Appeal 3357007
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single storey rear and side extension.
Section 02
Decision
The appeal is allowed, and planning permission is granted for single storey rear and side extension at [site address] , Knowle, Bristol, [postcode] in accordance with the terms of the application, Ref 24/04004/H, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in strict accordance with the following approved plans: [name]: 4317.PL.01 [name], 4317.PL.02 [name], 4317.PL.04 [name], 4317.PL.06 [name].
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 03
[name]
Subsequent to the refusal of permission for the proposed development the Government published its revised National Planning Policy Framework (the Framework) in December 2024. Further minor amendments were published on 7 February 2025, containing corrections and a clarification. The wording of the relevant paragraphs of the new Framework are similar to that of the 2023 version. Therefore, it has not been necessary to seek comments from the parties on the revised Framework, which I have referred to in my decision.
Section 04
Main Issue
The main issue is the effect of the proposed development upon the living conditions of occupiers of 46 and [address], with particular regard to light and outlook.
Section 05
Reasons
The appeal property is a 2 storey terraced house with a 2 storey rear projecting wing, joined to that of the neighbouring house, No 46, but with a gap between it and the boundary with No 50, the adjoining house on the other side. The rear wings extend slightly further back on the ground floor and have single pitched roofs, and parapet walls where they join with neighbouring wings, as is the case with the appeal property and No 46. The rear wings of all three properties contain a kitchen on the ground floor, which the council’s Supplementary Planning Document - A Guide for [address] Alterations and Extensions (2005) (SPD) identifies as a habitable room.
The proposed extension roof would breach a 45 degree line taken from the centre of the rear facing kitchen window of No 46, thus conflicting with guidance in the SPD and indicating that there would be an impact on outlook from, and light to, its windows. It would also be close to the side kitchen window of No 50 and its utility room window, but the existing rear wing on the appeal property already substantially breaches the 45 degree line for both these windows. Furthermore, the SPD states that the impact of development should be assessed on site, and standards may be relaxed depending on the site’s orientation, the proximity of neighbouring properties and boundary walls, among other things.
The rear of houses in the terrace face north, limiting their access to direct sunlight and resulting in shade at their rear for much of the day, particularly in the winter months when the sun is low. The proposed extension would fill the gap between the rear wing and the boundary with No 50 and wrap around to extend the rear ground floor. No 50’s utility room window is already enclosed on both sides by its rear wing, and that of the appeal site, and the boundary wall between the 2 properties. Consequently, it already has poor outlook and is overshadowed for most of the time. The kitchen window on the side of No 50’s rear wing faces the boundary wall and the appeal property rear wing such that its existing outlook is also poor, and it is similarly overshadowed.
The proposed extension would be higher than the boundary wall and would therefore have a more overbearing presence, particularly from the kitchen side window. However, the kitchen is dual aspect with a second window on the rear elevation. The proposed development would be peripheral in views from this window because of the gap between it and the proposed extension, and it would not breach the 45 degree line. I also note that an extension could potentially be built along the boundary to approximately the same depth as No 50’s kitchen side window under the ‘[name] procedure and would have a similar effect on the outlook from it. In any case, I do not consider that the proposed development would significantly worsen the outlook from, or light to, No 50 such that it would harm the living conditions of its occupants.
The existing rear projections on No 46 and the appeal property are joined and share the same rear building line. The proposed development would replace the existing rear ground floor element with an extension that would project approximately 2m beyond the existing building line and be slightly higher. Given that it would be to the side of the kitchen window of No 46, and its depth, I do not consider it would significantly affect the outlook from it and, as I have noted, the rear of the houses is already overshadowed because of their orientation. There would be some additional overshadowing to the kitchen in the afternoons but not enough to harm the living conditions of occupiers of the house. Also, I note that an extension could be potentially added to the rear wing under permitted development that would have a similar effect on outlook and shade to No 46’s kitchen window.
Therefore, although the proposed scheme does not satisfy the 45 degree test for some windows on neighbouring houses, the site specific circumstances that I have described justify relaxing the standards, which the SPD allows. Overall, I conclude that the proposed development would not conflict with Policy DM30 of the Bristol Local Plan – Site Allocations and Development Management Policies (2014), Policy BSC21 of the Bristol Development Framework Core Strategy (2011), the objectives of the SPD and the Framework which seek to safeguard the amenity of neighbouring occupiers.
Section 06
Conclusion and Conditions
For the reasons given above I conclude that the appeal should be allowed.
I have attached the standard time limit condition and a plans condition as this provides certainty. I have also added a condition concerning materials to ensure a satisfactory appearance.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 128No official casework-database value to compare
- Extracted decision date · page 1
- 20 February 2025Matches the official casework database
- Extracted site visit dates
- 6 February 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3357007
- Application reference
- 24/04004/H
- Lead case reference
- Not recorded
- Planning authority
- Bristol City Council
- Planning authority code
- E06000023
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 18 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 December 2024
- Valid date
- 7 December 2024
- Start date
- 18 December 2024
- Planning authority decision date
- 4 December 2024
- Appeal decision date
- 20 February 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 64944
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21