Skip to main content
Official casework recordAllowedCurrent release

Appeal 3358603

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a 2 storey side extension, proposed single story side extension, basement extension, alterations to external materials and fenestration, and internal layout.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a proposed 2 storey side extension, proposed single story side extension, basement extension, alterations to external materials and fenestration, and internal layout at Ellesmere, Weybridge, Surrey [postcode] in accordance with the terms of the application, Ref 2024/1257, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with plan nos. 23-J4357 – 01, 23-J4357 – 02, 23-J4357 – 03, 23-J4357 – 04, 23- J4357 – 05, 23-J4357 – 06, 23-J4357 – 07, 23-J4357 – 08, 23-J4357 – 09, 23-J4357 - LP01.

    The external surfaces of the development hereby permitted shall be constructed in the materials set out at 4.4 of the Design and [name].

    No development above natural ground level shall take place until a bat habitat protection plan has been submitted to and approved in writing by the local planning authority. The bat habitat protection plan shall include the results of a bat emergence survey to be conducted in accordance with the recommendations at Part 8 of the [name] and Preliminary Roost Assessment Report by aLyne Ecology Ltd and; a) if the presence of bats is detected, a plan showing bat habitat protection zones; and b) details of development and construction methods within bat habitat protection zones and measures to be taken to minimise the impact of any works; and c) details of phasing of construction; shall be submitted to an approved in writing by the local planning authority. The protection plan shall be implemented in accordance with the approved plan.

  2. Section 03

    Preliminary Matters

    The National Planning Policy Framework (the Framework) was revised on 12 December 2024. Although the changes to the Framework include revisions to the Green Belt chapter, these are not material to this decision and the parties have therefore not been invited to make further comments in this regard.

    The appellant did submit additional information with the appeal, most notably the opinions of Counsel and a [name] and Preliminary Roost Assessment Report (PEA & PRA). Whilst the Council will not have had the responded to these documents, it is able to identify any factual error in the appellant’s grounds of appeal and any new material which were not available at the time it made its decision on the application. The Questionnaire highlighted that it was satisfied the procedure was appropriate for this appeal.

    As such I have taken into account the evidence provided by the appellant and am satisfied that no parties have been prejudiced as there is no substantial difference or fundamental change to the application1 and the Council have not been deprived of the opportunity to comment.

  3. Section 04

    [name]

    The main issues are:

    whether the proposal would be inappropriate development in the Green Belt having regard to the Framework and any relevant development plan policies including the effect of the proposal on the openness of the Green Belt, and

    the effect of the development on roosting bats.

  4. Section 05

    Effect on Green Belt

    The appeal site is within the Green Belt. Paragraph 154 of the Framework states that development in the Green Belt is inappropriate unless one of the certain exceptions applies. This includes, at paragraph 154 c), the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Original building is defined at Annex 2 of the Framework as a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally.

    Policy DM18 of the Elmbridge Local Plan Development Management Plan 2015 (ELP) states that Extensions and alterations to a building will be permitted provided they do not result in disproportionate additions over and above the size of the original building, either individually or cumulatively. Criteria i. to iii. set out that extensions should respond to the site, not result in an increase beyond 25% in volume and 25% in footprint and not materially increase the height of the building.

    The supporting text at paragraph 2.79 of the ELP specifies that the original building will be determined based on its size as existing on 1 July 1948 or as first 1 Holborn Studios Ltd v The Council of the London Borough of Hackney [2017] EWHC 2823 (Admin) built if later than this date. Whilst case law has shown that the supporting text is an aid to the interpretation of the policy but is not itself policy2, it remains pertinent here as no definition of “original building” is provided within the DM18. Moreover, this interpretation concurs with the appeal decisions and legal opinions provided by the appellant.

    The slight differences in wording between the Framework and the supporting text to ELP policy DM18 effectively amount to the same thing in this context. Namely, that the extension is judged against the building as it existed on 1 July 1948 or as built after that date. In this instance the existing building is a replacement of a former property and the one that sits on the site today, constructed circa 19993, is therefore the original. This interpretation matches a reasonable reading of both the definition in the Framework and the supporting text to policy DM18.

