local Development Framework Adopted [name] (March 2011), Policies MD2 and MD13 of the Site Allocations and Management of Development Plan (December 2015) and Policy D1 of the Broseley Neighbourhood Development Plan 2020-2038 (March 2020) insofar as they require development to protect, conserve and enhance the historic environment, reflect local character and achieve high quality design. Additionally, the proposal would conflict with the overarching aims of section 16 of the Framework ‘Conserving and enhancing the historic environment’

  7. Section 08

    Conclusion

    The proposal conflicts with the development plan and material considerations do not indicate that the appeal should be decided other than in accordance with the development plan. For the reasons given above, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4744No official casework-database value to compare
    Extracted decision date · page 1
    16 April 2025Matches the official casework database
    Extracted site visit dates
    25 March 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3353300
Application reference
24/02347/FUL
Lead case reference
Not recorded
Planning authority
Shropshire County Council
Planning authority code
E06000051

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
Yes
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
7 October 2024
Valid date
10 October 2024
Start date
29 October 2024
Planning authority decision date
15 August 2024
Appeal decision date
16 April 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
68149
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21