Appeal 3356880
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single-storey front extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matters
The appeal site is located in the Green Belt. Planning law requires that applications for planning permission be determined in accordance with the development plan, unless material considerations indicate otherwise. The development plan includes the Wirral Unitary Development Plan (UDP).
The National Planning Policy Framework (the Framework) is a material consideration in planning decisions. The version of the Framework published in December 2024 does not materially differ from the previous version, insofar as the planning policies around the main issues in this appeal are concerned.
The Council’s Supplementary Planning Guidance 11: [name] (SPG11) is also a material consideration, as is the emerging Wirral Local Plan (WLP). The WLP is at a very advanced stage in its progress to adoption and so weight can be given to its policies and strategy.
Section 04
Main issues
Flowing from the reason for refusal on the decision notice, the main issues are: (i) Whether the proposal would amount to inappropriate development in the Green Belt; and (ii) If the development would be inappropriate in the Green Belt, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.
Section 05
Whether the proposal would amount to inappropriate development in the Green Belt
Section 13 of the Framework, titled Protecting Green Belt land, explains that the Government attaches great importance to Green Belts. The fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence.
The Framework goes on to say that development in the Green Belt is inappropriate unless one of the listed exceptions applies. The exception at paragraph 154 (c) allows for the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. As the appellant notes, the WLP simply seeks to follow national policy for the Green Belt.
The Framework and the WLP have no definition, volumetric or otherwise, as to what would amount to disproportionate additions. In this scenario, it would be a matter of planning judgement in each case based on the key question of whether the sum total of existing and proposed extensions to the original building would be disproportionate in size to it. It could follow that a small extension could represent a disproportionate addition if the original building has previously been extended.
UDP Policy GB5, relating to the extension of existing dwellings in the Green Belt, states that such extensions will be permitted ‘...provided that the floorspace of the resultant dwelling is no more than 50% larger than that of the habitable floorspace of the original dwelling, and subject also to the enlarged dwelling not having a harmful visual impact on its surroundings.’ This is repeated as a general principle in SPG11 and follows the broad approach in the Framework whilst also adding to it. UDP Policy GB5 is not therefore inconsistent with the Framework.
[site address] is a substantial detached 2-storey house with single-storey wings to the front/northern flank and to the rear. It is reasonable to look at the increase in size in terms of floorspace as the Council has done. The Council considers that the original dwelling has a baseline floor area of 280 sqm and that additions to it (the space now occupied by the games room, gym, swimming pool and conservatory) of 318 sqm already considerably exceed the 50% limit included in UDP Policy GB5. In fact, they represent an increase of 113.6%. The appeal proposal would add about 24 sqm, so that the percentage increase over the original dwelling would end up at about 122%. The Council’s calculations are not disputed by the appellant.
I accept that the proposed single-storey front extension would be small in size in itself, fit neatly between 4 sections of house walling that surround a gated front yard, be built over an existing area of paving stones and not exceed the height of the buildings to which it would be adjoined. It would also be set well back from the road, being hidden from it and other vantage points. The design and position of the proposed extension within the existing setting would be favourable. Still, focussing just on these considerations would deflect from the correct approach which is to consider all cumulative increases in size from the original dwelling over time.
It is my planning judgement that given the sheer size of the previous extensions, the proposal would unacceptably consolidate an already significant cumulative increase compared to the size of the original building. Additions which more than 2 double the floorspace of the original building are and would be wholly disproportionate on a numerical basis. In physical terms, the sprawling extent of the later extensions is notable and the increase in floorspace arising from the subject front extension would result in even greater bulk to the side and front of the original building being apparent to observers as they enter the site from [site address] .
I find that the proposed extension would result in disproportionate additions over and above the size of the original building. The proposal would therefore amount to inappropriate development in the Green Belt and conflict with UDP Policy GB5, SPG11, the WLP and the Framework. Yet, given its design and position within the existing setting, the proposed extension would not conflict with any of the Green Belt purposes listed in the Framework and the direct loss of openness caused by it in spatial and visual terms would be limited.
Section 06
Other considerations
Believing that the modest addition being proposed to the dwelling should not be considered disproportionate for the factors put forward in paragraph 11 above, the appellant, understandably, did not specifically list any other considerations in support of the proposal that might have amounted to the very special circumstances required to justify the proposal.
Nevertheless, the extension would clearly be beneficial in enlarging and reconfiguring the ground floor kitchen/utility space. This is a private benefit to which I afford only limited weight.
There were no objections to the scheme in terms of its design and visual appearance or its impact on neighbouring amenities. However, achieving well-designed places is an expectation for all development and so these aspects of the scheme do not count positively in its favour.
The application did not attract any objections from neighbours or community groups but this is a neutral factor weighing neither for nor against the proposal.
I have read the emails submitted with the appellant’s statement of case. The erroneous advice provided by the Council’s officer in relation to the likely positive outcome of the planning application the subject of this appeal will have been a source of frustration for the appellant but he recognises that it does not form grounds for appeal. Such advice is given informally without prejudice to any future application and does not have the weight of a previous planning permission.
Section 07
Whether very special circumstances exist
Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. The Framework confirms that very special circumstances will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.
The proposal would be inappropriate development in the Green Belt. In accordance with the Framework, substantial weight should be given to any harm to the Green Belt. Even taken together, the other considerations I have identified in the appellant’s submissions offer only moderate support for the scheme and do not 3 clearly outweigh the harm. Consequently, the very special circumstances necessary to justify the development do not exist.
Section 08
Final balance and conclusion
The proposed development conflicts with the development plan, the Framework and the WLP and there are no other material considerations to outweigh that finding. Therefore, for the reasons given and taking into account all other matters raised, I conclude that this appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 807No official casework-database value to compare
- Extracted decision date · page 1
- 26 March 2025Matches the official casework database
- Extracted site visit dates
- 17 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3356880
- Application reference
- APPH/24/01185
- Lead case reference
- Not recorded
- Planning authority
- Wirral Metropolitan Borough Council
- Planning authority code
- E08000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 24 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 December 2024
- Valid date
- 5 December 2024
- Start date
- 7 January 2025
- Planning authority decision date
- 13 November 2024
- Appeal decision date
- 26 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 66924
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21