    The extensions and alterations to the property result in it being remodelled to a different style but this would not be at odds with the diverse range of homes in the area and responds to the site. It would therefore accord with criterion i. of policy DM18. The appellant has provided a calculation on the increase in the size of the dwelling and considers that the property would be increased by 24.5% in floorspace terms and 17.35% in volume and I have no reason to disagree with this calculation. The Council has only provided a calculation in relation to the pre-existing building that was on the site and, as explored above, I have not found this to be the correct interpretation of policy DM18 or the Framework definition. Therefore, the footprint and volumetric increases would comply with criterion ii. of policy DM18. The height of the extensions does not exceed the ridge line of the existing property such that compliance with policy DM18 iii. is achieved.

    From a spatial perspective, the development remains subordinate to the original building as was original and first built in circa 1999. From a visual perspective, the most noteworthy side extension would project to the side of the house and extend the built form in this direction. However, it would fill in an existing corner between the staff wing and garages and the main house. Although it would occupy a relatively elevated position, this would be an inevitable consequence of almost any extension to the side or rear due to the surrounding undulating topography. In any case, the site remains well screened by many mature trees and other landscaping to all boundaries. Whilst the extension would be visible in some views from the surrounding area, this is likely to be minimal, especially in summer months.

    I therefore conclude that the proposal would not result in disproportionate additions over and above the size of the original building, would not result in harm to the openness of the Green Belt and would comply with policy DM18 of the ELP and provisions of the Framework.

  5. Section 06

    Effect on bats

    The appeal was submitted including a PEA & PRA. This document identified a high suitability to support roosting bats in the existing buildings on the site. It further identified a need for further emergence surveys however these can only be carried out in the May to September period. The appellant has indicated that such surveys have already been commissioned to be undertaken in the appropriate season. 2 Cherkley Campaign Ltd, R (on the application of) v Mole Valley District Council & Anor [2014] [name] 567 3 Council ref 1999/1469

    I have therefore imposed a condition requiring the submission and approval of a bat protection plan during construction works following the completion of the emergence survey. This will ensure that the effect of works on bats is mitigated. In any case, I am aware that bats are further protected under other legislation and it is not necessary for me to impose conditions here that duplicate this other legislation.

    I have had regard to the further recommendations regarding bats in the PEA & PRA however these predominantly relate to levels of illumination from light sources and my ability to control these through the use of planning conditions here is limited as such lighting installations may not require planning permission or would otherwise have deemed permission (commonly known as permitted development).

    I conclude that, with a condition, the proposed development would not have an adverse effect on roosting bats and the development therefore complies with policy CS15 of the [name] 2011 and DM21 of the ELP insofar as it would preserve, manage and where possible enhance existing habitats, protected species and biodiversity features.

  6. Section 07

    Conditions

    I have imposed a condition to ensure the development is commenced within three years of the date of this decision to accord with the provisions of the Act. A condition relating to adherence to the approved plans is imposed for certainty.

    Considering the general remodelling of the existing fenestration I have imposed a condition relating to the materials to be used in the development to be those which are set out in the Design and [name].

    My rationale for the imposition of the bat protection plan is set out above.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the proposed development would not be inappropriate development in the Green Belt, nor would it have an adverse effect on roosting bats. The development therefore complies with the provisions of the development plan and the Framework, and the appeal should succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5437No official casework-database value to compare
    Extracted decision date · page 1
    26 March 2025Matches the official casework database
    Extracted site visit dates
    18 March 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3358603
Application reference
2024/1257
Lead case reference
Not recorded
Planning authority
Elmbridge Borough Council
Planning authority code
E07000207

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
202 m²
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
8 January 2025
Valid date
8 January 2025
Start date
22 January 2025
Planning authority decision date
23 October 2024
Appeal decision date
26 March 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
66928
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21