Skip to main content
Official casework recordAllowedCurrent release

Appeal 3353444

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a single storey rear extension at [site address] , Upminster, [postcode] in accordance with the terms of the application ref P0876.24, dated 20 June 2024, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no windows or other openings shall be constructed on the flank elevations of the extension hereby permitted.

    The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 01, 02, 04 & 05.

  2. Section 03

    Main issues

    The first two main issues in this appeal are the effect of the proposed development on the character and appearance of the surrounding area, and on the living conditions of adjoining occupiers. A further main issue is the existence of a ‘fallback’ position. www.planningportal.gov.uk/planninginspectorate

  3. Section 04

    Character and appearance

    The proposed extension would be across the rear of the house with a depth of 6m and eaves height of 2.85m, with a pitched roof that rises to a small crown roof segment. The general architectural approach to extending the house with a single storey addition would reflect the character of the existing house, which sees a pitched roof, and the wider area which sees single storey extensions.

    I saw at my site visit there are properties that have evidently been extended to the rear and at upper levels over the years, with differing design approaches. There is also some variety in properties in the wider area with buildings of different designs and siting, not least the adjoining bungalow at [address] that is set further back into its garden than No. 193. The appeal property has a large garden, as do other properties.

    The proposals would be seen in the garden area and from the rear of other properties in the context of the above mixed character, and within an area where an extension of the scale involved would not appear over-dominant to the host property or locality.

    The extension would thus not be harmful to the character and appearance of the area, and so be consistent with Policy D4 of the London Plan 2021 and Policy 7 of the Havering Local Plan 2021, and the [name] and Alterations Supplementary Planning Document 2011 (SPD) which, amongst other matters, seek to ensure development proposals are of a high quality design and respond to the features of the site and local area.

  4. Section 05

    Living conditions

    The rearward projection of the extension would only come a limited amount beyond the rear of the adjoining property of No. 191, as that dwelling has a rear building line notably deeper than the appeal property. There is a window to the rear of No. [address] to the boundary line, but from the information presented to me and observations at the site visit, I consider the limited degree of projection beyond that window means there would not be an imposing impact, nor material effect on levels of light. I note the degree of projection beyond the rear wall of No. 191 is within the general tolerance for the projection of rear extensions relative to neighbouring properties, as set out in the SPD, and the Council did not raise objection to the effect on No. 191. This matter reinforces my findings with respect to No. 191.

    The proposed extension would sit on the boundary with the attached house of [address]. The depth and height of this extension, when combined with the position on the boundary, would be of considerable size. This would impact on the outlook from No. 195 and create an overbearing impact. Policies 7 and 26 of the Local Plan, amongst other matters, resist development that causes unacceptable harm to residential amenity. Similar objectives are set out in the SPD. The impact to the occupiers of No. 195 mean that the proposal would conflict with these policies and the SPD. 2

  5. Section 06

    The ‘fallback’ position

    The appellant and the Council have confirmed that a single storey rear extension of the same depth and height on this boundary with No. 195 could be built under permitted development rights. This followed an application which confirmed prior approval was not needed for such work (ref. Y0076.24), and a subsequent Certificate of Lawfulness confirming the extension would be lawful (ref. D0185.24). This alternative planning outcome has been put forward, and so is a potential ‘fallback’ position which must be addressed.

    For a fallback position to be a relevant material consideration, the basic principle is that it must be a real prospect. For the prospect to be real, there must be a greater than theoretical possibility that the development might take place. The fallback position has been clearly explained by the appellant. The scheme differs from the proposals the subject of this appeal only by the width of the extension; the appeal scheme would provide additional floorspace, but it is evident to me that the fallback scheme would still provide a very good-sized extension to the house. The appeal site is free from any obvious obstructions that might prevent implementation of the fallback scheme, and therefore provide the additional space for the appellant that has recently been confirmed as lawful. The Council do not dispute that the appellant would carry out the fallback scheme if this appeal is dismissed.

    Based on the above findings I am satisfied there is a real prospect of the fallback position being implemented. Consequently, it represents a viable fallback position. However, the degree of weight to be given to the fallback position depends on whether it would be equally or more harmful than the scheme proposed.

    The extension under the fallback position would have the same impact on the outlook of No. 195 as it is the same depth, height and design. If the appeal was dismissed, then in my judgment there would be no different outcome to the living conditions of No. 195; the appellant is very likely to simply implement the lawful extension. I therefore attach very significant weight to the fallback position.

  6. Section 07

    Overall conclusion

    I have found that the proposal would not be harmful to the character and appearance of the area, or to the living conditions of the occupiers of [address], but would be harmful to the living conditions of the occupiers of No. 195 and this would lead to conflict with the development plan.

    The determination of this appeal must be made in accordance with the development plan unless material considerations indicate otherwise. In my judgement, the fallback position for the appellant represents a material consideration of very significant weight sufficient to outweigh this conflict; there would be no difference to living conditions of adjoining occupiers if the appeal was to be dismissed. As the larger extension the subject of this appeal leads to no other harm, and would provide the appellant with additional living space through the adaptation and extension of his home – which is in general supported by the SPD – the circumstances of this case therefore lead me to allowing this appeal. 3

    In the event of the appeal being allowed the Council suggested a number of conditions. I agree that conditions relating to materials and specifying the approved plans are necessary, to ensure a satisfactory appearance to the development and in the interests of precision. In the interests of privacy I have attached the conditions removing permitted development rights for openings in the flank elevations and restricting the use of the roof as a balcony which, although a small space, is a flat roof area. I have modified the wording in those conditions in the interests of precision and enforceability.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 97No official casework-database value to compare
    Extracted decision date · page 1
    30 December 2024Matches the official casework database
    Extracted site visit dates
    19 November 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3353444
Application reference
P0876.24
Lead case reference
Not recorded
Planning authority
London Borough of Havering
Planning authority code
E09000016

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
9 October 2024
Valid date
9 October 2024
Start date
21 October 2024
Planning authority decision date
28 August 2024
Appeal decision date
30 December 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
62269
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21