Appeal 3358468
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
to build a crossover in front of the house.
Section 02
Decision
The appeal is dismissed
Section 03
Main Issue
The main issues are: a) whether the proposal would erode the provision of open space, and b) the extent to which the proposal would cause harm to the character of the site, the street scene and the wider area.
Section 04
Reasons
The appeal property is situated on [address], a main thoroughfare that runs through the north-eastern part of the city. The road is flanked by wide, green verges, interspersed with trees that separate residential development from the main road. The individual verges vary in length and depth, but are punctuated by road junctions and crossovers serving individual residential properties. Cumulatively they appear to function as a single green corridor that gives [address] a spacious and verdant character.
The proposal is for the installation of a simple vehicular crossover with a dropped kerb, surfaced in black macadam. The crossover would provide vehicular access to the appellant’s property (no.249).
The network of verges and greenspaces that flank [address] are included in the citywide [name] designation under Policy CP16 of the Brighton and Hove City Plan Part 1.
The value of the [name] designation is in its continuity, with numerous verges, parks and other areas combining to create a network of spaces across the city intended to contribute to the physical, mental and emotional wellbeing of residents.
The policy seeks to avoid the loss of designated open spaces except in very specific circumstances; none of which appear to apply to this proposal.
For the policy to be effective, it needs to be consistently applied. It is reliant on resisting development on numerous small parcels of land, in order to preserve the wider benefits of retaining an extensive network of open spaces. a) Consequently, I find the development would erode the provision of open space and would not accord with Policy CP16. (b) Harm to the character of the site, street scene and wider area
The proposed crossover is of a simple and conventional design similar to many others on [address]. The proposal would utilise a conventional method of construction and similar materials to crossovers in the area. Consequently, when considered in isolation, the proposal itself would appear reasonably well designed and scaled in relation to the host dwelling, and generally compatible with its character.
Notwithstanding this, the loss of designated open space would assist in eroding the overall provision of open space in the city. This cumulative impact would be harmful to the wider area.
[name] consider that the proposal generally accords with Policy DM21, the development would not make a positive contribution to a sense of place and therefore conflicts with Policy DM18.
Section 05
Other Matters
The appellant’s statement makes reference to a number of other crossovers that have been approved in recent years within the local area. These cases do not appear to relate to the loss of designated open space, so are materially different to this appeal scheme. In any event, each case must be determined on its own merits.
Section 06
Conclusions
In determining this appeal, I give significant weight to Policy CP16 and paragraph 104 of the Framework, which both seek to resist the development of open spaces. Whilst the design of the crossover is generally compatible with the character of the host dwelling and other nearby crossovers, this does not overcome the loss of open space. For the reasons explained above and having had regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 8028No official casework-database value to compare
- Extracted decision date · page 1
- 7 April 2025Matches the official casework database
- Extracted site visit dates
- 24 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3358468
- Application reference
- BH2024/01767
- Lead case reference
- Not recorded
- Planning authority
- Brighton and Hove City Council
- Planning authority code
- E06000043
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 January 2025
- Valid date
- 6 January 2025
- Start date
- 18 February 2025
- Planning authority decision date
- 14 October 2024
- Appeal decision date
- 7 April 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 67622
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21