Appeal 3358691
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the change of use to a flexible commercial, educational, cultural and community use including dance studio and ancillary office, use class E(d), class F1(a-f) and F2(b) and associated works including 2 no. additional circular windows on east elevation – variation of
Section 02
Decision
The appeal is allowed and the planning permission [name]/24/01317/FUL for a change of use to a flexible commercial, educational, cultural and community use including dance studio and ancillary office, use class E(d), class F1(a-f) and F2(b) and associated works including 2 no. additional circular windows on east elevation at [site address] , [name], [site address] , Chichester [postcode] granted on 7 November 2024 by Chichester District Council is varied by deleting condition 8 and substituting it with the following condition:
When music is being played, the external door to the entrance reception in the northeast corner of the building (former vestry), and at least one pair of doors in the lobby at the western end of the building shall be closed except for ingress and egress or emergency fire escape purposes.
Section 03
Preliminary Matters
The permission granted under CC/24/01317/FUL was itself a proposal to vary 2 conditions attached to a previous permission for the same substantive use granted under CC/21/02511/FUL. The 2 conditions related to the permitted hours of operation of a dance school which uses the premises, and a requirement that all doors must be shut when music is being played.
The appellant sought to modify the latter condition to remove the requirement that all doors must be shut to one where one set of doors in the entrance reception and one set in the lobby at the western end of the building should be shut when music is being played, except for ingress and egress. The Council granted planning permission for the variation of the 2 conditions but imposed an alternative condition relating to the closure of doors when music is being played. That condition (no.8) is set out above in the banner heading. In effect it requires that after 2000 hours (8.00pm) all internal and external access doors to the hall be closed, except for ingress and egress. It is this condition that is the subject of the appeal, and which I consider in more detail below.
The application originally proposed to vary another condition to allow use of the premises until 2330 hours. This proposal was withdrawn during the course of the application. It did not form part of the proposal on which the Council made its decision, nor does it form part of the current appeal.
I have simplified the description used in my decision to avoid confusion with the numbering of the conditions as they appear on the Council’s decision notice for CC/24/01317/FUL. For the avoidance of doubt, that decision permits the use of the premises for a ballet school between 0800 and 2200 hours as set out in condition 5.
Section 04
Main Issue
The main issue is the effect of modifying condition 8 on the living conditions of neighbouring occupants in respect of noise.
Section 05
Reasons
The permitted use of the building allows a range of activities to be carried on, including ones that may include amplified music. However, there are residential properties in close proximity to the building, and it is necessary to impose conditions that minimise noise disturbance to the occupants of those neighbouring properties. Condition 8 is one such condition.
The hall in which activities are carried out can be accessed from two directions. There is a set of doors from the reception consisting of an internal door to the hall and a separate external entrance door. There is also a set of doors in the western end of the building consisting of 3 pairs of doors (1 external, 2 internal). The Council’s Environmental Protection team has no objection to a variation of the condition so long as at least one door or pairs of doors in each of these sets of doors are kept closed when music is being played.
It is apparent that there have been instances of noise disturbance when the premises have been hired out for parties or receptions. Having regard to the observations made by local residents, it appears that instances when noise has emanated from the hall is because all the doors at one or other end of the building have been propped open, contrary to the terms of the condition. The noise disturbance therefore results from a failure to comply with the condition rather than a need to have more than one door in a set of doors closed at any one time. The responsibility for ensuring doors are closed is a matter for the operators of the property. If breaches of the condition were to continue, then it would be open to the Council to consider whether it was expedient to use its enforcement powers.
Paragraph 57 of the National Planning Policy Framework requires that planning conditions should be kept to a minimum and only imposed where they are necessary, relevant to planning, enforceable, precise and reasonable in all other respects.
In this case I consider that a condition requiring the closure of doors is necessary and relevant to planning in the interests of minimising noise disturbance to neighbouring occupants. However, as drafted condition 8 goes beyond the minimum control necessary in requiring all access doors to be closed when closing one in each set of doors is sufficient for noise suppression purposes. I therefore consider it should be reworded to require the latter rather than the former level of control.
I have considered whether for enforceability the external doors should be required to be closed when music is playing. However, there are occasions when external access is needed to the toilets and kitchen from the western end of the building to avoid disturbance to activities in the hall. If the external doors in the western elevation are open, it will still be apparent to an observer on [site address] whether one of the internal pairs of doors are closed. I therefore consider that a form of words requiring only one of the pairs of doors in the western lobby to be closed is enforceable. However, the internal door between the entrance reception and the hall is not readily visible from outside. I therefore consider that for enforceability the condition should require the external door to the reception to be closed when music is playing, except for ingress and egress.
In terms of precision, there is some ambivalence between the wording used in condition 8 to describe the rooms and the labelling used on the accompanying plans. For conciseness, I consider that the condition wording needs to be consistent with the labels on the plans. I have therefore referred to the ‘reception lobby’ as the entrance reception in the northeast corner of the building (former vestry); and the ‘western entrance’ as the lobby at the western end of the building. Given my conclusion on enforceability, there is no need for the last sentence in condition 8. As well as allowing doors to be opened for ingress and egress, I have also added that they can be opened for fire escape purposes.
Section 06
Other Matters
The building is grade II listed. Its architectural and historic interest lies in its previous use as a church, its classical design and unusual materials including the form of galletting around the coursed stonework. I have a duty under Section 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to have special regard to the desirability of preserving the building and any features of architectural or historic importance that it possesses. A similar duty under Section 72 applies to preserving or enhancing the character or appearance of the Chichester Conservation Area. Modification of condition 8 in the manner proposed would not have any appreciable effect on the significance of the listed building. Similarly, it would not have any harmful effect on the character or appearance of the Chichester Conservation Area.
I am aware that disturbance has also been caused on occasion by rowdy behaviour and that sometimes use of the hall places additional demands on parking space in the area. However, these are not matters that are relevant to condition 8 and therefore not material in this appeal.
Section 07
Conclusion
I conclude that the appeal should be allowed and condition 8 varied in the form set out in my decision.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 244No official casework-database value to compare
- Extracted decision date · page 1
- 7 November 2025Matches the official casework database
- Extracted site visit dates
- 4 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3358691
- Application reference
- CC/24/01317/FUL
- Lead case reference
- Not recorded
- Planning authority
- Chichester District Council
- Planning authority code
- E07000225
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Other
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 9 January 2025
- Valid date
- 21 January 2025
- Start date
- 12 February 2025
- Planning authority decision date
- 7 November 2024
- Appeal decision date
- 7 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 79261
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21