Appeal 3356985
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as “retrospective single storey rear extension - change in material of existing extension”.
Section 02
Decision
The appeal is allowed and planning permission is granted for a single storey rear extension with change in materials to existing extension at [site address] in accordance with the terms of the application, Ref 24/03005/HOU, and the following conditions:
The development hereby permitted shall be carried out in accordance with drawing nos A24-69-01 – Existing and [name] and Elevations and A24-69-01a – Existing and [name] and Elevations.
The extension hereby permitted shall be demolished to ground level and all materials resulting from the demolition shall be removed within 90 days of the date of failure to meet the following requirement set out below: i) Within 6 months of the date of this decision, the external walls of the development hereby permitted that have not already been finished in the proposed materials shown on drawing nos A24-69-01 – Existing and [name] and Elevations and A24-69-01a – Existing and [name] and Elevations shall be finished in the proposed materials shown on the approved plans. The development shall be carried out and completed in accordance with the approved plans and shall thereafter be retained. In the event of a legal challenge to this decision, or to a decision made pursuant to the procedure set out in this condition, the operation of the time limits specified in this condition will be suspended until that legal challenge has been finally determined.
Section 03
Preliminary Matters
The description of development in the banner heading above is taken from the description that is provided on the application form. I have omitted wording in my formal decision that is not a description of development.
I noted at the site visit that a single storey extension has already been constructed to the rear of the property. It is clear from the plans and evidence that this is the structure referenced in the planning application, although not all elevations had been finished in render painted white as shown on the plans. I have dealt with the appeal on the basis that planning permission is being sought retrospectively for the construction of the extension.
Section 04
Main Issue
The main issue is the effect of the extension on the living conditions of the occupiers of neighbouring properties, with particular reference to outlook, daylight and sunlight.
Section 05
Reasons
The appeal property is a two storey, terraced dwelling in a predominantly residential area. The extension has been constructed within the rear garden of the property, which is enclosed by timber fencing to both sides with its adjoining neighbours. Timber sheds are located to the rear boundary, beyond which is the blank gable wall of a neighbouring property and a shared pedestrian access to rear gardens.
The extension has been built off the rear wall of an existing single storey, flat roof offshoot. There are a variety of single storey extensions to the rear of the properties within the terrace. These include flat roof additions to the adjoining dwellings at Nos 337 and [address], which do not project as far from the rear elevation of the dwellings compared to the overall extent of the appeal proposal. I noted that there was a smaller lean-to offshoot to the rear of No [address] to the boundary with the appeal property.
The officer report refers to impacts on the adjoining neighbours, and the reason for refusal specifically references No 341. The report also states that there is no extension to the rear of No 341, although I noted that a flat roof extension has been constructed to the rear of that property, which projects a similar depth to other flat roof additions in the terrace. I do not know the circumstances under which that and other extensions were constructed or their status with regard to planning permission.
The appellant’s evidence indicates that the extension has replaced a previous structure in the same position. The plans show these to both be of the same scale and form, but the previous structure was a lighter weight construction featuring corrugated plastic roofing and cladding. The extension that has been constructed features UPVC glazed roofing and white painted render.
I note the reference to images indicating how long the previous structure had been in situ and the appellant’s suggestion that it would have been lawful due to the passage of time. The evidence does not include reference to any lawful development certificate to that effect. However, whilst I have assessed the appeal proposal on its own merits, I have had regard to the previous structure in my assessment and the impact of the change in construction materials. This includes the possibility of greater impacts on the living conditions for the neighbouring properties over and above the effects of the structure that has been replaced.
Despite the overall extent of the combined projection from the rear wall of the dwelling alongside the flat roof offshoot, as well as the more solid materials compared to the previous structure, the development is a relatively modest addition to the property due to its overall footprint, scale and the shallow roof that is set lower than the flat roof extension that it extends from. The overall scale and roof design of the development reduce its effects on neighbouring properties given the layout of development to either side and relationship with window openings.
I observed that the smaller offshoot of No 341 does not have a window, although there is an opening close to the boundary with No 337 and a retractable awning is attached above that. The extension that has been constructed to the rear of No 341 and the position of openings within that, which are set away from the boundary, limits the impact on outlook to that property. The extent of new built form along the boundary is therefore relatively modest in this context. Although the change in materials compared to the previous structure creates a more solid built form on the boundaries, the development is not of such a scale or bulk overall to be a significantly overbearing addition, or that has a detrimental loss of outlook for either of the adjoining properties.
With regard to light, the officer report refers to the extension infringing on a 45-degree angle for both of the adjoining properties. It notes that it exceeds the recommended depth by 0.5m to No 337 and that property would be able to access daylight and sunlight. The Council appear to raise greater concern with the impact on No 341 and states there is also an overbearing impact for that property. However, for the reasons set out above in terms of there being no opening close to the boundary and the position of its existing extension, the effect of the proposal on daylight and sunlight to that property is also limited. I have not been provided with any technical assessment that demonstrates the impact of the proposal in this respect. However, in the context of the previous structure, and despite the change in materials that will likely have had some greater impact, I do not consider that the extension has resulted in a significant and harmful loss of daylight or sunlight to the occupiers of both properties.
I conclude that the development is not harmful to the living conditions of the occupants of neighbouring properties. Therefore, the development does not conflict with Policies D3, D4 and D5 of The London Plan, The Spatial Development Strategy for [name] (2021) (the LP), Policy CP30 of The Enfield Plan Core Strategy 2010-2025 (the CS) and Policies DMD6, DMD8, DMD10 and DMD37 of the Improving Enfield Development Management Document (2014). Amongst other matters, these policies require new development to deliver appropriate outlook and amenity, good design, and provide and preserve amenity in terms of daylight, sunlight and outlook.
The reason for refusal also refers to Policies D6 and D8 of the LP and Policy CP4 of the CS. However, I do not find these to be determinative to the main issue as they relate more specifically to new housing development, housing renewal and the public realm.
Section 06
Conditions
The Council’s questionnaire suggests that conditions relating to the time for development to begin, matching materials and approved plans should be imposed. A time limit condition would not be enforceable given that the development is retrospective. A condition specifying the plans is necessary in the interests of certainty. A condition requiring the materials for the extension to be carried out in accordance with the approved plans is necessary in the interests of the character and appearance of the property and the area.
Section 07
Conclusion
For the above reasons, the proposal would comply with the development plan taken as a whole and material considerations do not indicate a decision should be made other than in accordance with the development plan. I therefore conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 6365No official casework-database value to compare
- Extracted decision date · page 1
- 17 April 2025Matches the official casework database
- Extracted site visit dates
- 25 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3356985
- Application reference
- 24/03005/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 December 2024
- Valid date
- 6 December 2024
- Start date
- 15 January 2025
- Planning authority decision date
- 11 November 2024
- Appeal decision date
- 17 April 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 68236
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21