Appeal 3355179
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a part single, part two storey, part first floor rear extension and alterations to fenestration.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues in this appeal are the effect of the proposed development on (i) the character and appearance of the host property and area, (ii) whether flood risk would be appropriately mitigated, and (iii) the effect on protected bat species.
Section 04
Character and appearance
The appeal property is a semi-detached dormer bungalow that is set within a linear row of mostly dormer bungalows of different designs fronting [address]. The rear facing elevation of the appeal property is visible from the nearby road of Waylands, in a vista that includes a number of bungalows with sizeable box-like rear dormers. In those views the appeal property’s relatively tall steeply pitched roof is more or less symmetrical with the attached property at Number 40, where they form a visually distinctive and well-balanced pair of dwellings in the roofscape.
The proposed extension would project out over the existing single storey rear wing by a considerable distance beyond the host dwelling’s rear roof slope, and much further than the rear dormers of the nearby properties. In combination with the depth of its rearward projection, the height and width of the proposed extension would add considerable bulk and mass in an elevated position that would be visible from Waylands and nearby properties.
In those views the proposed extension would not appear subservient to the host dwelling. The long flank walls and the relatively shallow pitch to its hipped roof form and high eaves level would be inconsistent with the proportions of the host property’s roof form. Even when seen in the context of the existing sizeable rear box dormers of a number of nearby properties in the roofscape, the proposed extension’s scale and form would lead to it being a visually dominant and discordant addition that would be out of keeping with the scale and proportions of the host property, and those within the row. Sympathetic facing materials would not overcome the visual harm caused by the appeal proposal.
Therefore, the proposed extension would not be consistent with Principle 10.1 of the Council’s Design Guide1 which advises that extensions will be expected to be subordinate to the host building and to respect its style and form, and that developments that are over-dominant or out of keeping will be resisted.
For these reasons, I conclude on this main issue that the proposed development would harm the character and appearance of the host property and area. It would therefore conflict with Policy QP3 of the Royal Borough of Windsor and Maidenhead - Borough Local Plan 2013-2033, [name] 2022 (“the BLP”), insofar as it requires development to be of high quality design and to respect the local character of the environment, paying particular regard to scale, bulk, massing and proportions. Whilst the Council referenced Policy DG3 of the Horton and Wraysbury Neighbourhood Plan 2018-2033 in the reason for refusal, that policy is not before me in evidence and thus not available to me.
There would also be conflict with paragraph 135 of the National Planning Policy Framework (“the Framework”) insofar as it requires planning decisions to ensure that developments are sympathetic to local character and the surrounding built environment.
Section 05
Flooding
The evidence indicates that the appeal site is located within [name] 2 as shown on the Environment Agency’s (EA) [name], and at a medium probability of flooding.
The absence of a Flood Risk Assessment (FRA) is contrary to footnotes 62 and 63 of the Framework, which require a site-specific FRA for all development in [name] 2 and 3, including householder development, in order the demonstrate compliance with Framework paragraph 181. Amongst others, this paragraph requires it to be demonstrated that development does not increase flood risk elsewhere and is, amongst others, appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment.
The Council refers to the EA’s standing advice. EA guidance titled ‘Preparing a flood risk assessment: standing advice’ states under the heading ‘Advice for minor extensions’ that a FRA should include the estimated flood level for the development, details of the finished floor levels and details of flood resistance and resilience plans. It also advises that the development will also need to include extra flood resistance and resilience measures if floor levels cannot be raised above the estimated flood level.
The submitted drawings show that the south facing wall of the ground floor wing would be extended closer to the common boundary with the attached property resulting in a very small increase in the footprint of the building. However, in the absence of a FRA, I am unable to determine whether the proposed development 1 Royal Borough of Windsor and Maidenhead Borough Wide Design Guide Supplementary Planning Document, June 2020. would be consistent with EA standing advice for flood risk assessments, including any requirement for extra flood resistance and resilience measures. Consequently, in the absence of a site-specific FRA it has not been demonstrated that the appeal proposal would meet the requirements of [name] for minor extensions and Framework paragraph 181.
I therefore conclude on this main issue that it has not been demonstrated that the proposed development would adequately mitigate flood risk, contrary to BLP Policy NR1 insofar as it requires an appropriate FRA to demonstrate that development is designed to ensure that flood risk is acceptable in planning terms, and that it meets the requirements of Framework paragraph 181 set out above.
Section 06
Protected bat species
Guidance from Natural England (NE) titled ‘Bats: advice for making planning decisions’ states that a protected species survey should be requested where buildings are likely to contain roosts, including when they are near habitat that could be important for commuting and foraging. The appeal site is not far from water and woodland and there are historical bat records in the wider area. The proposed development would involve significant alterations to the buildings rear roof slope.
However, when assessed against NE’s guidance the appeal building’s roof does not appear to have uneven tiles or noticeable cracks, and the floor plans indicate that it does not have a large roof space for flying. There appeared to be no hanging tiles or timber cladding on south facing walls. When added to the Council ecologist’s advice that bats are unlikely to be present at the appeal site, these site-specific factors are strong indicators that the appeal proposal is not likely to negatively affect bats or their roosts.
Consequently, I conclude on this main issue that the appeal proposal is unlikely to harm bat species and therefore it would be consistent with BLP Policy NR2 insofar as it requires development proposals to, amongst others, avoid impacts on protected species and species of principle importance2, and Framework paragraph 192 insofar as it seeks the protection of priority species.
Section 07
Other Matters
The planning system is mainly concerned with the development of land in the public interest. The requirement for additional living space to meet the personal accommodation needs of the appellant and family are insufficient in this instance to outweigh the proposal’s harmful effects on the character and appearance of the host property and area, and on flood risk, which are matters of significant weight in the public interest. Furthermore, the appeal proposal’s harmful effects would likely remain long after the appellant’s personal requirements cease to apply.
The Council’s finding of an absence of harm in all other respects, including to any listed building or conservation area, is a neutral factor that does not weigh in favour or against the proposal, or alter my conclusions on the main issues. 2 Section 41 of the Natural Environment and Rural Communities Act 2006
Section 08
Conclusion
For the reasons given above, the appeal proposal would result in harmful effects and policy conflicts that would bring it into conflict with the development plan as a whole. There are no material considerations of sufficient weight to outweigh the conflict with the development plan. Consequently, the proposed development is not acceptable, and the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3654No official casework-database value to compare
- Extracted decision date · page 1
- 8 August 2025Matches the official casework database
- Extracted site visit dates
- 28 July 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3355179
- Application reference
- 24/01726
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Windsor and Maidenhead
- Planning authority code
- E06000040
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 25 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 November 2024
- Valid date
- 7 November 2024
- Start date
- 4 December 2024
- Planning authority decision date
- 10 September 2024
- Appeal decision date
- 8 August 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 74402
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21