Appeal 3357538
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘construction of boundary wall/fence’.
Section 02
Decision
The appeal is allowed, and planning permission is granted for a boundary wall/fence at [site address] in accordance with the application Ref 24/01016/FUL subject to the following condition: -
The development hereby permitted shall be carried out in accordance with the following approved plan: 0020.
Section 03
[name]
The main issues in this case are the effect of the proposed development on: - • the character and appearance of the area; • highway safety in regard to exiting the site into [name] and visibility when turning from [name] into The Balk.
Section 04
Character and appearance
The appeal site is located within a residential area on a corner plot with a frontage to [name] and The Balk. It is accessed from [name] and occupied by a detached bungalow. The proposed development, which has already been constructed, comprises a 2m high wall and fence, following the site boundary from the access on [name] around the corner and along the frontage onto The Balk, replacing a previous hedge of a lower height and a mature oak tree (with TPO consent). The wall is constructed of random-coursed stone with pillars above in a cream render and vertically boarded fence panels in an oak-coloured finish.
The properties on [name] were built at the same time and to a consistent, modern style. They generally have open frontages and where there are front boundaries those are mainly hedges of a low height, resulting in an open character.
The Balk comprises dwellings of various ages and style, from the terraced Victorian cottages next to the appeal site to the 1960’s dwellings on the opposite side of the road set back behind grass verges and mature roadside trees and the more recent dwellings on the other side of the junction with [name]. Here there is a much greater variety in front boundary treatments that often reflect the character of the dwellings. They include both evergreen and deciduous hedges, walls of brick or stone, fence panels of various designs, pillars and both solid and open gates. In general, they are considerably higher, some up to 3m or so in height, and enclose the front gardens of the properties, providing a strong sense of enclosure along the lane.
The proposal is seen clearly in the approach in both directions along The Balk and to a lesser extent from [name]. As most of the frontage to [name] remains open, it does not harm the open character of that road. Although cream render is not a material generally seen in The Balk, the boundary is seen as a continuation of the style of the appeal dwelling, with matching stone and render materials. The stonework and fence panels sit comfortably when seen from The Balk against the backdrop of the stone gable end of the nearest cottage and fit in well with the stone boundary wall of the dwelling on the opposite side of the junction and with the other fencing elsewhere along the lane. The height is not disproportionate to that of other boundary treatments in The Balk and continues the sense of enclosure there. From what I have seen, the previous hedge was not continuous with a break where the tree had been removed and comprised different heights and species. Its condition and appearance did not sufficiently merit its retention and for the reasons given, the proposal is an acceptable replacement. It accords, therefore, with development plan policy LP57 in the Wakefield District Local Plan (2024) (LP) which seeks to ensure that alterations to dwellings accord with the style of the dwelling and do not harm the character of the area.
Section 05
Highway safety
At my visit I saw that [name] is a winding, residential cul-de-sac with low vehicle speeds and a limited amount of traffic. In regard to the exiting of the appeal site into [name], the appellant’s highways statement points out that the proposal has no impact on visibility for drivers when looking towards the end of the cul-de-sac. When looking towards the junction, even though the proposal is set slightly further forward of the previous hedge, the impact is marginal and has no detrimental impact given the low speeds and traffic volumes on [name]. From what I have seen, I would agree.
In regard to visibility at the junction of [name] and The Balk, the highways statement is evidenced by a speed survey report and demonstrates that both [name] and The Balk are lightly trafficked and subject to low vehicle speeds. When the speed survey results and relevant national guidance (Manual for Streets and Manual for Streets 2) are taken into account, the appropriate visibility requirement has been calculated at 35m to the north and 37m to the south, with an X distance of 2.4m at the junction. The highways statement includes a plan that shows the required visibility splays are achieved. My site visit findings confirm that, and the Council has not submitted any detailed evidence on this matter.
I conclude then that the proposal has not resulted in any harm to highway safety and accords with development plan policy LP27 in the LP which requires that development provides suitable access and does not unacceptably impact highway safety.
Section 06
Other matter
Representations received at the planning application stage referred to covenants imposed on the original development of [name]. Whilst those may be in place, this matter is not within the remit of the planning system and is a separate legal matter.
Section 07
Conditions
A condition specifying the approved plans is necessary for reasons of certainty. As the proposal has been completed and I have found that materials are acceptable, no further conditions are necessary.
Section 08
Conclusion
For the reasons given above, I conclude that the proposal accords with the development plan and there are no material considerations that would outweigh that. The appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 227No official casework-database value to compare
- Extracted decision date · page 1
- 12 March 2025Matches the official casework database
- Extracted site visit dates
- 25 February 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3357538
- Application reference
- 24/01016/FUL
- Lead case reference
- Not recorded
- Planning authority
- Wakefield Metropolitan District Council
- Planning authority code
- E08000036
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 2 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 December 2024
- Valid date
- 16 December 2024
- Start date
- 21 January 2025
- Planning authority decision date
- 13 November 2024
- Appeal decision date
- 12 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 66109
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21