Appeal 3356792
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
Since the determination of the application the National Planning Policy Framework (2023) has been superseded by the National Planning Policy Framework (2024) (the Framework). However, in relation to this appeal the aims of both sets of policies are similar. No party would be prejudiced or caused any injustice by me proceeding with the appeal in light of this change in policy.
Section 04
Main Issue
The main issue in this appeal is the effect of the proposed development on the living conditions of occupiers of No. [address].
Section 05
Reasons
The Birmingham Design Guide, [name] (2022) sets out in [name] 13 that developments must ensure they do not have an unacceptable impact on the amenity, outlook or privacy of existing or new residential properties. [name] 13 confirms that details of the 45 [name] are presented in City Note LW-4 of the [name], [name] and [name] (2022).
Based on LW-4 the point to apply the 45 [name] should be taken from the mid-point of the nearest ground floor habitable room window. [name] 13 and LW-4 highlight that the Code will be applied to any proposed extension. However, exceptions to these standards will be considered on a case by case basis.
The proposed development would be located along the shared boundary with No. 45, as the built form would be to the north this would limit to a degree the amount of overshadowing created. A timber fence exists between properties which the appellant confirms is between 1.8-2m in height the proposed development would extend above this by 1-1.2m for approximately 4m, I find that this would be overbearing in terms of outlook for the occupiers of No. 45.
I understand from the Council that No. [address] nearest habitable room is served by a window to the front as well as the rear. Given the depth of the room the existence of the dual aspect and the outlook the proposed development would create does not persuade me that the proposed development should be an exception to the 45 [name].
I find that the proposed development would harm the living conditions of occupiers of No. [address].
There is conflict with Policy PG3 of the Birmingham Development Plan (2017) and Policies DM2 and DM10 of the Birmingham Development Plan Document (2021) which amongst other things seeks to protect the amenity of neighbours.
There is also conflict with the Framework which seeks to ensure developments have high standards of amenity for existing and future users.
Section 06
Other Matters
The appellant contends that a larger development could be progressed under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) prior notification route. The appellant highlights that as neighbours have not objected to the appeal proposal this would suggest that prior approval for a 4 metre deep rear extension may not have been required. Whilst this maybe the case I have not been provided with substantive evidence to confirm that the prior notification route is available to the appellant or that the neighbours would not object to a prior notification scheme. Therefore, I cannot be sure that this is a reasonable fallback position. I therefore give this limited weight.
Conclusion
For the above reasons I conclude that this appeal should dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 126No official casework-database value to compare
- Extracted decision date · page 1
- 31 January 2025Matches the official casework database
- Extracted site visit dates
- 19 January 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3356792
- Application reference
- 2024/04338/PA
- Lead case reference
- Not recorded
- Planning authority
- Birmingham City Council
- Planning authority code
- E08000025
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 3 December 2024
- Valid date
- 3 December 2024
- Start date
- 13 December 2024
- Planning authority decision date
- 20 September 2024
- Appeal decision date
- 31 January 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 63871
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21