Skip to main content
Official casework recordAllowedCurrent release

Appeal 3355310

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

two-storey rear extension, side dormer window, alterations to retaining wall.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for two-storey rear extension, side dormer window, alterations to retaining wall at [site address] , Wheathampstead, Hertfordshire [postcode] in accordance with the terms of the application Ref 5/23/2123 subject to the conditions in the attached schedule.

  2. Section 03

    Preliminary Matters

    The appeal property is a [name] listed building and the proposal is the subject of a separate listed building consent. This is dealt with in further detail below.

  3. Section 04

    [name]

    The main issues are: • whether the proposed development would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • if the proposed development is inappropriate, the effect of the proposal on the openness of the Green Belt; and • if the development is inappropriate, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposed development.

  4. Section 05

    Whether inappropriate development in the Green Belt

    The appeal site is located within the Green Belt. National Green Belt policy in the Framework sets out that inappropriate development is, by definition, harmful to the Green Belt and should not be approved ‘except in very special circumstances.’ There are, however, certain exceptions. One of those, at paragraph 154, is the extension or alteration of a building, provided that it does not result in disproportionate additions over and above the size of the ‘original building’. Policies 1 and 13 of the [site address] District Local Plan Review 2004 (LP) broadly conform to the general thrust of national Green Belt policy in respect of extensions. The Residential Extensions and [name] in the Green Belt Supplementary Planning Guidance (the SPG) gives more detailed guidance. It sets out that increases in cubic content limited to 90-180sqm or an increase in floorspace of 20-40% may be acceptable subject to performance against other criteria.

    The definition of original building in the Framework is set out as ‘a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally.’ The SPG, at 7.1 (ii) sets out that existing garages and outbuildings can be included as part of the original floorspace if they were built at the same time (or existed on 1 July 1948) and are integral to the original dwelling. There was doubt under the previous appeal1 as to whether the existing outbuildings could reasonably be considered to form part of the original floorspace. The appeal effectively fell on this point.

    However, further information has been provided in support of the current appeal scheme, including a breakdown of the floorspace for each historic outbuilding and its use. This includes the main farmhouse and nearby outbuildings of two barns, stable block, ancillary building and [address]. In total, the cumulative floorspace of these buildings is claimed to measure approximately 588sqm.

    Based on the evidence before me and my observations on site, I have no reason to doubt these figures or the age of the buildings (pre-1948). Based on the layout of the complex of buildings, their direct physical and visual relationship with the farmhouse and their existing ancillary uses (storage, games room and guest accommodation), I am satisfied that they currently form outbuildings which are integral to the main house, and which could reasonably be included as original floorspace. In particular, there is no substantive evidence before me to demonstrate that [address] is used as a separate dwelling. This is set within the main farmyard and is accessed via the same private drive and gateway as the farmhouse and wider complex. There are no other indicators which would lead me to conclude that this, or any other outbuildings, are used by anyone other than those connected with the main dwelling.

    Therefore, while the extent of accommodation across the site is generous, I accept the appellant’s figures which conclude that there would be an approximately 47% increase in floorspace when taking into account original floorspace and previous and proposed extensions. I am aware that this figure exceeds the guidance set out within the SPG. However, this would be only marginally over those figures and given that this is guidance (clearly stated as such within the SPG), I am of the view that the proposed scheme could, in this instance, be described as a proportionate addition to the original building.

    The Council argues that no details of the existing pool house have been provided. I acknowledge this and have considered whether it should be included within figures for previous extensions, having been built later than 1948. However, I note 1 APP/B1930/W/20/3256314 that the guidance at Table 3 of the SPG specifies that garages and outbuildings within 5m of the original dwelling will be classed as an extension. As the distance between the main dwelling and the pool house exceeds that distance, I do not consider that the pool house could reasonably be considered a previous extension for the purpose of these Green Belt calculations. Its existence has, therefore, not changed my conclusion on this main issue.

    The proposed extension would result in the loss of a mature cherry tree at the site. However, the reason for refusal does not specifically refer to the effect on character or appearance or trees. Moreover, the previous inspector acknowledged the loss of this tree, noting the retention of the site’s extensive trees and planting overall. I concur with this, and it has not lead me to an alternative position.

    Overall, I conclude that the development is not inappropriate development in the Green Belt. The proposed development would therefore accord with paragraph 154 of the Framework and the relevant provisions of [name] 1 and 13 and the SPG which, in summary, seek to protect the Green Belt from inappropriate development.

  5. Section 06

    Other Matters

    The development relates to a [name] listed building, [name]. Mindful of the statutory duty set out in sections 16(2) and 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, I have had special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses. Given the location, design and extent of the development, I consider that it would preserve the special interest and significance of the listed building. I note the Council had no concerns in this regard either and that a separate listed building consent has been obtained.

  6. Section 07

    Conditions

    The Council has suggested a set of conditions in the event that the appeal is allowed. In imposing conditions, I have had regard to the tests within the Framework and the Planning Practice Guidance, and have accordingly amended the wording of certain conditions proposed by the Council without altering their aim.

    In addition to the standard time limit condition, I have imposed a condition requiring compliance with the relevant plans. This is imposed in the interests of certainty. I have imposed a condition requiring detail and samples of the proposed external materials. This is necessary in the interests of certainty and character and appearance. This is pre-commencement for certainty and to ensure that materials are properly designed in prior to the commencement of development.

  7. Section 08

    Conclusion

    For the above reasons, having had regard to all matters raised, I conclude that the development accords with the development plan as a whole and therefore the appeal should be allowed.

  8. Section 09

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing numbers: NA-23039-PL-100 (site location and block plan); NA- 23039-PL-200 (existing and proposed plans); NA-23039-PL-300 (existing and proposed elevations and site photos).

    No development shall take place until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The details shall include roof materials, rainwater goods and mortar type. The development shall be carried out in accordance with the approved details.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 325No official casework-database value to compare
    Extracted decision date · page 1
    30 July 2025Matches the official casework database
    Extracted site visit dates
    8 July 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3355310
Application reference
5/23/2123. DC.4
Lead case reference
Not recorded
Planning authority
St Albans City Council
Planning authority code
E07000240

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
40 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
11 November 2024
Valid date
18 November 2024
Start date
25 November 2024
Planning authority decision date
18 October 2024
Appeal decision date
30 July 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
73831
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21