Appeal 3356673
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
retention of boundary wall with associated piers and gates to front and sides of property.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
I saw on my site visit that the development has already commenced and appears to have been completed. Planning permission is therefore sought on a retrospective basis and I have made my recommendation on that basis.
I have taken the site address from the Council’s Decision Notice as it is clear in the evidence and from my observations that the development relates to two properties.
Section 05
Main Issue
The main issue is the effect of the development on the character and appearance of the area.
Section 06
Reasons for the Recommendation
The site is located on the corner of [address] and [address]. [address] consists of mostly two storey terraced properties which are setback from the street by modest front gardens. The front boundary treatments are predominantly formed of low brick walls of narrow depth with railings which are unobtrusive in their appearance. The low brick walls are more often of a dark red colour which generally matches the colour of the brickwork at the ground floor of the dwellings that they are associated with. This creates a pleasant degree of uniformity which positively contributes to the character and appearance of the area.
The properties combined have a wide frontage, and the boundary wall spans the full length of the front boundary. Its height and thickness appear noticeably bulkier and more dominant than the generally more modest and streamlined walls on the street. This is emphasised by the tall, deep side profile of the rendered columns. The materials, including cream rendered pillars with accompanying stone spheres, are not complementary to the host dwelling or the wider street scene. The development does not therefore reflect the form, details or materials of typical front boundary treatments along [address] and is an incongruous feature in the street, lacking visual permeability when viewed in the wider context of the surrounding boundary treatments.
It is noted that the appellant could paint the wall without the need for planning permission. However, regardless of this, the height, scale, design, and lack of cohesion with the surrounding boundary treatments causes harm to the character and appearance of the area.
It is in dispute between the parties whether the boundary creates a hostile appearance. Having regard to the [name] definition, I have taken hostile to mean ‘unfriendly’. Given the overall height, scale, length and design of the boundary it appears overly defensive and unwelcoming. For these reasons, I therefore agree with the Council that it appears hostile.
In conclusion, the development is harmful to the character and appearance of the area. Accordingly, the development is contrary to Policies D1, D2 and D6 of the Salford Local Plan: Development Management Policies and Designations (2023) which seeks, among other matters, for development to protect, enhance and respond to any positive character and distinctiveness of an area.
It is also contrary to the National Planning Policy Framework (the Framework) which requires development to be visually attractive and add to the overall quality of the area.
Section 07
Other Matters
The appellant contends that the development does not require planning permission due to the passage of time. However, it is not within the confines of this appeal, under S78 of the Act1 for me to determine the lawfulness of the development or otherwise. The appeal follows a planning application specifically seeking planning permission and I have considered it on that basis. There are other mechanisms available to the appellant to establish lawfulness for the reasons they have set out.
The appellant also refers to a fallback position of erecting a wall within the allowances of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Specifically, Schedule 2, Part 2, Class A. As the appeal development exceeds the height of the previous boundary treatment and is over 1 metre in height adjacent to a highway, there is no directly comparable fallback using permitted development rights. I therefore give this limited weight in the appeal.
The appellant outlines the benefits of the development to them, such as an increase in privacy and security. I also note that letters of support have been received. However, these benefits and the matters raised in support for the 1 Town and Country Planning Act 1990 development are not sufficient to outweigh the harm that I have identified in relation to the main issue.
I have also had regard to the appellant’s submission that there are no objections to the development, including from the Council’s Highways Department. However, the absence of objections does not preclude a full and proper assessment of the planning merits of the case and does not outweigh the harm I have identified in regard to the main issue.
Section 08
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 22 May 2025Matches the official casework database
- Extracted site visit dates
- 4 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3356673
- Application reference
- PA/2024/1068
- Lead case reference
- Not recorded
- Planning authority
- Salford City Council
- Planning authority code
- E08000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Not Applicable
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 3 December 2024
- Valid date
- 18 December 2024
- Start date
- 21 January 2025
- Planning authority decision date
- 5 September 2024
- Appeal decision date
- 22 May 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 69856
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21