Skip to main content
Official casework recordDismissedCurrent release

Appeal 3357501

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

demolition of existing detached garage and garden office. New two- storey side extension and single storey rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The description on the appeal form and the decision notice differs from that on the planning application form which I have quoted above. These state ‘Proposed demolition of existing detached garage and garden office. Construction of detached two-storey building to side with glazed link to farmhouse and single-storey extension to rear of farmhouse. This does not alter the substance of the proposal but clarifies the development proposed. I have assessed the appeal on this basis.

    A revised version of the National Planning Policy Framework (the Framework) was published in December 2024. Any reference to the Framework in this decision is to the most recent version and its new chapter and paragraph numbers.

  3. Section 04

    [name]

    The main issues are the effect of the proposal on: - • the character and appearance of the existing property and the surrounding area; and • protected species, in particular bats.

  4. Section 05

    Character and Appearance

    The appeal site is located within the Forest of Bowland Natural Landscape (formerly Area of Outstanding Natural Beauty) and comprises a detached house and a detached garage together with its gardens and a detached outbuilding in its rear garden, referred to as a garden office. The proposal would replace the detached garage with a two storey building linked to the farmhouse. A single storey extension would also link to the new building. The proposal would extend the existing house providing a new kitchen /dining, utility, WC and staircase to two new en-suite bedrooms.

    The farmhouse and garage are constructed in natural stone under slate roofs. The extension/new building would be faced with stone at its lower level, timber cladding above that, bronze aluminium windows and a black metal roof. The appellant describes the concept behind its design and I appreciate the approach which is intended to reflect a new phase in the farmhouse’s history. It’s design as a separate building with a separate but lightweight link would utilise a palette of materials found in the area, whilst creating a modern addition to the traditional farmhouse. The single storey extension would also follow this concept.

    However, the proposal would be a substantial and over dominant addition to the farmhouse. Whilst the single storey extension would be to the rear of the house and so less obvious from outside the site, the new building would be disproportionate to the house, adding a large and incongruous extension that would be at odds with the traditional scale and form of the farmhouse. [name] appreciate the concept of a modern addition, the height, massing and overall scale of the new building would diminish the character and appearance of the original house.

    I saw the arrangement of buildings at [address] on the opposite side of the road. However, the arrangement of buildings, including the relationship between the stone farmhouse and the timber agricultural building set at right angles to it, differ in that the complex of buildings opposite relate to a farm and the buildings are functional agricultural ones whereas the appeal site is domestic. There is no apparent relationship between [address] and [address], although there may have been in the past, therefore, reflecting the scale and proportions for this domestic extension would not respect the character and appearance of the appeal house as it stands today.

    Furthermore, the appellant states that the proposal would represent a 24% increase in the size of the dwelling, although this is not substantial in the context of the appeal site overall, it is based on the footprint of the existing house, garage and garden office. This does not take into account that the proposed new building would be considerably taller than the existing garage and therefore its impact so much greater. Moreover, due to its bulk and massing and overdominance, I do not consider that the proposal would be of a design that would be truly outstanding or innovative, as suggested by Paragraph 139 of the Framework.

    Turning to the wider area, the site is within an area designated as a National Landscape, where in paragraph 189, the Framework establishes that great weight should be given to conserving and enhancing landscapes and scenic beauty. The topography in the area is that of rolling hills, and the proposal would be seen against a backdrop of rising land. However, the appeal site is on a higher level than the road and the farm opposite and although the new building would be set back from the front of the house, it would be highly visible and prominent due to its scale and massing. The single storey extension would not have the same impact on the wider landscape but the development overall would.

    Consequently, the proposal would have a harmful effect on the existing property and the character and appearance of the surrounding area. This would conflict with Core Strategy1 [name] EN2 which seeks to protect, conserve and enhance the Forest of Bowland Area of Outstanding Natural Beauty. Along with Policy DMG1, these require development to be in keeping with the character of its landscape, reflecting local distinctiveness, vernacular style, scale, style features and building materials.

