Appeal 3357985
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of single-storey rear extension at first floor enclosing upon the roof terrace.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The main issues are: • The effect of the proposal on the character and appearance of the host dwelling, with particular regard to its location within the [address] Conservation Area (CA). • The effect of the proposal on fire safety.
Section 05
Character and Appearance
The CA Appraisal (CAA) notes that [address] development consists of three storey pairs and detached asymmetrical houses with highly idiosyncratic Gothic detailing. The area is noted for its uniformity of detail and form, and where uncharacteristic changes have been made, they are noted as having a negative effect. The CAA sets out one negative element of the area: ‘Extensions have had an impact on the area, and they are harmful where they have been poorly designed and spoiled the harmony of a group of buildings.’
The rear elevations of [address] properties demonstrate a variety of different types of rear extensions. Some rear outriggers are square in footprint, whilst others are rectangular; however, both types reach two, three and four storeys. Lower ground floor and ground floor extensions are prevalent and often are full width. A consistent factor is that a proportion of the first and second floor rear elevations remains undeveloped allowing part of the original building wall to the rear to be legible. This uniformity, including that as exhibited by the host building, forms a pattern which contributes positively to the character of the area.
The proposal is for a first-floor infill extension which would overwrite the original first floor form of the building at this location, development which is uncharacteristic of the surrounding properties on [address] and would spoil the harmony of the buildings. As such the proposal would harm the character and appearance of the CA.
Whilst the space between buildings in the area is limited and thus provides only glimpses of the rear elevations, the fact remains that views of the rear elevations are available from multiple other properties within the CA, adjacent and to the rear of the appeal site.
Section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 sets out that special attention shall be paid to the desirability of preserving or enhancing the character or appearance of Conservation Areas. Given the scale and location of the proposed development, the harm to the significance of the CA would be less than substantial, and towards the lower end of the spectrum of such harm, in terms of the National Planning Policy Framework (2024) (the Framework). Nevertheless, it is a matter of great importance and weight. I am required to balance this harm against the public benefits of the proposal.
The benefits of the scheme are predominately of a private nature. The public benefits of the scheme, to include employment opportunities during works, would be very limited in scope and temporary in nature. Therefore, I find that the limited weight to be given to the benefits of the scheme would not outweigh the harm identified above to which I attach great weight. Consequently, the public benefits would not outweigh the less than substantial harm, identified above, to the character and appearance of the CA.
Accordingly, the proposal would fail to comply with the Royal Borough of Kensington and Chelsea Local Plan 2024 Policies CD1, CD2, CD4, CD10, CD12, CD13 and CD15, and the relevant paragraphs of the Framework, insofar as they seek high quality design that respects local character and preserves or enhances the historic environment.
The appellant has submitted an image of [address], which shows substantial four storey and three storey rear additions. That development is not reflective of the wider pleasant uniformity and pattern of the rear elevations in this area. However, I have not been provided with any substantive detail of this development and as such I cannot be certain against which development plan and policies it was considered. The appellant has also highlighted development at [address] providing an appeal decision document; however, I have not been provided with any plans and as such I do not know what the cumulative impact of the extensions were. As such, and in any event, I have considered the appeal proposal on its own merits.
Section 06
[name]
I acknowledge that the appellant submitted a fire safety document which has been produced by an architect. The document concludes that the current fire safety measures are appropriate, that the addition of the rear extension at first floor would not create an inner room, and therefore the proposed development would result in no adverse effect on the existing fire strategy.
The submitted planning fire safety strategy provides justification for that conclusion which, amongst other things, confirms that the proposal would only be increasing the size of an existing bathroom without separation by a door, thereby ensuring the proposed en-suite does not become an inner room. In the absence of any evidence to the contrary, I find no conflict with Policy CD16 of the Local Plan 2024.
Section 07
Conclusion and Recommendation
[name] have found no conflict with policy in terms of fire safety, the proposal would result in harm to the character and appearance of the CA which is not outweighed by public benefits. As such, for the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 707No official casework-database value to compare
- Extracted decision date · page 1
- 1 July 2025Matches the official casework database
- Extracted site visit dates
- 26 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3357985
- Application reference
- PP/24/06221
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Kensington and Chelsea
- Planning authority code
- E09000020
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 December 2024
- Valid date
- 6 January 2025
- Start date
- 28 January 2025
- Planning authority decision date
- 13 November 2024
- Appeal decision date
- 1 July 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 72122
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21