Appeal 3355604
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as front and rear dormer extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I noted from the appeal evidence that the proposed development has already been constructed, which was confirmed by my site visit observations. The development has largely been completed in-line with the submitted plans.
The description of development set out in the banner heading above has been amended from that on the application form and Wigan Metropolitan Borough Council’s (the Council) official decision notice to remove the words ‘retrospective’ and ‘retention of’, which do not constitute acts of development.
Two representations, from interested parties during the planning application process, were submitted by the Council alongside their appeal questionnaire, which had the writers’ addresses redacted. The Council was unable to provide the appellant with copies of the unredacted versions due to their data protection policy, and therefore in the interests of fairness, I have not had sight of the representations and cannot take their contents into consideration in the determination of this appeal.
Section 04
Main Issue
The main issue is the effect of the proposed dormers on the character and appearance of the property and the surrounding area.
Section 05
Reasons
[address] is a residential cul-de-sac predominantly comprising semi-detached traditional style bungalows with hipped roofs. Some of the bungalows have been retrofitted with dormer windows to the front and/or rear, which are of varying styles, sizes and materials. However, the prevailing design is of dormers that sit either on the ridgeline or just below it, and dormers that either do not project beyond the side roof slope or sit only marginally beyond it. Many of the bungalows on [address] have not had dormers installed at all and retain their hipped roof design in full, which contribute positively to the overall character and appearance of the area.
Front and rear dormers have been installed at No [site address] (No 23), which are the subject of this appeal. The dormers extend above the ridgeline of the original roof, and in terms of width, extend across a large proportion of the side roof slope. They create a continuous flat roof that extends across the length of the dormers. Single windows have been installed in both the front and rear dormers. Mid-brown coloured cladding has been utilised, with white windows, fascia boards, and guttering.
The dormers at No 23 are large in scale, both in terms of width and height. They extend across a large proportion of the original roof, undermining the existing hipped roof design that is prevalent and contributes to the character and appearance of the area. The extension of the dormers across much of the side roof slope, together with the large expanse of flat roof, create a box shape that dominates and unbalances the property, especially when seen in the context of the adjacent semi-detached property. Its dominance is most acutely observed from the side when viewed from [address].
The appellant asserts that the materials used align with neighbouring properties. I acknowledge that existing dormers on [address] utilise a range of materials. However, the use of mid-brown coloured cladding as the main external material appears at odds with the property itself, against the existing light-coloured roof tiles, having the effect of accentuating the dormers’ dominance over the property and the street scene.
The dormer windows appear at odds with the alignment of the windows at ground floor level, both to the front and rear of the property, which has resulted in a conflicted elevational design to the detriment of the appearance of the property and the surrounding area.
For the reasons set out above, I find significant harm to the character and appearance of the property and area, contrary to policy CP10 of the Wigan Local Plan Core Strategy (2013) and policy JP-P1 of the Places for Everyone Joint Development Plan Document for, amongst other locations, Wigan (2024). These policies seek to improve the built environment by, amongst other matters, ensuring development respects and acknowledges the character and identity of the locality, and integrates effectively with its surroundings.
Section 06
Other Matters
I have had careful regard to the appellant’s personal circumstances. Whilst it is understandable that there has been a desire to alter the property resulting from the health issues experienced by a member of the household, no evidence has been presented to demonstrate that a dormer extension of this nature is required. I have found that there is significant harm to the character and appearance of the area, which outweighs the personal considerations put forward.
The appellant’s evidence refers to the conduct of the Council during the planning application process. However, this is not a matter for my deliberation in the context of a planning appeal.
The development’s compliance with Building Regulations has been forwarded as a benefit of the proposed development in evidencing the contribution of the dormers to a safe and functional family home environment. Whilst this may be the case, this is not a matter for consideration in the context of a planning appeal and I have based my decision on the planning merits of the scheme.
Section 07
Conclusion
The proposal conflicts with the development plan taken as a whole, and the material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 10No official casework-database value to compare
- Extracted decision date · page 1
- 11 March 2025Matches the official casework database
- Extracted site visit dates
- 24 February 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3355604
- Application reference
- A/24/97239/RET
- Lead case reference
- Not recorded
- Planning authority
- Wigan Metropolitan Borough Council
- Planning authority code
- E08000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 14 November 2024
- Valid date
- 14 November 2024
- Start date
- 4 December 2024
- Planning authority decision date
- 31 October 2024
- Appeal decision date
- 11 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 66020
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21