  5. Section 06

    [name]/Bats

    A Preliminary Roost Assessment has been carried out for the garden office at the rear of Bramley farmhouse. This building is described as being built about four years ago and the assessment found no evidence of it being used by bats. A Daytime Bat Survey identified the presence of bats in the detached garage and recommended dusk emergence surveys. A Bat Emergence and [name] (BERS) identified a number of commuting common pipistrelles and evidence of roosting brown long eared bats which indicates occasional use of the loft of the garage as a feeding/night roost. This would be destroyed when the building was demolished. Nesting birds were also found which would be disturbed.

    Amongst other things, mitigation, including pre-commencement inspection, the provision of a bat box and the avoidance of unnecessary lighting is suggested. For nesting birds, in addition to avoiding works during the nesting season and inspection of the site before demolition, two Swallow cups and an integrated Swift box should be provided.

    I have had regard to Regulation 9(3) of the Conservation of Habitats and Species Regulations 2017 (as amended) (the Regulations). As the competent authority, I have had regard to the requirements of the associated Directive and any likelihood that the proposal that might lead to the deterioration or destruction of the breeding sites and resting places of [name] (EPS) under Article 12(1)2. This includes bats and the places they roost, irrespective of whether or not they are present at the time the development is carried out. Given the mitigation measures recommended I have no reason to consider that Article 12(1) would be contravened.

    The BERS report further recommends that an application for a [name] (EPSL) to Natural England will be required to legally permit the proposed works. Furthermore, due to the number of roosts and species present, the site is eligible for a Bat Mitigation Class Licence (BMCL). A BMCL application requires surveys to be undertaken within the most active bat season, planning permission must have been granted and all relevant wildlife related conditions discharged prior to submission.

    The issue of such licenses is the sole responsibility of Natural England. The Council consider that a license will be unlikely although there is no indication that Natural England have been consulted on the planning application or this appeal. In considering whether or not the development is likely to be licensed, the views of Natural England are determinative. Although no such views seem to have been sought by the LPA, given that I have found harm under my first issue, I have not sought Natural England’s views in relation to this appeal. In any event, I have no reason to doubt that a mitigation license would not be issued on the basis of the 1 Ribble Valley Borough Council – [name] 2008 – 2028 A Local Plan for Ribble Valley Adoption Version. Adopted 16/12/2014. 2 Council Directive 92/43/EEC of 21 May 1992 on the Conservation of Natural Habitats and of [name] and Flora (the Directive). evidence before me. Furthermore, it is not for me to determine whether the legal tests for a licence would be met as this would duplicate the function of another regulatory body and would be contrary to the well-established principle that non-planning regimes are assumed to operate effectively.

    Consequently, the proposal would not conflict with Core Strategy Policy DME3 or the aims to protect habitats and biodiversity as set out in Chapter 15 of the Framework.

  6. Section 07

    Other Matters

    The appellant states that a single storey rear extension of the size and location as the proposed extension could be constructed utilising Permitted Development rights. Whilst this may be the case, the single storey rear extension is part of the total development attached to the proposed two storey building via a glazed link. Given that this is only part of the proposal, it provides a fall-back for this element only. The harm I have found relates to the proposal in its totality. My decision on this appeal does not preclude the appellant exercising permitted development rights.

    The appellant also refers to the single storey extension having a sedum roof to enhance sustainability and biodiversity. I also note that the proposal would incorporate sustainable construction techniques and the Framework, in Chapter 14, encourages proposals that incorporate energy efficiency and help meet the challenges of climate change. However, whilst these are material considerations, the Framework also recognises the importance of protecting landscapes and avoiding harm due to adverse visual impacts. The proposal fails on this latter point.

  7. Section 08

    Conclusion

    [name] have not found harm in relation to my second issue, I have found harm with regard to my first issue. Therefore, the proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. Consequently, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4161No official casework-database value to compare
    Extracted decision date · page 1
    13 June 2025Matches the official casework database
    Extracted site visit dates
    9 June 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3357501
Application reference
2024/0653
Lead case reference
Not recorded
Planning authority
Ribble Valley Borough Council
Planning authority code
E07000124

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
122 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 December 2024
Valid date
22 January 2025
Start date
13 February 2025
Planning authority decision date
30 October 2024
Appeal decision date
13 June 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
71200
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21