Appeal 3359134
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the removal of a garden room and erection of a two- storey extension without complying with a condition attached to planning permission ref: 17/00307/HP.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
An enforcement notice for the development which the s.73 application sought to regularise is the subject of a separate decision (ref. APP/H1840/C/25/3358435).
Section 04
Reasons
Planning permission was granted under 17/0030/HP in 2017 for the removal of a garden room and erection of a two-storey extension to the side of the dwellinghouse. The two-storey extension was not built in accordance with the approved drawings.
To regularise the planning position, the appellant submitted an application under s.731 of the 1990 Act to vary the design of the extension. This application was subsequently refused (ref. W/24/02082/HP) on the grounds that the development was unduly dominant and incongruous within the street scene and failed to appear subservient to the host dwelling, resulted in overlooking, and that the increase in the bedroom numbers without adequate parking provision would cause highway safety concerns.
The Council also reasoned that there was no evidence to demonstrate that the development commenced within the three-year time limit. Consequently, it considered that a s.73 application was not an appropriate mechanism to regularise the retrospective development. An enforcement notice was issued in December
The notice does not recognise the 2017 permission as forming a basis for remedying the breach of planning control in accordance with section 173(4)(a) of the 1990 Act, implying that the permission had lapsed unimplemented. 1 Application for Removal or Variation of a Condition following Grant of Planning Permission
The appellant asserts that a material start was made in February 2020 by demolishing the garden room and digging foundations for the rear wall of the extension in accordance with the approved plans. No pre-commencement conditions were attached to the permission. Work ceased due to the Covid pandemic and resumed in 2023, with what the appellant describes as “minor changes” to simplify the build.
Under s.56 of the 1990 Act, development is taken to be begun when a material operation comprised in the development is carried out. However, case law, including Atwill, R (On the Application Of) v New Forest National Park Authority [2023] EWHC 625 (Admin), which I brought to the parties’ attention, confirms that the operations relied upon must be ones properly undertaken pursuant to the grant of planning permission. [address] in Atwill held that works cannot be treated as implementing a permission if they ultimately form part of an unauthorised development. Thus, if the development differs materially from those plans, the works cannot be treated as lawfully implementing the permission.
In essence, it is not the intention behind the works or whether some of the earlier works – done within the time limit for commencement – were in accordance with what was permitted; what matters is whether the finished building is materially different from what was permitted, such that it constitutes a breach of planning control.
A material difference is a change to the approved plans that is substantial enough to alter the nature or scope of the development. These changes go beyond minor tweaks and can affect things such as: the size or scale of the building (e.g., increased height, footprint, or volume); design and appearance (e.g., major changes to elevations, roof form, or fenestration); and impact on surroundings (e.g., overlooking, overshadowing, or highway safety).
The width of the extension has been increased by approximately 1.4m to the common boundary, enlarging the floor area over two floors. The ground floor, originally intended as garage space, now provides primary living accommodation as a self-contained annexe. While the garage door remains externally visible on the front elevation, three small openings have been inserted at head height, and a pedestrian door has been installed alongside. At first floor level, fenestration intended for an en-suite bathroom has been replaced with full-length glazed French doors and a Juliette balcony for a bedroom.
In my judgement, the changes differ materially from the 2017 permission. There are planning consequences to these changes in terms of the potential impact of the development on the living conditions of the neighbouring occupants concerning outlook and privacy, and the effect of the development on the character and appearance of the host dwelling and the street scene. The increase from three to five bedrooms also raises concerns about parking provision and highway safety.
Applying the principles in Atwill to the circumstances of this case, I find that the demolition of the garden room and the laying of foundations for the rear wall cannot properly be regarded as material operations pursuant to permitted development. Even if that was the intention at the time, the reality is that these operations have ultimately formed part of the unauthorised development.
Consequently, the original 2017 permission has lapsed. Section 73(4) of the 1990 Act provides that s.73 does not apply if the previous planning permission was granted subject to a time condition within which the development was to be begun and that time has expired without the development having been begun. That is what has occurred here, and so a s.73 application cannot be used to regularise the development, which is unauthorised.
Section 05
Conclusion
The development materially departs from the approved plans and therefore does not constitute lawful implementation of the 2017 permission. In the absence of a valid permission, the section 73 application cannot succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 354No official casework-database value to compare
- Extracted decision date · page 1
- 9 December 2025Matches the official casework database
- Extracted site visit dates
- 21 October 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3359134
- Application reference
- W/24/02082/HP
- Lead case reference
- Not recorded
- Planning authority
- Wychavon District Council
- Planning authority code
- E07000238
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 2. Refused permission to vary or remove a condition(s)
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 30 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 17 January 2025
- Valid date
- 17 January 2025
- Start date
- 26 February 2025
- Planning authority decision date
- 28 November 2024
- Appeal decision date
- 9 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81085
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21