Appeal 3355857
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the installation of solar panels to the front (west elevation).
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character or appearance of the Lympstone Conservation Area.
Section 04
Reasons
The Officer’s Report on the appeal application explains that the appeal dwelling is a semi-detached two storey dwelling situated in the village of Lympstone, with its principal elevation facing west. Although solar panels have been approved on the roof slopes of neighbouring properties, including Nos. 4, 6 and [address], these are not the principal elevations and would not be highly visible when seen from public vantage points. I note that this is disputed by the appellant.
On my visit I saw that the appeal dwelling is one of four buildings along the northern boundary of the recent [address] development of ten houses on the site of a former nursery. The development is essentially of a contemporary design with a notable consistency of built form and external materials that give it a distinctive character and appearance.
The northern gable and principal (western) elevation of No. 1 are prominent in public views from [address] and the adjoining green space. The latter includes a public footpath that runs from the church grounds and joins the access road for the development at the corner of the dwelling’s north and west elevations. And although it recedes southwards, the large western roof plane of No. 1 can clearly be seen in both long and short views along [address] and the adjoining open green space.
As mentioned in paragraph 3 above, solar panels have already been approved on other houses at [address] and as a contemporary feature in a modern development they are to some extent in keeping with their context. However, the appeal application plans shows two rows of panels, totalling 22 in all, across effectively the full length of the roof and about three quarters of its depth.
I consider that a solar panel display of this intensity would draw the eye in both the long and short views from outside the area of the development as referred to above. And although the visual impact of the installation of solar panels is subjective, I find that in this case with the great majority of roof covered in such a prominent location they would be harmful to the character and appearance of the conservation area, with the harm caused amounting to ‘less than substantial’. There would therefore be conflict with Strategy 39 and Policy E10 of the East Devon Local Plan 2013-2031 adopted in 2016 and with Government policy in Section 16: ‘Conserving and Enhancing the [name] of the National Planning Policy Framework (‘the Framework’) revised in December 2024. I see no reason to alter this view on the basis of the prominence or otherwise of the installations of solar panels with the Council’s approval at Nos. 4, 6 and [address] as I have made an individual appraisal on the impact of the appeal scheme.
The conservation area is a designated heritage asset and paragraph 215 of the revised Framework says that where a development will lead to less than substantial harm to the significance of a designated heritage asset, this harm should be weighed against the public benefits of the proposal. In this instance the main benefit is a private one for the appellant in the form of reduced energy costs.
However, there is also a public benefit as regards renewable energy and I have noted the appellant’s calculations that the proposed installation on the western roof slope is the most efficient. I am also aware of the energy policy of the Government to promote renewable provision of supply and that solar panels on domestic roofs will in aggregate make an important contribution towards this objective. Nonetheless, my conclusion in this particular case is that the incremental public benefit of solar energy at the appeal dwelling would not outweigh the harm caused to the character and appearance of the conservation area.
The appeal therefore fails.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 204No official casework-database value to compare
- Extracted decision date · page 1
- 21 February 2025Matches the official casework database
- Extracted site visit dates
- 21 January 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3355857
- Application reference
- 24/1359/FUL
- Lead case reference
- Not recorded
- Planning authority
- East Devon District Council
- Planning authority code
- E07000040
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Yes
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 November 2024
- Valid date
- 20 November 2024
- Start date
- 3 December 2024
- Planning authority decision date
- 2 October 2024
- Appeal decision date
- 21 February 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 65041
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21