Skip to main content
Official casework recordAllowedCurrent release

Appeal 3353661

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘construction of a single storey ground floor rear extension. Rear extension shall only extend by 3m beyond the current existing extension. This would create a cumulative depth of 5.5m beyond the original wall of the property. This would be acceptable as it is only 3m beyond the neighbouring ground floor habitable window. The new extension shall be a flat roof height of 3m and an eaves height of 2.85m. No work shall be done on the loft level, first floor level or front elevation of the property.’

  1. Section 02

    Decision

    The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 1, Class A, paragraph A.4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO) for construction of a single storey ground floor rear extension (Rear extension shall only extend by 3m beyond the current existing extension. This would create a cumulative depth of 5.5m beyond the original wall of the property. The new extension shall be a flat roof height of 3m and an eaves height of 2.85m) at [site address] in accordance with the application Ref 24/02682/PRH, made on 7 August 2024, and the details submitted with it including [name]/060/24/01 Rev 01, PAA/060/24/05 Rev 01, PAA/060/24/07 Rev 01, PAA/060/24/09 Rev 01, PAA/060/24/11 Rev 01 and PAA/060/24/13 Rev 01 pursuant to Article 3(1) and Schedule 2, Part 1, Class A, paragraph A.4(2) of the GPDO.

  2. Section 03

    Preliminary Matters

    In the interests of clarity, the description of development in the decision is based on that contained in the application form. Parts of that description that are explanatory/do not refer to acts of development have been removed.

    Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO), states that the enlargement of a dwellinghouse is permitted development subject to limitations and conditions.

    Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g), Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply with the conditions, limitations or restrictions that are applicable to such permitted development.

    The provisions of Article 3(1) and Schedule 2, Part 1, Class A, paragraphs A.1 and A.3 of the GPDO are not matters of dispute between the main parties.

    Where any occupier of any adjoining premises objects to the proposed development, [name].4(7) to Part 1 requires the local planning authority to assess the impact of the proposed development on the amenity of any adjoining premises.

    Following the Council’s notification of the proposed development, an objection was received from the occupiers of [address] (No 2). No concerns were raised by the Council regarding the effect of the development on the living conditions of the occupiers of [address]. From what I saw on site, there is no reason for me to disagree with this conclusion and the main issue has been defined on this basis.

    The principle of the development is established by the GPDO, and the provisions therein do not require regard to be had to the development plan, although I have had regard to it as a material consideration.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the living conditions of the occupiers of No 2, with particular regard to sunlight and outlook.

  4. Section 05

    Reasons

    The appeal site (No 4) comprises a mid-terrace two-storey dwelling with a dormer roof extension to its rear. No [address] dwelling that adjoins the appeal site and sits at the corner of [address] and [address]. It has a single storey flat roof extension which is stepped in depth, containing full height dining room windows/patio doors nearest to the shared boundary. The main outlook for the occupiers of No 2 is across its own rear garden area. Whilst its garden is slightly smaller than other gardens within the terrace, its end position means that its outlook above the boundary fence towards [address] is relatively open.

    The proposal is for a rear extension that would extend 3 metres beyond the previously added rear extension that measures 2.5 metres deep. It would extend the full width of the rear elevation of No 4. The development would be slightly taller and more solid than the current pergola it would replace. It would also be taller than the close boarded fence that sits along the shared boundary, although it would sit alongside a relatively small length of this boundary overall.

    The side wall of the proposed extension would be visible from the rear windows of No 4, albeit at oblique angles. Even so, the single storey-scale and limited projection of the extension would assist in ensuring that an acceptable level of outlook is maintained for the occupiers of No 2. For the same reasons, and taking into account the size of the windows, I am not persuaded that the occupiers of No 2 would experience any overshadowing or material loss of sunlight.

    In coming to this view, I have had regard to the Council’s concern that the proposed extension would infringe the 45-degree line taken from the nearest ground floor rear window at No 4. However, no diagram has been provided to demonstrate this and from the evidence available I consider it likely that any such incursion would be minimal. Whilst located away from the shared boundary, the proposed projection beyond the furthest extent of No 2’s existing extension would also be limited.

    I conclude that the proposed development would not result in an adverse effect on the living conditions of the occupiers of No 2, with particular regard to sunlight and outlook. Insofar as they are material considerations, the proposed development would therefore accord with the aims of Core Policy 30 of The Enfield Plan Core Strategy 2010-2025 (2010) and Policies DMD8 and DMD11 of the Improving Enfield Development Management Document (DPD) (2014) which require development to ensure there is no impact on the amenities of neighbouring properties and to maintain and improve the quality of the built environment.

  5. Section 06

    [name]

    As has already been set out, the GPDO limits the assessment of the proposal to its impact on the amenity of any adjoining premises. As such, matters relating to damage during construction, the hedgerow boundary, ownership and the party wall are not matters for my consideration in this appeal. Such issues are a private matter between the relevant parties.

  6. Section 07

    Conditions

    Any planning permission granted under Article 3(1) and Schedule 2, Part 1, Class A is subject to the conditions in sections A.3 and A.4. This includes the requirement for the exterior materials to be similar to those used in the construction of the exterior of the existing dwellinghouse and that the development is carried out in accordance with the details and plans submitted as part of the application to the local planning authority.

    With regards to the details and plans submitted as part of the application, A.4 (b) requires a plan indicating the site and showing the proposed development and any existing enlargement of the original dwellinghouse to which the enlarged part will be joined. The submitted block plan does not appear to accurately depict the position of the proposed extension. Even so, the appellant has clarified that the submitted block plan, is intended as a supporting location diagram only, and is not the primary technical drawing used to determine projection distances or structural alignment. In this case, the scaled plans, when read in conjunction with the description are precise and unambiguous.

    No further conditions are necessary.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the appeal should be allowed and prior approval is granted.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 9No official casework-database value to compare
    Extracted decision date · page 1
    13 May 2025Matches the official casework database
    Extracted site visit dates
    7 April 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3353661
Application reference
24/02682/PRH
Lead case reference
Not recorded
Planning authority
London Borough of Enfield
Planning authority code
E09000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
3. Refused prior approval of permitted development rights
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
14 October 2024
Valid date
14 October 2024
Start date
7 November 2024
Planning authority decision date
17 September 2024
Appeal decision date
13 May 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
69428
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21