Appeal 3355450
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as: The proposed is a single storey extension that will be used as a kitchen and dining area. It will be built in keeping with the materials used for the original house and will span 5m back from the original house. a single storey extension that will be used as a kitchen and dining area. It will be built in keeping with the materials used for the original house and will span 5m back from the original house.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
Although a site visit was arranged, no one was available to allow me access into the property at the time. Irrespective, this appeal largely turns on the evidence before me. Therefore, I have proceeded with the appeal on this basis.
Section 04
Background and Main Issue
Article 3(1) and Schedule 2, Part 1, Class A of the GPDO, grants planning permission for the enlargement, improvement or other alteration of a dwellinghouse, subject to certain conditions, limitations or restrictions.
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) of the GPDO but is allowed by paragraph A.1(g) to Part 1(larger home extension), paragraph A.4(3) provides that the local planning authority (‘LPA’) may refuse the application where it considers that the proposed development does not comply, or that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the conditions, limitations or restrictions that are applicable to such permitted development.
There is nothing to suggest that the proposed development would not meet the criteria at GPDO paragraphs A1. (a), (b), (c), (d), (e), (h), (i) and (k). At 5m long the proposal would exceed the limits in GPDO paragraph A.1.(f), but not those at paragraph A.1.(g). In such circumstances, where any owner or occupier of any adjoining premises objects to the proposed development, the prior approval of the LPA is required as to the scheme’s impact on any adjoining premises’ amenity.
[name].4(7) to Part 1 of the GPDO, requires the LPA to assess the impact of the proposed development on the amenity of all adjoining premises, taking into account any representations received. In this case, whilst a neighbour has suggested that the utility room is not part of the original dwellinghouse, the LPA has confirmed that no objections with regard to the impact of the proposal on neighbour amenity was received from the owner or occupants of adjoining premises within the statutory 21-day consultation period.
However, [name].1(g) of the GPDO, requires that the enlarged part of the dwellinghouse would have a single storey and (i) extend beyond the rear wall of the original dwellinghouse by more than 8 metres in the case of a detached dwellinghouse, or 6 metres in the case of any other dwellinghouse.
In this case, the LPA is of the opinion that the original rear elevation of the appeal property is in part recessed, which has been infilled with a utility room, which is not part of the original dwellinghouse. Therefore, the proposed extension would extend more than 5m beyond the rear wall of the original dwellinghouse and does not benefit from permitted development.
Accordingly, the main issue is whether the proposed development is permitted under Schedule 2, Part 1, Class A of the GPDO.
Section 05
Reasons
The original dwellinghouse is defined in the GPDO as the house as it existed on 1st July 1948 or if built after this date, when it was originally built. In this case, neither party has provided me with any indication of when the dwellinghouse was built.
The appeal property is a mid-terrace, period dwellinghouse, which is part of a block of four (numbers 14,16,18 and 20). There is an adjacent, similar block of four dwellinghouses. These are all double-fronted, two-storey properties.
The appellant has provided some evidence in support of the appeal. This includes a single image from historic mapping for a period between 1955 -1980. Based on this it would appear that the dwellinghouses [address], incorporate a similar rear elevation which is in part recessed. However, the two central properties within each block incorporate an infill element, which includes the appeal property and [address]. Even so, the footprint of the infill element does not reflect what is shown on the existing drawing of the appeal property.
The more recent aerial photography image from 2004/2005 also appear to show an infill element to the rear elevation of the appeal property. On the aerial image from 1999/2000 because of the blue shading used to identify the appeal property, it is difficult to ascertain if the rear infill element exists.
Even if I were to accept the appellant’s position that the 1999/2000 aerial photography image also shows the utility room and that there are no images without the utility room, the above evidence is inconclusive as to whether or not the utility room was part of the original dwellinghouse. In particular, because the submitted evidence does not provide any certainty over when the appeal property was originally built.
Section 06
Conclusion
For the above reasons, I cannot be certain that the proposal would be permitted development under Schedule 2, Part 1, Class A of the GPDO. Therefore, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 196No official casework-database value to compare
- Extracted decision date · page 1
- 7 July 2025Matches the official casework database
- Extracted site visit dates
- 24 June 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3355450
- Application reference
- P24/S2890/PDH
- Lead case reference
- Not recorded
- Planning authority
- South Oxfordshire District Council
- Planning authority code
- E07000179
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 18 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 November 2024
- Valid date
- 12 November 2024
- Start date
- 2 December 2024
- Planning authority decision date
- 23 October 2024
- Appeal decision date
- 7 July 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 72441
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21