Skip to main content
Official casework recordDismissedCurrent release

Appeal 3357885

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

‘Rear dormer loft conversion’.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    There is no dispute between the main parties that planning permission is required for the proposal and therefore, I have determined the appeal on the basis that development should be carried out in accordance with the development plan, unless material considerations indicate otherwise. Notwithstanding the appellant’s views on the merits of condition 20 on approval DC/05/44165, which restricted permitted development rights normally afforded to householders under The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), the proposal before me does not concern an appeal against that

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed rear dormer on the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal property sits within a small, modern estate constructed in the last 20 years, which consists generally of a mix of two and three-storey town houses, in detached, semi-detached and terraced formats. The properties are constructed from either red or red-brindled brickwork to the walls, and with a mix of plain or profiled concrete tiles to their pitched roofs. The individual dwellings are either two or three full storeys in height under their pitched roofs, with several of the two-storey properties with traditional pitched-roof dormers on their roof slopes, signifying that their roof spaces provide further living accommodation. There are also isolated examples of ‘flats over garages’ within the development, with traditional pitched-roof dormers which break the eaves line of the roof. The dormer design present is both traditional in nature, and consistent throughout the estate. I saw no ‘flat-roofed’ or ‘box’ type dormers or loft conversions at the time of my site visit.

    The appeal site is a two-storey end-terrace property with a pitched roof, which follows the two-storey pattern and style of development present in this area of the estate, and which presents its gable almost directly onto the rear of the footpath on [address]. There is a turning head to the rear of the appeal site, and [address] continues past the turning head, to provide vehicular access to several properties in a cul-de-sac at its end. As a result, the front, rear and gable elevations of the appeal property are clearly visible to vehicular or pedestrian users of [address] at this location.

    The appeal proposals consist of a flat-roofed dormer to most of the rear roof slope of the property. The vertical walls of the dormer are proposed to be clad in tiles to match the existing roof. However, the effect of the large flat roof and the dark tile hanging of the vertical walls, close to the planes of the existing rear and gable elevations of the property, will create a large mass to one end of the roof of the existing terrace of properties, significantly changing its visual appearance and the character of the immediate area.

    The dormer would be visually prominent to users of [address], either whilst using the turning head or travelling to and from the properties which take their access from the end of the road, appearing overly dominant. The scale and design of the proposed dormer does not follow that of the other dormers present in the area and would contrast harmfully with them.

    The appellant has stated that the proposed dormer would be in matching materials, of a conventional design in common use, and that in other circumstances could be done without planning permission. It is also asserted, that the design reflects the requirements of building regulations, and that the Council had not identified why the proposed dormer would be visually at odds with the surrounding area. Whilst the materials employed may match the existing, the way they are proposed to be used does not. The design of the dormer may well be common elsewhere, but not within the estate the appeal property is situated. The requirement for the proposals to be subject to the need to seek planning permission, has already been established and accepted by all parties. No evidence has been put before me which leads me to believe that this proposal would be the only means by which building regulations approval would be obtained for a dormer design.

    Furthermore, the Council have produced a ‘[name] 2014’ Supplementary Planning Document (SMBC-RRDG 2014). It is clear that the appeal dormer proposals accord almost directly with the example of unacceptable dormer design identified on page 26. This reinforces my findings.

    Consequently, the design and scale of the proposed dormer renders it prominent within the street scene and at odds to the pattern of dormer development within the surrounding area resulting in harm to its’ character and appearance. I therefore find it to be contrary to policy EOS9 of the Site Allocations and Delivery Plan Document 2012, which seeks, amongst other things, to resist designs that are inappropriate in their locality.

  5. Section 06

    Other Matters

    I note that the appeal proposals were amended during the application process, as identified by the drawings denoted with an A suffix. The amended design made only minor changes to the previous proposal, the [address] facing end gable of the dormer being moved inboard from the gable by a small amount, and the flat roof of the dormer being lowered also by a small amount. Those changes did not bring the dormer design in line either with the pattern of existing dormer development within the estate, or with the recommendations of the SMBC-RRDG 2014.

    I further note the appellants’ reason for pursuing the application being to provide independent sleeping accommodation for a disabled child. [name] have given due regard to the public sector equality duty for a person with protected characteristics under the Equality Act 2010, it has not been demonstrated that the appeal proposal is the only available option that might deliver the benefit to the appellant’s family. It is likely that other means to do so exist, which may not result in the harm that I have found. On that basis, I attribute limited weight to this matter and am satisfied that dismissing the appeal would be a proportionate response.

    The appellant asserts that a similar ‘blanket’ condition restricting permitted development rights evident on permission reference DC/05/44165 would be unlikely to be imposed now given current national policy and guidance. A recent appeal decision is highlighted in this respect. However, unlike the proposal before me, that concerned an appeal against a condition. The generic point made does little to address the specific harm identified in relation to the main issue.

  6. Section 07

    Conclusion

    For the reasons given above, I conclude that the appeal proposals would conflict with the development plan as a whole and that there are no material considerations that indicate that the development should be determined other than in accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4872No official casework-database value to compare
    Extracted decision date · page 1
    21 February 2025Matches the official casework database
    Extracted site visit dates
    10 February 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3357885
Application reference
DC/24/69701
Lead case reference
Not recorded
Planning authority
Sandwell Metropolitan Borough Council
Planning authority code
E08000028

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
19 December 2024
Valid date
19 December 2024
Start date
7 January 2025
Planning authority decision date
11 October 2024
Appeal decision date
21 February 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
65046
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21