Appeal 3357202
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first-floor rear extension over existing ground floor kitchen.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have used the description on the planning application form in the banner heading.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the appeal property and the surrounding area.
Section 05
Reasons
The appeal property is a two storey, mid-terrace dwelling, that is located on the southern side of [address]. The rear of the dwelling includes an original two-storey outrigger, which forms part of a pair with a matching outrigger at the adjacent [address], both characterised by pitch roofs. A single storey extension has also been erected.
The dwelling is typical of the development in the surrounding area, with the rear elevations of the wider terrace generally characterised by evenly spaced pairs of two-storey outriggers. These features combine to give the rear elevation of the terrace a strong rhythm, a reasonably uniformed form and pleasant visual balance.
The proposed development would extend the outrigger outwards at first floor level beyond the established first floor rear building line, resulting in a dominant feature disrupting the marked balance and rhythm described above, both in terms of the host building and the surrounding pattern of development.
The proposed flat roof design would not be compatible with the roof form of the existing outrigger, its pair at No. 68, or that prevalent at surrounding properties. The proposed development therefore fails to complement the form and architectural characteristics of the host building and wider terrace, representing a harmful contribution to local character.
Consequently, the extension would not be sympathetic to the host building harming its character. It would appear dominant and look incongruous when viewed from the garden of the appeal property, neighbouring gardens and from public views in [address] and at the entrance to the nearby community garden, harmful to the character and appearance of the area.
I therefore find the proposal would unacceptably harm the character and appearance of the appeal property and the surrounding area. As such, it would conflict with Policy D6 of the London Plan 2021, Policies DM1 and DM12 of the London Borough of Haringey Development Management Development Plan Document 2017 and Policy SP11 of the London Borough of Haringey Local Plan Strategic Policies 2013 which require, amongst other criteria, that extensions or alterations deliver the highest standard of design and respect the form, setting and architectural characteristics of the original building and surrounding context.
Section 06
Other matters
The appellant refers to other first floor extensions within the wider terrace. Whilst a number of outriggers at neighbouring properties do have a deeper rear projection than at the appeal property, these maintain a symmetry of form, are positioned away from the appeal property and are not seen in the same context. These other forms of development do not lead me to a different conclusion.
Section 07
Conclusion
For the reasons given above, I conclude that the proposal would conflict with the development plan and there are no material considerations that indicate that the development should be determined otherwise than in accordance with it. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5558No official casework-database value to compare
- Extracted decision date · page 1
- 3 March 2025Matches the official casework database
- Extracted site visit dates
- 17 February 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3357202
- Application reference
- HGY/2024/2536
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Haringey
- Planning authority code
- E09000014
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 December 2024
- Valid date
- 10 December 2024
- Start date
- 16 January 2025
- Planning authority decision date
- 11 November 2024
- Appeal decision date
- 3 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 65547
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21